My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1A, TCAAP Zoning Project
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
03-29-10-TCAAP-WS
>
1A, TCAAP Zoning Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:04:42 AM
Creation date
5/11/2010 9:23:07 AM
Metadata
Fields
Template:
General
Document
TCAAP Zoning Project
General - Type
TCAAP Zoning Project
Date
3/29/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT <br /> Completion letter from the MPCA prior to the issuance of the Certificate <br /> of Occupancy by the City for any phase of development. <br /> Subd. 12. Sustainability Component. The PUD Master Plan shall incorporate green <br /> building and design principles where feasible, such as Leadership in Energy and <br /> Environmental Design (LEER) standards. This may include using the Army-s water <br /> treatment process to develop a geothermal energy generation capability and/or the use <br /> of land for solar or wind energy generation. <br /> Subd_ 13. Contractual Component. This applicant shall submit agreements or <br /> contracts affecting the owner or owners of individual units or of the entire project <br /> proposed under the PUD Master Plan, such as hon�eownrs' agreements, business <br /> improvement areas, and covenants. <br /> Subd. 14. Financial and Resource Component <br /> A. The redevelopment must demonstrate ghat its tax base will support the <br /> long-term maintenance of the on,, .:.in and support City -- <br /> services including, but not limited to, police, fire, inspections, and <br /> maintenance of roads and parks. �`he pity may require a detailed pro <br /> forma. <br /> B. The applicant shall be responsible for all costs related to studies, <br /> consultants, and City staff time needed to facilitate the review of the <br /> application. The City reserves the right to select or reject any consultant. <br /> . All development and permitting fees in the City's fee schedule apply, <br /> incldng the.metropolitan Council and Arden Hills sewer access charge <br /> and water access charge.. <br /> Subd. 15 P1anned Unit Development(PUD)Final Plan. <br /> A. Procedures. The applicant for a PUD Final Plan approval of a specific <br /> phase Of.the PUD Master Plan shall complete and submit to the zoning - <br /> administrator an application on such forms as are provided by the <br /> administrator. In addition to this documentation, a written statement that <br /> the Final Plan is in conformity with the PUD Master Plan as approved by <br /> the Council. <br /> B. Development Agreement and Bonding to Assure Performance and <br /> Conformance to PUD Final Plan. To assure that all improvements to be <br /> constructed as part of the approved PUD Final Plan are completed in <br /> accordance with the terms and conditions of such plan, or each phase <br /> thereof as outlined in the construction order component, the City Council, <br /> at the time of its approval of said PUD Final Plan and related plats may <br /> require the applicant to enter into and file with the administrator a <br /> DRAFT-3/23/2010 <br /> Page 13 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.