Laserfiche WebLink
program. The VIC program covers non-petroleum contaminants. While the <br /> programs are separate, there is interaction between the programs. <br /> o Before building permits are issued, the MPCA recommended that a Response <br /> Action Plan (RAP) with approval from VIC and Petroleum be completed. The <br /> RAP details the steps needed to remediate the land to the level needed for a <br /> particular land use. The MPCA recommended against waiting to issue building <br /> permits until remediation is completed because the RAP often uses building <br /> construction and site layout as part of the remediation (for example, a parking lot <br /> over a contaminated spot or a ventilation system for vapor intrusion). Instead, the <br /> City may be able to withhold Certificates of Occupancy until the developer <br /> provides the "Certificate of Completion" from the VIC program and the <br /> "Development Completion" letter from the Petroleum program. This certificate <br /> and letter are considered the highest level of assurance that the remediation has <br /> been completed to MPCA requirements. <br /> Attachment - <br /> Draft Zoning Regulations for the Mixed Residential and Mixed Business Zoning Districts (dated <br /> March 23, 2010). <br /> City of Arden Hills <br /> C.-Documents and Settings lbecky.brazys 1ocal Settings)Temporary Internet Files DLKISFW32910-CCMemo-TCAAP Planning Process.doc <br /> Page 4 of 4 <br />