My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8A, CP Rail Bridge Trail Update
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
05-24-10-R
>
8A, CP Rail Bridge Trail Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 10:05:33 AM
Creation date
5/21/2010 10:54:10 AM
Metadata
Fields
Template:
General
Document
CP Rail Bridge Trail Update
General - Type
CP Rail Bridge Trail Update
Date
5/24/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CANA�fAN PACf�iClS MtNIMUM SAFETY REQULREMENTS FOR CONTRACTORS WQRKIIVG �PI <br />RAlLWAY PROPERTY f5 THE MlNtML1M SAFETY RE4EJtREMEIYTS TQ BE FOLLOWE� AT ALL TIMES. <br />�Ote — <br />Priar to the comrrtencement of any wark at the worksE�e, a local safety orientation mus� be conducted in <br />con�unction with Canadian Pac�fic and shafl include the follawing: <br />• Hazard identrficatian / risk assessment of hazards inherent in �he work to be undertaken ar <br />generated by �he �ork proeesses ta be used. <br />• Var�ous con�ro[s �sed �o r�itigate risk of the hazards present both as a result of the railway <br />and contrac�or work processes. <br />• Laca� communEcation procedures incfuding ernergency call-out / respanse. <br />• Loca! evacuation procedures. <br />Initialed by: 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.