My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8A, CP Rail Bridge Trail Update
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
05-24-10-R
>
8A, CP Rail Bridge Trail Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 10:05:33 AM
Creation date
5/21/2010 10:54:10 AM
Metadata
Fields
Template:
General
Document
CP Rail Bridge Trail Update
General - Type
CP Rail Bridge Trail Update
Date
5/24/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pers�nnel sha(� stay away fram any Q�her railway devices they are unsure of. <br />Persanne� shalE �ot distur� o� fou� the ba[�as� at any time. <br />7.f .11 Persanne� shal� no� fauf t�e track wi�h an� piece ofi equipmen� withou� a�P <br />flagpersan and proper protection. <br />7. �.� 2 Cer�ain pro�ects wi�l require the assistance o� a qua�ified flagperso�. The <br />decision as t� w�e�e flagpersons ar� req�rired rests with C�'. One week adv�nce <br />na��ce is required be�are enteri�g Ra�Eway property so that fla��i�g pratection <br />requ��emen�s ma�r be deterrninecf and arranged far. <br />7.1.�3 Gooc� corr�municat'ron �aetv�een Cont�actor Personnel and CP's f�agperson is <br />imperat�ve. Everyone must �ave know�edge of the f�agging �imits, time limits and <br />�ocatio� to c[ea� for any �rain r�overx�ents. �P's f�agperson w��l be respa�si�fe for <br />clea�i�g any rno�ement of workers anc� equipr�er�� near �he tracks, no matter how <br />mir�or. <br />7.1.14 Cantractar Pe�sonr�e� sha�l r�a� interfere with a CPss flagperson v�rho ts <br />�omr�un�cating by radio wi�h the dfsp�tcher or other �P employees. Personr�e� <br />sharl wait unti[ t�e flagperson is fin�shed and able to give them fufl attention. <br />Pe�sannel si�af� nat assume a rnove is cleared by something overheard on a <br />radio conversation. <br />7.1.15 Persanne� s�aC! nat move eqc�ipmen� across the t�acks exeept at �stab��shed road <br />crossings, o� unfess under the protectian and autharizatfon of a�P f[agperson <br />anc� a�ly if the job site �as been properly p�epared �or sucl� � rnove. Tracked <br />eq�ip�nent w�l� require a CP flagpe�sar� any tirr�e raflroad tra�ks are �rossec�. <br />�.1.16 Persor�nel shall not mave equ�pment acrass railroad bridges ar through tunne[s, <br />except as expressfy agreed by �P, and under such conditions as stipulated by <br />CP, ine�udir�g without [imitation, a CP �Iag�erson. <br />7.1.� 7 The Con�ractor shall keep al! Gantraetor per�on�el informed of current weather <br />condFtions. Persannel shalf stay alert f�� possibCe high water conditions or f�ash <br />f[oods. D�ring severe weather condit�ons: <br />• F��rsonneE sha�� be preparec� ta t�ke cover in the event of a tornado. <br />• Personne� sha[f not work whEle lightning is oceu�r�ng; <br />• if storm conditions arise unexpectedLy, Contractor Personnel shalf ensure that <br />equipment is �n the clear af the tracks anct secured before seeking �over. <br />CQntractor P�rsonne� sha�[ stay away from railroad tracks when visibi�ity is <br />poor, such as during fog or blizzard conditions. <br />SR8 TUOLS, EQt11PMENT AND MACHINERY <br />8. � All Contractor equiprnent, machinery �nd high�ray vehicles must: <br />Initialed by: 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.