My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8A, CP Rail Bridge Trail Update
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
05-24-10-R
>
8A, CP Rail Bridge Trail Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 10:05:33 AM
Creation date
5/21/2010 10:54:10 AM
Metadata
Fields
Template:
General
Document
CP Rail Bridge Trail Update
General - Type
CP Rail Bridge Trail Update
Date
5/24/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Person�el or� ��e work si�e understand t�e conter�t of �he �o� briefing. CP <br />represent�tive(s} or desig�a�e� may attend at CP's sale discretion an� sha�! inclucle ��e <br />particEpatio� a� �F�e CP F�a��er�an rf preser�t at the warksite. <br />� 3.3 �he fo�fow�ng �opFcs s�auld �e eoverecl in the �ab br�efi�g: <br />• Tasks ta be acco�np�is�ed; <br />• Work �oca�ian; <br />• Cont�actor Personnei respor�s���lities; <br />• Equipment to be used; <br />• Specific s�fety rern�nder due to a hazarctous condf��on; <br />•�den�if�ca�ior� o� al� pa�ent'ral �azards specific ta the area(s} in which they v►ril� be <br />worki�g and the tasks �hey are performin� � <br />• S�ec�af instructi�ns c�ue �o ar� un�rsual situa�ion or practice; <br />• Type af track protection a�ong with i�'s tErr�e and physical limits and identifica�ior� of <br />CPfs employee respansible for the pra�ection; <br />• Ernergency r�sponse ��an/evacuation procedures. <br />SR14� C4t�'i'RAG'i'QR SAFETY POLICY <br />f 4.1 Prior to the cor�mencement of any work, the Cor�tractor shall provide CP with its <br />app�icable safety polic�es, ru�es and procedures. <br />SR15 CONSTRUCTION SAFETY PLAN <br />15.1 Prior to commen�ement o� any canstruction work, �he Con�ractor shall provide CP with a <br />�onstruction Safety Plan. <br />�5.2 The Canstruction Safety P�an shall: <br />� 5.2.1 List and defir�e the constr�ction methads that wil[ be used fQr each majQr �F�ase <br />af tf�e work and describe ��e process and safety procedures ta be i�corparated. <br />15.2.2 Integrate t�e necessa�y safegua�ds to be �mplemented �n the work's plann�ng <br />schec�ules. <br />15.2.3 Lis� al� safety activ�ties and t�eir frequency inclucC�ng: <br />• Cantrac�or Personnel's Review of: <br />■ Canadian Railway's M'rnimum Safety Requirements for Cantractors <br />Working an Rail�vay Property; <br />Initialed by: � 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.