My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8A, CP Rail Bridge Trail Update
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
05-24-10-R
>
8A, CP Rail Bridge Trail Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 10:05:33 AM
Creation date
5/21/2010 10:54:10 AM
Metadata
Fields
Template:
General
Document
CP Rail Bridge Trail Update
General - Type
CP Rail Bridge Trail Update
Date
5/24/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15.2.9 P�ovide �he iayout of cranes, proposed f ifti�g �racedures and ather pertir�ent <br />informatior� sucf� as cranes} capacity char�s, v�rork�ng radius, �aads, possible <br />abstac�es or site restr�ct�onsl etc. <br />15.2.1 Q Provide an EmergenGy lnformation Sheet fQr not��yEn� medical assistance, <br />emer�ency �ransportat�on a�d direct�on of reseue o�erationss �nc�uding the <br />infarrr�a�'ron ident�fied �r� appendeci Tab[e A. Copies o� �his dacument shall be <br />present on site �t a�l t�mes a�� be �n a�ocat�on �eadi�y acces�ib�e to a�l <br />Contrac�or Personne� on the s�te. �ts conte�t sha�[ be reviewed a� the beg�nning <br />o� �ach vveek and when job focat�an c�anges. The Car�tractar must ensure tha� <br />all �ontraE�or Personne� an the work site are farr�iliar wit� its contents. <br />15.3 7l�e Safety P�an s�a�� also include draw�ngs and speci�ications prepared, sealed and <br />signed by a qua�ified pro�essional eng�neer, for eac� af the foflow�ng iter�s, whenever <br />appl�ca�le ta fhe work: <br />� 5.3.� Det�ils a� the design, erect`rons use and inspection of fall prevent�on structures <br />such as sca�folding, work platforrns and other staging. T�ese are manc�atory <br />w�erever Contracto� PersanneE are warki�g a� heights �r� excess of 8 fee� (2.44 <br />�neters}, i� Ganada o� � 0�ee� �3.a5 rne�ers}, �n the I�SA, abave the nearest <br />per�nanent safe leve� or where a drawning hazarc� exists. T�tis requirer�en� does <br />no� app�y where pre-eng�neered scaffolding is used as a�alr p�eve�tia� deviee; <br />provided it is used 'rn accordar�ce with the manufac�urer speci��cations and �s <br />des�gnec� �o mee� a�l appCicable �egFs�ation, regula�io�s and cQd�s. <br />Detai�s of fa�! protect��n systerns when rt is p�ysica[ly impossible to provide safe <br />fal� preve�tiar� structures or �rhen warkrng or� a�emporary struGture �ore than 20 <br />feet (6. � 4 mete�s} �n Canada and as per health and safety legislation, �egu�ations <br />and codes appli�abfe ta the �vark in the US, above the neares� perr�anen� safe <br />leve[. PersonaL fall protection equip�ent sha[I �nc�ude a CSA ar ANSI approved <br />full body harness, fanyard and shock-absorbing �evice, attached ta a GSA or <br />ANS� approved or engineered anchored life�ir�e or fixed anc��r. The system shal[ <br />also provide a retrieval device or equipment readily avaifab�e an the work s�te. <br />Safety nets are acceptable ir� �ieu Q� persona� fa[[ protection equ'rpment� if it is <br />Empracticable to use a fal! pr�tectior� system. The �ontractor shali also provide a <br />fal� rescue plan to be used in accardance wEt[� any fail protec�ton plan as <br />req u i red . <br />15.3.2 De�a�ls o� shoring systems fo� exeavations, wh'reh may endanger nearby <br />Con�ractor Personne! or structures. Shoring systems shaf� be designecf to corn�ly <br />with appficable �egisiation, regufations and cades. Excavations mus� be proper[�r <br />co�ereci ar barricac�ed wi�h approp�iat� reflect�ve equipment. Lights or �lares must <br />be used where prac�icabfe. <br />SR16 CC}MPLIANGE 1NI'TH SAFETY REQt11REMENTS <br />16.1 �� ever the Contractor's Personnel do r�ot carr�p�y with the �afety requirements, the <br />Con�ractar's s�te supervisor will be rerr�indec[ o� the requ�rements by the CP's <br />representat'rve. !f Contractor Personnel refuses to comply with tl�e safety requirements, <br />the Contractor wiCi be required to ensure that such Contractar Personnei immediatery <br />Initialed b�: � 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.