My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-15-10 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Packets (2010 to Present)
>
2010-2019
>
2010
>
06-15-10 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2024 12:32:51 AM
Creation date
6/15/2010 9:05:30 AM
Metadata
Fields
Template:
General
Document
6-15-10 PTRC Packet
General - Type
6-15-10 PTRC Packet
Date
6/15/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> level is at a moderately low level usually associated with low visitation or remote <br /> parks. Parks categorized in this level: Johanna Marsh and Lindey's <br /> Level IV: Low level of maintenance usually associated with low level of <br /> development and undeveloped areas. This generally includes areas where ground <br /> cover shall be left in a non-maintained (natural) condition. Examples include <br /> wooded areas, open spaces, wetlands, and community preserves. Parks categorized <br /> in this level: Crepeau Nature Preserve <br /> Each level lays out a recommended maintenance plan that is designed to act as a guide to <br /> help with the upkeep and maintenance of each level park. Each of our parks focuses on <br /> different activities and has different levels of use. This plan is designed to help staff <br /> maintain each park at the level that is most appropriate for its general day to day use. Our <br /> playground equipment and hard surface replacement schedules have been included in the <br /> plan and are important to the overall upkeep and safety of our parks. The park ar equipment <br /> p <br /> (mowers/vehicles/tractors/etc...) is listed within the Capital Improvement Program. <br /> Staff is currently working on adding trail maintenance to this plan. <br /> Although this process <br /> g <br /> is in progress, staff has not completed this portion of the plan. Good ointe Technologies <br /> p g <br /> assessed our trails and gave each a rating. These ratings will help to establish a <br /> replacement schedule. Specific maintenance tasks for each trail need to be created similar <br /> to the proposed park maintenance standards. Staff will continue to work on this and bring <br /> back to Council for review at a later date. <br /> Budget <br /> All City parks used to receive fertilizer and weed treatments two-three times a year. <br /> However, after 2006, the Public Works Department cut these applications out of the yearly <br /> y <br /> schedule. The turf in all of the City parks is in poor shape. The proposed maintenance <br /> plan recommends fertilizer and weed control 2-4 times a year, depending on the level. <br /> Once a regular schedule is established, there will be some parks that will only need <br /> fertilizer as needed. Below is the program that staff has established for this <br /> spring/summer/fall in our parks and the estimated supply and labor cost: <br /> ::::: :: ::::::::: ::::::::::::::: :::::: :::::::::::::::::::::: : ::::::::: :::::':::::::::: ::::::::::::::;:::::::::::::::::::::::: :.:::: : :...... ...:.::. <br /> . .... ......... ............... <br /> :::::::::::::::::::::':: : :: . .. <br /> :::::::: ::.:::.:.:.:.:: ::;.:...::::.::::: ::::.::::::::::::::::::::. ::::::::.::::':::;:;:::::::: ::::::::::: :::. ::::: : :::. .. .. XXX <br /> T :-, is" iii::: ^}:.i.:•i: .. .: n.:. i:i':.:..::ii::.:...:. ryii:is i::.•?::'v'..:vv.?'.:ii'.:'.ii:: :iiiiiiiiii:.i:;.;.::v:::<:'::i::::':.:::::.i.i::::::::..::iii:<_i::::':;:::::( <br /> i::...:::: :: :. :: : .. ::::::::iii:: ........ ..v. EL....�.. 3 ^::::::::::::::::: ::::: :::.:::::::::::.::::::: <br /> 4 A l�catlo nS ...d fin. ............................... <br /> din ........ <br /> ... . ..� <br /> ::.::..::...............:::::,,.::::.:::::::::.::::::::::::::::::::::::::.::::::::::::::::::::::..:.:::..:::::::.:::::::::.:::::::::::::. <br /> ..:.......................................... <br /> .............................. <br /> Bags of #of Total Total Labor Cost 2010 Annual Fertilizer <br /> Product Applications Product Cost <br /> Cost <br /> Charles 22 at 3 $990 1.5 hrs x 3 x $1,125.00 <br /> Perry $15.00 $30.00=$135 <br /> Cummings 18 at 4 $1,080 1.5 hrs x 4 x $1.1260.00 <br /> $15.00 $30.00=$180 <br /> Hazelnut 12 at 3 $540 1 hr x 3 x $ 630.00 <br /> $15.00 $30.00 =$90 <br /> ::: ::: <br /> ................................... ........:...................::::::::. <br /> ::::::::::.:: ::: ::::::::::::::::.::.::.::.::.::. ::.::.: ::::::.::. <br /> TC?'TAL <br /> CT '. . :.:. <br /> T L �L:..I�. . 3 15.00 <br /> IlMetro-inet.uslardenhillslPR&PWIParks Memos lCouncil Memos 1051710 Park Maintenance Management <br /> Plan.do <br />
The URL can be used to link to this page
Your browser does not support the video tag.