My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-15-10 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Packets (2010 to Present)
>
2010-2019
>
2010
>
06-15-10 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2024 12:32:51 AM
Creation date
6/15/2010 9:05:30 AM
Metadata
Fields
Template:
General
Document
6-15-10 PTRC Packet
General - Type
6-15-10 PTRC Packet
Date
6/15/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan 2010 thru 2014 <br /> Cityof Arden Hills, omn sota <br /> Project# 09-Park-007 <br /> Project Name Safe Routes to School-Andersen Connections <br /> Type Improvement Priority n/a <br /> Useful Life Contact Park&Recreation Mgr <br /> Category Park Capital Improvements Department Parks Department <br /> Description Total Project Cost $524,484 <br /> Construction of a 8 foot bituminous trail on the south side of County Road E2,between Old Snelling Avenue and New Brighton Road. <br /> Approximate length is 3,150 linear feet_ <br /> Pave an informal foot path(10 foot bitumious)connecting Venus Avenue to County Road E2_ Approximate length 793 linear feet_ <br /> Add two speed monitor devices to the existing speed limit signs. <br /> Extend existin concrete sidewalk that leads from school entrance to meet new trail. Approximate length is 55 linear feet. <br /> Justification <br /> The Safe Routes to School Grant was awarded to the Ctiy in the amount of$175,000 in April,2008. Wetland impacts caused the project to have <br /> additional cost and the City was successful in obtaining an ARRA grant to cover the costs for this project and the Perry Park project_ T'he project <br /> - is now referred to as the Elmer L.Andersen Memorial Trail Connection Project Staff anticipates construction in spring 2010. Detailed Project <br /> Costs: <br /> Pathway Construction: $179,921 <br /> Retaining Walls: $66,675 <br /> Driveway Gates: $20,000 <br /> Drainage: $95,305 <br /> Crosswalks: $ 1,800 <br /> y, Crosswalk Signal: $151000 <br /> z <br /> Hydrant Relocation: $50,175 <br /> Non-infrastructure: $ 11000 <br /> Engineering: $724)908 <br /> F <br /> Permits: $21,700 <br /> Prior- Expenditures 2010 2011 2012 2013 2014 Total <br /> 94,608 Construction/Maintenance 429,876 429,876 <br /> Total Total 4293876 429,876 <br /> f <br /> Prior Funding Sources 2010 2011 2012 20 13 2014 Total <br /> } <br /> 94,608 Grant Revenue 413,076 413,076 <br /> Total Ramsey Co Donation 16,800 16,800 <br /> 43, Total 429,876 4297876 <br /> Produced Using the Plan-It Capital Planning Software 3 Wednesday, 04,2fl09 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.