Laserfiche WebLink
installed at the southwest corner of Lexington Avenue and County Road E. The second sign <br /> would have been installed at the southeast corner of Highway 96 and County Road E. The City <br /> Council reviewed the EDC's recommendation at their April 12, 2010, meeting, but the gateway <br /> sign proposal was not approved. At the end of the meeting, the Council requested that this item <br /> be brought to a worksession to discuss the status of the project and design options. Since this <br /> project is included in the Capital Improvement Plan (CIP), it has been added to this worksession <br /> for discussion. <br /> Gateway Sign Design Concepts <br /> To help facilitate the discussion, a number of the sign designs that have been looked at over the <br /> years are included in Attachment B-1 to B-5. <br /> • Attachment B-1 (two pages) — the gateway sign design for the Arden Plaza <br /> redevelopment. The total estimated cost in 2009 was $24,050 with the City paying <br /> $10,400 for the sign face and Arden Plaza paying $13,650 for the sign base. <br /> • Attachment B-2 — the design recommended by the EDC in April 2010. The quoted cost <br /> was $5,250 per sign. <br /> • Attachment B-3 — Mr. Hames prepared this design in 2005. The design used the <br /> remaining kasota stone from the City Hall construction and included lighting. He <br /> recalled the price being in the neighborhood of$20,000. <br /> • Attachment B-4 — A design based on a concept prepared by Mr. Hames. No cost <br /> information was available. <br /> • Attachment B-5 — A variation of the Arden Plaza gateway sign that does not include the <br /> stone base. As noted on the design,the estimated cost was $12,360. <br /> During a recent conversation with Mr. Hames, he indicated that any sign that includes stone is <br /> going to be in the $20,000 range at a minimum. <br /> Capital Improvement Plan <br /> The 2010 capital improvement plan (CIP) included $10,000 for the construction of one or more <br /> gateway signs in each year through 2013, which is funded by the EDA General Fund. The EDA <br /> General Fund is primarily funded through a transfer from the General Fund. For discussion <br /> purposes, $10,000 for one or more gateway signs remains in years 2011, 2012, and 2013 of the <br /> CIP. <br /> Capital Improvement Plan <br /> A. Potential Gateway Sign Locations <br /> B. Gateway Sign Designs <br /> 1. Arden Plaza Gateway Sign Design <br /> 2. EDC prepared design(April 2010) <br /> 3. Previous Gateway Sign Concept—2005 <br /> City of Arden Hills <br /> I(Metro-inetl ardenhills IAdmin I CouncillAgendas&Packet Information 1201016-21-10 Worksession(Packet Information 1062110-CC Memo- <br /> Gateway Sign Selection(2).doc <br /> Page 2 of 2 <br />