My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7A, Resolution 2010-038 - Awarding Bid for the CP Rail Bridge Trail Crossing Project
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
07-12-10-R
>
7A, Resolution 2010-038 - Awarding Bid for the CP Rail Bridge Trail Crossing Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 10:10:17 AM
Creation date
7/12/2010 3:34:59 PM
Metadata
Fields
Template:
General
Document
CP Rail Bridge Trail Crossing Project
General - Type
Awarding Bid
Date
7/12/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM NO. 2 <br />AGREEMENT FOR PROFESSIONAL SERVICES <br />FEASIBILITY REPORT FOR TRAIL/CP RAIL BRIDGE IMPROVEMENTS <br />CITY OF ARDEN HILLS, MINNESOTA <br />`This Addendum shall become a part of the original Agreement for Professional Services, dated September 15, <br />2008. This addendum is in regards to construction services in support of the trail underpass across the CP Ra.il. <br />I. Scope of Work <br />For the purposes of this Addendum, Basic Services to be provided by the CONSULTANT include: <br />B olton & Menk will provide periodic construction observation and administration and construction staking <br />services for the traiUCP Rail underpass improvements. Services will include attendance at the pre- <br />construction meeting and construction-related meetings as necessary, service as a lia.ison between the City <br />and the contractor, review of shop drawings and submittals, review of the completed work to determine if <br />the project is in general conformance with the plans and specifications, review of materials testing, <br />maintenance of construction documentation, preparation of pay estimates, and communication with <br />affected property owners, as necessary, to address their construction-related concerns and issues. Services <br />shall be provided over the construction contract time frame of sixty calendar days. <br />II. Compensation for Services <br />Services will be provided on an hourly basis at the following rates and estimated hours: <br />Principal Engineer: 16 hours @ $127/hour = $2,032 <br />Project Engineer/ Observer: 320 hours @$85 = $27,200 <br />Survey Crew Chief: 10 hours @$100/hour = $1,000 <br />Principal Structural Engineer: 6 hours @$140 = $840 <br />Structural Engineer: 64 hours C$140 = $8,960 <br />Total Estimated Fee: <br />$40,032 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.