My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2E, Engineering Workspace
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
07-19-10-WS
>
2E, Engineering Workspace
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 12:08:42 AM
Creation date
7/19/2010 8:58:21 AM
Metadata
Fields
Template:
General
Document
Engineering Workspace
General - Type
Engineering Workspace
Date
7/19/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EN HILLS <br /> � <br /> MEMORANDUM <br /> DATE: July 19, 2010 Item 2.E <br /> TO: Honorable Mayor and City Council Members <br /> FROM: Patrick Klaers, City Administrator <br /> SUBJECT: Engineering workspace <br /> Backiround <br /> Arden Hills has recently requested the City of Roseville to provide additional engineering <br /> services in order to assist the City in doing more capital projects. This request was <br /> acceptable to Roseville and this request required an amendment(done administratively) <br /> to our joint powers agreement. Roseville will be interviewing candidates for this new <br /> position on July 16 and 19, 2010. <br /> Discussion <br /> Per the agreement with Roseville, the City is responsible for providing the workspace and <br /> the necessary technology and other office related items at Arden Hills City Hall. In this <br /> regard, the City needs to decide where this person should be located and what type of <br /> work space should be provided. <br /> There are a few options that the City can consider to address this situation. They include: <br /> 1. ordering and installing another cubical upstairs where 2 cubes currently exist(as <br /> well as an open table work space for one of our interns); <br /> 2. pursuing one of the previously discussed plans for the construction of about 4 <br /> offices upstairs and then consider moving the Public Works department to this <br /> location(see attached sketches from 2007-08); <br /> 3. moving the 2 interns that work in the cubical next to the Deputy Clerk's office to <br /> some open table work space upstairs and then have the new Engineer work out of <br /> this existing cube; or <br /> 4. any other option the Council wants to suggest. <br /> Factors to consider in picking the best work space option for the City include operational <br /> efficiencies; the long term engineering plans of the City; how we would reuse a cube if <br /> this option was selected and, at a later date, offices were constructed upstairs; and the <br /> cost of various options. <br />
The URL can be used to link to this page
Your browser does not support the video tag.