My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-08-10-WS
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2010
>
09-08-10-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2024 12:13:53 AM
Creation date
9/8/2010 11:15:27 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: August 6, 2010 <br /> To: Meagan Beekman <br /> From: Pamela Belz <br /> RE: PHS Library Concept <br /> Presbyterian Homes and Services of Arden Hills is pleased to begin work with the <br /> City of Arden Hills and the Ramsey County Library on concepts for redevelopment of <br /> our 23 acre campus on Lake Johanna. <br /> Project Vision <br /> Replacement of the Lakeview building that is functionally obsolete. The <br /> Lakeview building constructed more than 30 years ago was originally intended for <br /> Independent Living Apartments. However this purpose has shifted overtime as we saw <br /> greater need for Assisted Living units and combined with the unit sizes no longer <br /> sufficient to meet the market demands of Independent Living. Currently, Lakeview falls <br /> short of meeting needs of our residents as it has small units, insufficient common areas <br /> and long corridors that present difficulties for residents and aging mechanical and <br /> electrical systems and utilities. <br /> The future Campus vision will provide more and larger Independent Living - <br /> Apartments to meet the demand of this area. It will also provide a dedicated Memory <br /> Care Unit in Assisted Living which will be built in our neighborhood style as well as <br /> reconfigured Assisted Living Units that are better suited for delivery of care needs, <br /> comfort of residents and create a sense of community. The vision for the new project is <br /> that it matches the overall density/number of units presently on campus but aligns them <br /> with current and projected needs. Types of units current and anticipated are as follows: <br /> Currently Anticipated <br /> Care Center 208 208 <br /> Assisted 136 48 <br /> AL Memory 33 36 <br /> Independent 19 68 <br /> IL Brownstone 0 36 <br /> Total 396 396 <br /> Triangle Property West of Johanna is proposed as a 14 apartment Brownstone. <br /> This parcel could help frame the entrance to Arden Hills as well. <br />
The URL can be used to link to this page
Your browser does not support the video tag.