My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-08-10-WS
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2010
>
09-08-10-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2024 12:13:53 AM
Creation date
9/8/2010 11:15:27 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In preparation for submission to the City, we have assembled a team of: <br /> • Steve Nicholson, Forester with S&S Tree Specialist to update the tree <br /> inventory and evaluate species and health, We will be reviewing with <br /> City forestry staff upon completion <br /> • Pope Architects as project architects for site and building designs. <br /> • Braun Intertec to complete new geotechnical soil borings and update a <br /> Phase I report for the site. <br /> • Clark Engineering to address civil site design and engineering. - <br /> • Sunde Land Surveying for updating survey information and platting. <br /> • First American Title for updated titlework. <br /> • KFI, Inc to evaluate possible geothermal opportunities. <br /> We are beginning the extensive work of preparing a PUD submission package <br /> which we anticipate delivering to the City staff at the end of August. <br /> We are looking forward to working with the City as the project comes together. <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.