My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2D, I694 & 51 - follow-up from public hearing
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
09-20-10-WS
>
2D, I694 & 51 - follow-up from public hearing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 12:51:04 AM
Creation date
9/17/2010 10:31:12 AM
Metadata
Fields
Template:
General
Document
I694&51
General - Type
I694&51
Date
9/20/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Reduced Traffic Congestion: Presently there are up to 5 hours of congestion in the <br />area during weekday peak hours on this segment of freeway. With the proposed <br />project, the traveling public, including Arden Hills residents and employers in Arden <br />Hills can expect: <br />* Regional trips will be reallocated to 1-694 from the local roadway system <br />* An increase in AM peak period speeds between Lexington Ave and TH 10 from <br /><50mph to >60 mph. <br />* An increase -in PM peak period speeds from <20mph to >55 mph. <br />* Reduced variability in travel times and increased reliability of trip times. <br />* A reduction of at least 780 hours of congestion per year. <br />• Project benefits not only affect commuters on the freeway system, it also affects the <br />efficiency of freight movement.in the Twin Cities, efficiency of emergency services, and <br />reliability of transit services. <br />Mn/DOT appreciates the City of Arden Hills commitment to improve safety and reduce <br />congestion on 1-694, TH 96 and the local roadway system within the City of Arden Hills. <br />The improvements shown on the layout will allow for the traffic in this region to experience <br />improved travel time reliability as well as prepare for future expansion of mainline 1-694 to <br />the east. If you have any additional questions or if you need any further explanation of <br />these issues ahead of the council work -session on September 20, 2010, please feel free to <br />contact one. <br />Sincerely, 0000 <br />ark J. Lindeberg <br />North Area Engineer <br />cc: Wayne Norris <br />An Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.