Laserfiche WebLink
As of 01107108 <br /> Ownership of all reports, and physical copies of work products prepared or produced in <br /> performance of this Contract, excluding those in electronic form, shall be retained by The City <br /> upon completion or termination of the project and final payment to the Contractor_ <br /> #.5. Weighing of loads <br /> Contractor will keep accurate records consisting of an approved weight slip with the datel <br /> time, collection route, driver's name, vehicle number, tare weight, gross weight and net <br /> weight for each loaded vehicle. Collection vehicles will be weighed after completion of a <br /> route or at the end of the day,whichever occurs first- A copy of each weight ticket shall be <br /> kept on file and made available for inspection upon request by the City_ <br /> 16. Monthly and annual reports <br /> The Contractor will submit to the City monthly reports and annual reports. At a minimum, the <br /> Contractor shalt include the following information: <br /> a Cross amounts of materials collected, by recyclable material (in tons)_ <br /> • Net amounts of materials marketed, by recyclable material (in tons). <br /> 0 Amounts of IL process residuals"disposed (in tons)_ <br /> Recycling service lee (based upon contracted price per household)_ <br /> • Revenge share credits back to the City (if any)_ <br /> Monthly reports shall be due to the City by the 15'h day of each .month_ Annual reports shall <br /> be due by January 31_ The Contractor will be encouraged to include in its annual report <br /> recommendations for continuous improvement in the City's recycling program (e-g-, public <br /> education, multi-family recycling, etc_)_ <br /> 17. ownership of recyclables <br /> Ownership of the recyclables shall remain with the person placing them for collection until <br /> Contractor's personnel physically touches them for collection, at which time the ownership of <br /> the recyclables shall transfer to Contractor. <br /> 18s scavenging prohibited <br /> All recyclable materials placed for collection shall be owned by and are the responsibility of <br /> the occupants of residential properties until the Contractor handles them_ Upon collection of <br /> the designated recyclable materials by the Contractor, the recyclable materials become the <br /> property and responsibility of the Contractor_ <br /> It is unlawful for any person other than the City's recycling Contractor or owner's independent <br /> hauler to collect, remove, or dispose of designated recyclables after the materials have been <br /> placed or deposited for collection in the recycling containers_ The owner, owner's <br /> employees, owner's independent hauler's employees, or City's recycling Contracto(s <br /> employees may not collect or"scavenge"through recycling in any manner that interferes with <br /> the contracted recycling services_ <br /> 10 <br />