My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2C, Recycling Services Contract
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
09-20-10-WS
>
2C, Recycling Services Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2024 12:22:44 AM
Creation date
9/17/2010 10:34:21 AM
Metadata
Fields
Template:
General
Document
Recycling Services Contract
General - Type
Recycling Services Contract
Date
9/20/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As of 01/07/08 <br /> the composition, including number of samples, dates weighed, and City route(s) used for <br /> sampling. The Contractor shall provide the City with a copy of each such analysis. <br /> 24,, Estimating process residuals <br /> The Contractor shall provide the City a written description of the means to estimate process <br /> residuals derived from the City's recyclables_ This written description shall be reviewed and <br /> approved in writing by the City_ This written description shall be updated by the Contractor <br /> immediately after any significant changes to the processing facilities used by the Contractor. <br /> The Contractor shall record the weight and generator for all materials entering the processing <br /> facility on a daily, monthly and annual basis. These records shall be made available to the <br /> City upon request_ <br /> The Contractor shall report total weight of material disposed as shipped out to a mixed <br /> municipal solid waste facility compared to the total material shipped out each month form its - <br /> processing facility_ <br /> 25., Lack of adequate market demand <br /> In the event that the market for a particular recyclable ceases to exist, or becomes <br /> economically depressed that it becomes economically unfeasible to continue collection, <br /> processing and marketing of that particular recyclable, the City and the Contractor will both <br /> agree in writing that it is no longer appropriate to collect such item before collection ceases_ <br /> The Contractor shall give the City as much notice as possible about the indications of such <br /> market condition changes_ The Contractor may then initiate the formal process by sending a <br /> letter to the City notifying the City that the recyclable item should be discontinued from <br /> collection_ Upon receipt of the Contractor's notice, the City shall have 30 days to review and <br /> negotiate a contract amendment relating to disposal of such a recyclable commodity that <br /> does not have adequate market demand. <br /> After this 30 day period, the City shall pay the costs of all disposal of any item collected that <br /> is deemed not recyclable by Contractor and the City due to lack of adequate market demand <br /> until the City has approved that collection be discontinued for those materials. After the City <br /> agrees to discontinue collection of those materials, the Contractor is responsible for the costs <br /> of all disposal of any item collected that is deemed not recyclable by Contractor and the City <br /> due to lack of adequate market demand. The City and Contractor shall specify a date in this <br /> written contract amendment to cease collection of the recyclable item in question_ The <br /> Contractor shall at all times be under a duty to minimize recyclables ending up in landfill or <br /> disposal at other facilities receiving mixed municipal solid waste. If disposal of any recyclable <br /> commodity becomes necessary, upon receiving written permission from the City, the <br /> Contractor shall dispose of the recyclable materials at a facility specified in writing by the City <br /> or an alternative agreed upon by the City and the Contractor_ <br /> 26. Vehicle requirements <br /> Each collection vehicle shall be equipped with the following: <br /> • The Contractor's vehicles shall be marked with the name and telephone number of <br /> the Contractor prominently displayed on both sides of the truck_ The fettering must <br /> be at least 3 inches in height_ <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.