Laserfiche WebLink
s _ <br /> a <br /> • <br /> Average market price during that month aid b <br /> >3 Y <br /> Contractor's designated customer. <br /> H. Each plastic. PET, HDP --natural HDPE-colored <br /> shall be- <br /> . <br /> • Market price paid by Contractor's designated customer- - <br /> 6.2.2 Processing fees <br /> The processing fee for all paper grades shall be 60-QO per ton, <br /> which includes materials A, 8, C, and D in section 6.2.1. <br /> The processing fee for all Aluminum, Glass steel and Pl <br /> astic <br /> materials shall be $90-00 per ton, which includes materials E. F, G, <br /> and H in section 6.2.1. <br /> There shall be no processing fee for residual materials- <br /> 6.2.3 Revenue and processing fee formula <br /> Revenue will be calculated b multiplyingthe tons of individual y <br /> material collected by the agreed upon material price as described in <br /> section 6.2.1. Total Revenue will be calculated by adding all of the <br /> revenue generated for each of the materials collected and <br /> processed. contractor shalt guarantee a minimum price on all <br /> materials of$0.00 per ton_ If a particular material price is negatives <br /> a price of$0.00 per ton shall be used._ Processing fees as <br /> described in Section 6.2-2, shall apply to materials with prices of <br /> less than $0.00 per ton. <br /> Processing fees will be calculated b multiplyingthe to <br /> . . . � tons of <br /> individual material collected by the agreed upon processing fee for <br /> each material type as described in section 6.2.2. Total Processing <br /> Fees will be calculated by addict all of the processing fees <br /> 9 P g <br /> generated for each of the materials collected and processed. <br /> Revenue share received b the City will be calculated <br /> y � by <br /> subtracting the Total Processing Fees from the Total Revenues. <br /> If <br /> the remainder is positiv- <br /> e, that number represents the revenue that <br /> shalt be split between the City and the contractor 50f50. if the <br /> remainder is negative, that number represents the amount of <br /> _ p <br /> processing fees not covered by that morth's revenue and will be <br /> paid in full by the city. <br /> 6.2.4 Price reporting <br /> The contractor shall provide copies of the OBM Market index wi <br /> th <br /> th <br /> each monthly statement for materials A. 8, and C in section 6.2. <br /> 3 <br />