Laserfiche WebLink
• Request for elevation drawings which are being provided now that we <br /> have architectural style direction. <br /> • Request for shadowing study and perspective views are in process <br /> • Request to limit length trucks need to back to docks resulted in redesign of <br /> lower level and moving loading dock to location that could shorten <br /> backing <br /> • Evaluation of lighting plan in loading dock area to ensure less light bleeds <br /> off site <br /> • Ensuring adequate parking has been planned for to eliminate need for <br /> parking on Lake Johanna Blvd. Evaluation study completed and over 100 <br /> more parking stalls have been added. <br /> • Re evaluating parking and drive isles at Brownstones especially the one on - <br /> west side of Lake Johanna and replacing some area with more green space <br /> • Adding low retaining wall on the north side of Brownstone parking - <br /> creating a planter box so headlights will be blocked by planter box and <br /> landscaping can provide screening. <br /> Process this fall: <br /> September workshops with PC and CC <br /> September Library Board Meeting <br /> September 29th neighborhood meeting and open en house at PHS <br /> PC Meeting October 6 <br /> p th p <br /> CC Meeting to follow <br /> We look forward to working with the City, our community and the greater Arden Hills <br /> community to make this redevelopment and reinvestment a reality. <br /> Attachments to Land Use Application& Narrative include: <br /> Legal Description with Addresses and PID's <br /> Preliminary Landscape Management Plan <br /> Forester's Report <br /> Calculation of required plantings <br /> Engineering Calculation Sheets <br /> Sets of Engineering, Site and Building Plans in sizes requested <br />