Laserfiche WebLink
�; <br />�,� •u <br />£�k <br />. ::3i� s=.:� <br />;�J��3.: z <br />� �� <br />. ,T <br />1.lEE�i#���3t�l4i�i3!������si�� 1`"!i��`���!� •>;';,>i'3�.�f`�# <br />DATE; September 9, 2010 <br />T�: City of Arden Hills <br />FR4M; Matt Morreim, P.E, <br />SUBJECT: Lexington Avenue Pedestrian improvements Bid Resuits <br />The bid overview for the Lexington Avenue Pedestrian Improvements is as follows: <br />1. North Ualley Inc ...........................................................................„,.,,,,,,.,.,$94,011,62 <br />2, Barber Construction Inc ..........................................................�109,620.00 <br />3, Concrete Idea, Inc .............................................................................�118,225.45 <br />4. Minger Construction ......................................................................$119,643,55 <br />5. DMJ Asphalt ................................................................................................�129,816.01 <br />A detailed bid tab is attached, <br />14800 28� Ave, N., Ste 140 <br />Piymo uth, M i n n esota 55447 <br />(763� 476. 6010 ma i n <br />(763) 476, 8532 fax <br />www.mfra.com <br />The low bidder, North Valley, made a clerical error on the mobilization item that if strictly enforced would reduce <br />their bid price by $2,249.50. The intent of the bid was clear and it was apparent that a clerical mistake was <br />made, Their clerical error does not change the bidde�s low bid status. <br />MFRA recommends that the City Council awards the contract to North Ualley in the amount of $90,011.62, North <br />Ualley is a well qualified contractor and we have worked with them on many successful projects. <br />If you have any questions or need any additional clarification, please contact me, <br />