Laserfiche WebLink
11A Tr:14 IOC <br />SHEET <br />EET.C.40 <br />4.2 I. SHEET C4 1: <br />I.. <br />PROPOSED ii.1111)1NG <br />BASEMENT FFE 8900 <br />1ST FLOOR FTE ,902;0 <br />2NO FLOOR. FTE.414.Cr, <br />I, <br />1 <br />1 <br />30 IS 0 <br />SCALE: 1 30' <br />LEGEND: (PROPOSED SYSTEM) <br />*S4 C.ATCHEIASIN <br />0• 1.4ANHOLE <br />A. FLARED END SECTION <br />SPOT ELEVATION <br />CD CONTOUR aeomoN <br />PROPOSED STORM SEVIER <br />sk, <br />KEYED NOTE <br />4 .1 RIPRAP <br />ROCK CONSTRUCTION ENTRANCE <br />KEYED NOTES: <br />KEYED NOTES DENOTED BY ON PLANS <br />SILT ,aICE. SEE DETA, <br />ROCK c-c.s-TRuc ENT.-4E. SEE DETAIL <br />ID CB ',Er pRom SEE DETAIL <br />STATE LAW: 48 HOURS BEFORE EKCAVAING OR OEMOLCSHING BUILDINGS, CA. (651) <br />'4.54.-0002 FOR FIELD LOCATION OF UNDERGROUND UTILITY uNes. SERME Low. <br />unuir OWNED USES ea NOT PRIVATE LINES.) <br />THE Low.. tooERsRouNo tam. ARE sHawm W AN APPROXWATE WAY ONLY AND <br />.NAVE NOT BEE/4 INDEPENDENTLY VERIFIED. THE EXACT LOCA1TON OF AU_ UTILITIES MUST 9E <br />TiElElthp.), BEFORE colAcmcmc IVOR, <br />POPE <br />POPE AssoaAns <br />ass ENERGY PARK DR1 <br />ST. PAIR, M ssias-s <br />PH. (6s0 <br />FAX (650 64. <br />PRESBYTERIAN HOME <br />AND SERVICES <br />ARDEN HLLS <br />REDEVELOPMENT <br />%Mims <br />CITY SUBMITTAL <br />STGMATI5RE: <br />butt, <br />0.0 <br />:t$ Paid P. <br />Arden His, MN <br />ENGINEERING CORPORA TIC <br />621 Lilac Drive North <br />Minneapolis, MN 55422 <br />(763) 545-9196 <br />Fax (763) 525-1666 <br />www.clork—eng.com <br />GRADING, DRAINAGE <br />EROSION CONTROL <br />PLAN <br />WATERSHED SUBMITTAL 9/17/1 <br />PLID SUBMITTAL_ MAROC-AM. 9/24/1 <br />I HER. r.1RTIFY 1144T THES PLAN, 54,,C.:710s. <br />OR REPORT WAS PR.1.11 SY ME OR LINDER try <br />MEC SWElivr.Si. 4/40 TWAT 44.I Wel <br />ITROFESS10 NGITFAR UNOCR <br />aE An O 574 <br />TYRO OR R1 14,44E: RN. 131..4, <br />.7E V2, .M <br />41.7 <br />TU1 <br />RIM <br />W2Q <br />C1COIS <br />C4.0 <br />