My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-19-10 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Packets (2010 to Present)
>
2010-2019
>
2010
>
10-19-10 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2010 10:40:51 AM
Creation date
10/15/2010 10:38:45 AM
Metadata
Fields
Template:
General
Document
10-19-10 PTRC Packet
General - Type
10-19-10 PTRC Packet
Category
10-19-10 PTRC Packet
Date
10/19/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan <br />City of Arden Hills, Minnesota <br />. # <br />10- Park -005 <br />Project Name Valentine Park Improvements <br />Description <br />The City completed a drainage study of this park. The City Council has asked for the PTRC to review and recommend potential park <br />improvements as well as seek neighborhood input_ The elevation of Lake Valentine has improved due to removal of the beaver dam and <br />cleaning of the culverts. The City needs to monitor the lake levels. The park is draining better but has not seen a significant rain to determine <br />how well it is draining. The PTRC has recommended a second opinion on the Valentine Park park drainage analysis_ The park is in need of <br />improvements; to what extent will be up to the Council and the neighborhood. <br />Justification <br />This park is in poor shape. The parking lot is in need of replacement and there is no shelter, as it was moved due to the flooding. The play <br />p y <br />structure was installed in 1990. On the City's 20 year replacement schedule, it should be replaced in 2010, however, the playground is in fine <br />shape and therefore could make it until the park is improved. The park drainage needs to be addressed before amenities are replaced_ <br />Prior <br />I 70,000 <br />Total <br />Prior <br />I 70,000 <br />Total <br />Type Improvement <br />Useful Life <br />Category Park Capital Improvements <br />Expenditures <br />Construction /Maintenance 260,000 <br />Funding Sources <br />Total 260,000 <br />Surface Water Mgmt Utility Fu 260,000 <br />Total 260,000 <br />Department Parks Department <br />Contact Park & Recreation Mgr <br />Priority n/a <br />Total Project Cost: $330,000 <br />2011 thru 2015 <br />2011 2012 2013 2014 2015 Total <br />260,000 <br />260,000 <br />2011 2012 2013 2014 2015 Total <br />260,000 <br />260,000 <br />Budget Impact/Other <br />The park improvement will help with maintenance because the park is usually so wet, it is difficult to mow and when done, one large area is not <br />able to be mowed at all. Savings estimated to be $200 per year for parts and labor_ <br />Budget Items <br />Maintenance of Parks and Trail <br />Produced Using the Plan -It Capital Planning Software <br />2011 2012 2013 2014 2015 Total <br />-200 -200 -200 -200 <br />Total -200 -200 -200 -200 <br />24 <br />-800 <br />-800 <br />Friday, June 18. 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.