My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-27-10-R
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2010-2019
>
2010
>
09-27-10-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2010 9:55:34 AM
Creation date
10/28/2010 9:54:38 AM
Metadata
Fields
Template:
General
Document
Regular City Council Minutes
General - Type
Regular City Council Minutes
Category
Regular City Council Minutes
Date
9/27/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
View images
View plain text
ARDEN HILLS CITY COUNCIL September 27, 2010 4 <br />4. Consent Calendar (continued) <br />A. Claims and Payroll <br />B. Resolution 2010 -049: Resolution Appointing Election Judges and Absentee Ballot <br />Board for the General Election <br />MOTION: Councilmember Grant moved and Mayor Harpstead seconded a motion to <br />approve the Consent Calendar as presented and to authorize execution of all <br />necessary documents contained therein. The motion carried unanimously (5- <br />5. PULLED CONSENT ITEMS <br />None. <br />6. PUBLIC HEARINGS <br />None. <br />7. NEW BUSINESS <br />A. Planning Case 10 -010 for a Conditional Use Permit at 3900 Bethel Drive <br />Based on the Findings of Fact and the Submitted Plans as Amended by the Six <br />Conditions in the September 27, 2010, Report to the City Council <br />City Planner Beekman stated the applicant has requested a Conditional Use Permit (CUP) for <br />AT&T to install two antenna assembly canisters, which would house three cellular antennas each. <br />The Campus is located in the B -1 District. The antennas would be at a height of approximately 56 <br />feet from the ground, and extend approximately nine feet above the roof of the building. The <br />canisters would be located on top of an expanded HVAC screening wall and would be designed to <br />blend in with the existing mechanical equipment on the roof. The applicants are also proposing to <br />construct a ten foot by sixteen foot equipment shed that would be ten feet in height, and would be <br />attached to the new building. The siding of the equipment shed would match the brick face of the <br />existing building to which it would be attached. Since the Planning Commission meeting, a water <br />main has been found in the proposed site of the equipment shed. AT &T is working with Bethel <br />University on a slight modification to the location of the shed. <br />Councilmember Holden asked if the proposed HVAC unit was the tallest structure on the <br />building. She also asked if other providers would want to put antennas at this location. <br />City Planner Beekman stated that she was not sure if the proposed unit was the tallest structure <br />on the building. She also stated she was not able to speak to the intentions of other providers and <br />their interest in putting antennas at this particular location. The proposal is for AT &T only. She <br />stated she has not been in contact with any other providers interested in this location. <br />Councilmember Grant asked if both of the proposed canisters on the building were needed. He <br />also asked if other providers' equipment would be able to fit in the proposed shed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).