My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-052 (Rescinded via 2011-024)
ArdenHills
>
Administration
>
City Council
>
Resolutions
>
2010-2019
>
2010
>
2010-052 (Rescinded via 2011-024)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2010 8:18:55 AM
Creation date
10/29/2010 8:18:29 AM
Metadata
Fields
Template:
General
Document
Resolution
General - Type
Resolution
Category
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. The City requests that MnDOT show on the approved layout a 6 foot wide <br />concrete sidewalk on the west side of Hamline Avenue from Floral Drive to <br />County Road F and on the south side of County Road F towards Lexington <br />Avenue to the existing and/or planned sidewalk. <br />11. The City request that MnDOT include as part of the proposed bridge structure <br />crossing I -694 a non motorized /pedestrian facility that will provide for <br />movements from the west side of Hamline Avenue to the west side of TH51. <br />12. The City requests that MnDOT clearly state that the existing area on TH51 <br />available for non- motorized/pedestrian movements will not be lessened in the <br />future with the proposed improvements. <br />13. The City requests that MnDOT commit to including the design standards laid out <br />in the Architectural and Aesthetic Design Guidelines for the I -694 Corridor from <br />the Mississippi River Crossing in Fridley to the I -694 Interchange in Oakdale, <br />July 2002. <br />14. The City requests that MnDOT affirm the intentions for 2015 reconstruction of <br />the County Road E bridge over TH51 and consider the possibility of moving this <br />construction up in time to match the balance of the regional construction (for bid <br />economies of scale and logistics). The City may be able to advance the funds <br />necessary for this construction given a firm repayment in 2015. <br />
The URL can be used to link to this page
Your browser does not support the video tag.