The submittal includes a site plan analyzing the zoning requirements and <br />including the areas for which PHS is seeking flexibility. <br />Phasing of Project Construction <br />Anticipated schedule <br />May 2011 Start of site work and construction of 2/3 of main building <br />August 2012 move Lakeview residents then demo existing building <br />October 2012- March 2013 construction of Phase 1B and connection <br />May 2013 landscaping /hard scaping for Phase 1 A B main portion <br />September 2013 Site work and Brownstone on County Rd D <br />February 2014 Residents relocate from Sutton Place <br />March 2014 Removal of Sutton Place and construction of Brownstone #2 <br />Spring 2015 completion of final landscaping /hard scaping improvements <br />Process to date: <br />14 months <br />3 months <br />6 months <br />4 months <br />8 months <br />1 month <br />6 months <br />3 months <br />PHS has presented a concept of the Library and overall plan to the City Council in <br />a workshop format in August. PHS has presented a proposal for plans to include the <br />Library on campus to the Library Board in August. Ultimately the Library decided not to <br />relocated within our campus. <br />PHS has conducted a series of neighborhood meetings and held an open house to <br />gather public comment to the proposed redevelopment. In general, we have heard many <br />supportive comments and all conversations have been open and productive. These were <br />fruitful discussions that generated many good ideas and points many of which were <br />incorporated into the plans that were submitted September 7, 2010. <br />Initial plan revisions included: <br />relocation of the entry off Shorewood Road further from the existing <br />driveway and with better visibility coming from the neighborhood. <br />revised grading plan to preserve more of the screening by first neighbor <br />and along part of Shorewood (later revised to move to Cty Rd D) <br />addition of a sidewalk along Shorewood for students to walk to bus stop; <br />addition of bus shelter for students. (later removed by request) <br />idea to stake tree locations of screening landscaping with each neighbor <br />with abutting back yard to preserve views and access they like and screen <br />views to which they are most sensitive. <br />Direction provided to architect on style and elements by each group; goal <br />to make style fit lake estate setting and to incorporate some units into roof <br />line to bring down height but preference voiced not to have flat roof. <br />Request for elevation drawings which many have been provided <br />Request for shadowing study and perspective views also provided <br />