My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4C, Approve Parks Maintenance Management Plan
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
11-15-10-S
>
4C, Approve Parks Maintenance Management Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 10:21:39 AM
Creation date
11/22/2010 12:39:58 PM
Metadata
Fields
Template:
General
Document
Parks Maintenance Management Plan
General - Type
Parks Maintenance Management Plan
Category
Parks Maintenance Management Plan
Date
11/15/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. GARBAGE & LITTER. Garbage and litter is picked up three times a week, subject to <br />variability based on weather and scheduled uses. Containers to be washed every two weeks. <br />5. RECYCLING. One or two recycling bins (depending on park) will be placed at the picnic <br />shelter (if park has one) and at ball fields. They will be picked up at the same time as the <br />garbage and litter. <br />6. PRUNING. Usually done at least once per season unless species planted dictates more frequent <br />attention. Sculptured hedges or high growth species may dictate more frequent attention. <br />7. LIGHTING. Replacement or repair of fixtures when observed or reported as not working. <br />8. SIGNS. Signs that are fully exposed and south facing could be painted every 8 years or so. <br />Borders can be recoated every 3 years or so. Posts can be recoated every 2-3 years. <br />9. SURFACES. Should be cleaned, repaired, repainted, or replaced when appearance has <br />noticeably deteriorated. Graffiti should be washed off or painted over by the next working day, if <br />possible. <br />10. REPAIRS. Should be done whenever safety, function, or bad appearance is in question. <br />1 l. INSPECTIONS. Inspections should be done weekly by staff with proper forms �lled out. <br />12. FLORAL PLANTINGS. Flowers and shrubs weeded a minimum of once a month or more as <br />needed. The desired outcome is weed-free. Fertilize as needed. <br />13. RESTROOMS. If portable restrooms are provided, regular servicing to be done usually by an <br />outside contractor. However, if any servicing is noted, it should become a priority of staff. <br />14. PA17:K AMENITIES. Should be maintained for safety, function, and high quality <br />appearance as per established design. <br />15. PLAY STRUCTURES. Playground areas are monitored daily and inspected monthly. High <br />priority to fix or remove hazards due to high use by small children. The playground mulch will <br />be replaced regularly and weeded at least once per month. Please see the equipment and mulch <br />replacement schedule on page 26. <br />16. POND/SEDIMENT BASINS OUTFALL INSPECTION CLEANING. SWPPP (Stormwater <br />Pollution Prevention Program) guidelines to determine necessary cleaning and maintenance. <br />LEVEL III <br />This level of maintenance is performed at mini parks or park green spaces that have typically low <br />activity (few park amenities). Maintenance at this level is at a moderately low level usually <br />associated with low visitation or remote parks. Parks categorized in this level: <br />JOHANNA MARSH, LINDEY' S <br />1. TURF CARE. Mowing and trimming to take place every seven to ten working days. Normally <br />not aerated unless turf quality indicates a need. Topdressing, seeding, and sodding done only <br />when maj or bare spots appear. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.