My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4F, Lexington Avenue Sidewalk & Trail Project
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
11-15-10-S
>
4F, Lexington Avenue Sidewalk & Trail Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 10:23:32 AM
Creation date
11/22/2010 12:40:38 PM
Metadata
Fields
Template:
General
Document
Lexington Avenue Sidewalk & Trail Projec
General - Type
Lexington Avenue Sidewalk & Trail Projec
Category
Lexington Avenue Sidewalk & Trail Projec
Date
11/15/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER NO.1 <br />City of Arden Hills, MN <br />Lexington Avenue Pedestrian Improvements <br />MFRA #18691 <br />Change Order No. 1 includes the substitution of sod for hydroseeding and the increased <br />quantities for additional excavation of topsoil. <br />TRAIL A (BITUMINOUS) <br />Item 1 <br />DELETE: <br />12. Sod 1,389 SY $7.48/SY ($10,389.72) <br />ADD: <br />12. Hydroseeding 900 SY $3.95/SY $3,555.00 <br />Total Item 1 DEDUCT ($6,834.72) <br />Item 2 <br />INCREASE Quantity By: <br />4. Subgrade Excavation 33 CY $15.00/CY $495.00 <br />Total Item 2 ADD $495.00 <br />TRAIL B (CONCRETE) <br />Item 3 <br />DELETE: <br />29. Sod <br />ADD: <br />29. Hydroseeding <br />30. Recycled Aggregate Base <br />31. Bituminous Patch <br />Total Item 3 <br />Item 4 <br />INCREASE Quantity By: <br />21. Subgrade Excavation <br />Total Item 4 <br />TOTAL THIS CHANGE ORDER <br />ORIGINAL CONTRACT AMOUNT <br />CHANGE ORDER NO. 1 <br />762 SY $7.48/SY ($5,699.76) <br />d00 SY <br />117 TN <br />336 SF <br />$3.95/SY <br />$18.00/SY <br />$5.00/SF <br />ADD <br />$2,370.00 <br />$2,106.00 <br />$1,680.00 <br />$456.24 <br />91 CY <br />$15.00/CY <br />ADD <br />DEDUCT <br />$1,365.00 <br />$1,365.00 <br />($4,518.48) <br />$90,011.62 <br />($4,518.48) <br />REVISED C4NTRACT AMOUNT $85,493.14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.