Laserfiche WebLink
Arden Hills Campus <br />Traffic per Entry analysis <br />Lake Johanna Main Entrance <br />November 2010 projections <br />ots <br />I trips per c <br />Lower lot staff care center and AL <br />ist and 2nd shifts 40 spots per 160 <br />3rd shift 15 spots per 30 <br />Lower lot visitor resident transport <br />16 spots x filled twice per day 32 <br />Garage 54 residents apts generate 43 <br />40 staff spots x 2 shifts 160 <br />Brownstone 14 units x 2.02 per day 28 <br />Main Lot west portion <br />visitor resident transport <br />30 spots 2.5 per day 74 <br />staff parking AL IL <br />1st 2nd shifts at 16 spots per shift 64 <br />add 20% for PT staff trips additional 26 per shift 52 <br />Total trips per day at Lake Johanna Main Entry <br />pots <br />ndeen <br />County Road D South Entry <br />Brownstone 22 x 2.02 trips Per day 44 <br />Main Lot West 33 west section 17 of middle section <br />st 2nd shift 50 200 <br />20% add for PT staff trips additional 24 per shift 4 <br />Total trips per day at County Road D Entry <br />Total trips at build out full occupancy <br />11/24/2010CADocuments and Settings\meagan. beekman\Local Settings\Temporary Internet <br />Files\Content.Outlook\1 G43TE78\AH Traffic per entry analysis.xlsAH Traffic per entry analysis.xls <br />Trips <br />160 <br />30 <br />32 <br />43 <br />160 <br />28 <br />74 <br />64 <br />52 <br />643 <br />1030 <br />