Loading...
HomeMy WebLinkAbout2A, Old Snelling Scoping Document EN HILLS Request for Council Review2A = Prepared By: Terry Maurer,Public Works Director Worksession Date: December 20,2010 Old Snelling Scoping Document Discussion Topic: Discuss the potential improvements to Old Snelling from CR E to TH 51 including street reconstruction(urban or -_ rural),detached trail and/or bridge replacement. Supportiniz Documents: 1. Memorandum dated December 20, 2010 from Terry Maurer and Matt Woodruff EVEN HILLS MEMORANDUM DATE: December 20, 2010 TO: Honorable Mayor and City Council Members Patrick Klaers, City Administrator FROM: Terry Maurer, Public Works Director�� Matt Woodruff, Civil Engineer SUBJECT: Old Snelling Avenue Improvements--Preliminary Scoping Document Background/Discussion The Preliminary Scoping Document for the Old Snelling Avenue Improvement project was given to the City Council the night of the December 6, 2010 meeting. For the December 20, 2010 work session, City staff will give a brief presentation of the project and will be available to discuss the scoping document with the City Council. Please bring your copy of the scoping document to the work session to facilitate a discussion. As presented in the scoping document, there are a number of roadway improvement alternatives to consider for Old Snelling Avenue as well as additional features that can be included within the project, such as installing a new bridge structure and/or installing a new detached pedestrian trail. Given the different improvement alternatives and additional features that could be installed, the - estimate range of project costs is: + $ 2,545,000 Urban reconstruction with curb and gutter, parking, remove and replace the existing bridge, and install a pedestrian trail. • $ 457,900 Bituminous reclamation of existing roadway without replacing the bridge or installing a pedestrian trail. City Council Meeting P:1AdminlCounciPAgendas&Packet Information12010112-20-10 WorksessionTacket Information112-20-1 OMemo_SnellingAve.doc Page I of 1