Loading...
HomeMy WebLinkAbout5E, Adopt Resolution 2011-005 Approving Plans and Specification� �'i�]EN HILLS Request for Council Action Prepared By: Matt Woodruff, Civil Engineer Council Meeting Date: ]anuary 31, 2011 Adopt Resolu�ian 2011-005: Approviug Plans and Specifications a�d Ordering Advertisement for Bid for the 2011 Pavement Management Program Budgeted Amount: Actual Amount: Funding Source: $1,747,000 $1,703,7U0 PIR, Enterprise Fu�ds, Special (engineering and construction) (engineering and canstruct'ron) Assessments Recommendation: • Motion to adopt Resolution 20ll -005: Approving plans and specifications and ordering advertisement for bid for the 2011 �avemeii# Management Program. Sunport'rn� Documents: • Meinorandum dated January 31, 201 I from Matt Woodruff. • Resolution 2011-005. � EN HILLS MEMORANDUM DATE: January 31, 2011 TO: Honorable Mayor and Ciiy Cour�cilz�ea�x�bers Patrick Klaers, City Administra#or FROM: Matt Woodruff, Civil Engineer SUSJECT: 2011 Pavement Management Program — Appraving Plans and Speci�ca�ions and Ordering Advertisemeut for Bid Back�ra�nd On December 13, 2010, a pubiic improvement hearing was held far the 2011 PMP project. Following the hearing, the City Cauncil ardered the irnprovement and preparation of plans and specifications of the proposed project. The next step in the process is far the City Council to approve plans and specificaiions and authorize the adv�rtisement far bids. Discussion �tate statute requires a City Council resolution approving plans and specifications and ordering the advertisement for bids for alI public improvements to be assessed. Since a por�ion of �lie costs for the proposed project will be assessed to benefiting properties, the adoptian of this resolution is required. Street Improvements Due to the existing condiiions of the roadways, the pxoposed irnprovements include a bituminous reclamation to all sireets. AlI of the roadways wzll be repaved to match tl�e existing roadway widths. Existing curb and gutter will rennain in place, with the exception of isolated areas that need repaiars to replace damaged or sunken curb. The following roadways are proposed for improvexz�ent: • Amble Road, from Hamlzne Avenue to dead end, • Arden View Court, from Arden View Drive to cul-de-sac, • Arden View Drive, from Arden View Court to 761' east of Royal Hills, • Arden View Drive Ent/Exit, from Hamline Avenue to Arden View Court, City Council Meeting 11Metro-ir�etlardenhi11s1AdminlCouncillAgendas & Packet Infarmation1201111-31-11 Regularll'acket Informationll-31- 11Memo 2011PMP_ApprovePlansSpecs-OrderAdForBid.doc Page 1 of 4 � Colleen Cotu t, from Colleen Avenue to cul-de-sac, • Dellwood Street, from. Nursery Hill Court to Amble Road, • Janet Court, from Lake Valeniine Road to cul-de-sac, • Nursery Hi11 Court, �rom Nursery Hill Lane to cul-de-sac, • Nursery Hill Lane, �'rom Ha�ara.line Avenue to Nursery Hill Court, • Wyncrest Court, from Hamline Avenue to cul-de-sac, • Wyncrest Lane, from Wyncrest Court to Wynridge Drive, • Wynridge Drive, from Wyncresi Court to cul-de-sac. Utili Im rovements Storm Drainag� and Storm Water Quality Improvements: The storrn drainage system inr�provements are relatively minor and include maintenance on selected storm sewer manholes anc� catch basins. Residents adjacent to Karth Lake have asked if improvemen#s to the existing storm drainage system could be made in conjunction with tl�e overall project that will help improve the quality of the water entering Karth Lake. City staff has determined that approximately 2200 cubic feet of voiunrae is needed to meet Rice Creek Watershed District's infiltration requirements. Staff is working to finalize �ocaiions withrn City easements and right of way, ar in front o£ interested residents' properties. �uff'icient quantities have been included in the bid documents. A grit chamber is also included in th� plans to be placed on Nursery Hill Lane at the end of the storm sewer system prior to discharging ta Karth Lake. Water Systenn Improvements: The wa�er system improvements include re�ovzng and replacing selected gate vaives and hydrants that are in poor condition. Since the Arden View neighborhood has experienced a number of watermain breaks, the existing watermain syste�n within the City's roadways are proposed to be removed and replaced. Water system improvements in the Arden View neighbarhood will include a.fl associated valves and hydrants near the roadway areas. Sanitary Sewer Svstem Ianprovements: The sarzitary sewer systern improvements are relatively rninor and include rnaintenance on selected manholes. However, within tY�e Janet Court cul-de-sac, City staff is pxoposing that a segment of tlie existing sanitary sewer pipe be removed and replaced ta eliminate a sagging pipe. Financial Implications As presented in the feasibiliiy repart, the estimated total project cost for the improvements is $1,703,'70Q, including contingencies, engineering and overhead �ees as outlined in the Assessment Policy. City Council Meeting 11Metro-inetlardenhi11s1AdminlCouncillAgendas & 1'acket Infarmation120 1 111-3 1-1 1 RegularlPacket Informationll-31- 11Memo_20IIPMP ApprovePlansSpecs-OrderAdFarBid.doc Page 2 of � The City's portion of the projeci costs are currently bu�geted from the PIR and Utility Enterprise Funds (sanitary sewer, surface water management and water main funds). A �raject cost summary is listed in the table beiow. Roadway costs include a 37% overhead; utility costs include 30% overhead. Fu�d Sudgeted Feasibility Report Watermain Enierprise Utility $ 250,OOQ $ 198,800 Sanitary Sewer Enterprise Utility $ 32,500 $ 22,400 Surface Water Management Util'rty $ 67,500 $ 91,600 PIR / Assessments $ 1,397,000 $ 1,390,900 Totai $ 1,747,000 $ 1,703,700 FUNDING SOURCES City: PTR Fund $ 695,450 Ciiy: Entearprise Funds $ 312,800 Assessments $ 695,450 Assess�ents As detailed in the feasibility report, two preliminary assessment rates ha�e been. established, one for single-family residences and one for multi-farnily/townhouse residences. Th.e table below lists the estimated assessment rate for single-family and multi-family residentiai properties. ASSESSMENT RA,TES Property Type Street Cos#s Assessab[e Total Cost per Costs 50% Units Uni� Single-family * $ 9b2,900 $ 481,450 138.0 $ 3,489 Multi-family/townhouse $ 428,000 $ 214,000 306.0 $ 699 Tatals $ 1,390,900 $ 695,450 *�ncludes larger properties that can be further subdivided and tax-exempt equivalent units. City Council Meeting 11Metro-inetlardenhi11s1AdminlCouncillAgendas & Packet Information120 1 111-3 1-1 1 RegularlPacket Tnformationll-31- 11Memo_2011PMP ApprovePlansSpecs-OrderAdPorBid.doc Page 3 of 4 Council Actions Requested Adoption oi Resolution 2011-005: A�provzng the p�ans and specifzcations and ordering the advertisement for bid �or the 2011 Pavement Management Program. City Council Meeting I1Metro-inetlardenhi11s1AdminlCouncillAgendas & Packet Information1201111-3 i-11 RegutarlPacket Informationll-31- 1 I Memo_2011 PMP_ApprovePlans Specs-OrderAdForBid. doc Page 4 of 4 � EN HILLS CITY 4F ARDEN HILLS COUNTY OF RAMSEY STATE OF MINNES4TA RESOLUTION NO. 2011-005 A RESOLUTION APPROVING PLANS AND �PECIFICATIONS AND ORDERING ADVERTISEMENT FOR BIDS FOR THE 2011 PAVEMENT MANAGEMENT PROGRAM WHEREAS, purs�ant to a resolution passed by the City Council on December 13, 2010, the Crty of Roseville Engin�ering Department has prepared p�ans and specif cations for the improvement of the following streets: Amble Road, �ronn Hamline Avenue to dead end, Arden View Court, from Arden View Drive to cul-de-sac, Arc{en View Drive Entrance/Exit, from Ha�n.line Avenue to Arc�en View Drive, Arden View Drive, from Axden View Court to 7C 1' easi o� Royal Hills, Colleen Court, from Colleen Avenue to cul-de-sac, Dellwood Street, from Nursery Hill Cour� to Amble Road, Janet Court, from Lake Valentine Road to cut-de-sac, Nursery Hall Lane, fro� Hamline Avenue to N€�rsery HiII Court, Nursery Hil� Court, from Nuxsery Hill Lane to cui-de-sac, Wyncrest Court, from Hamline Aven�e to cul-de-sac, Wyncrest Lane, from Wyncrest Court to Wynridge Drive, Wynrid�e Drive, from Wyncrest Court to cul-de-sac, and has presented such plans and specificatians to the City Co�ncil for approval; NOW THEREFORE, BE IT RESOLVED SY THE CITY COUNC�L OF ARDEN HILLS, MINNESOTA: 1. Such plans and specifications, a copy of rn�hich is attached hereto, and made a part hereof, are hereby approved. 2. The City Administrator shall prepare and cause to be insert�d in the Bulletin, the official newspaper, and in the Canst�uction Bulletin an advertisement for bids upon the making of such improvement under such approved plans and specifications. The advertisemer�t shall be published as required by law, shall specify the work ta be done, shall state the date and time tha� the bids will be received by the City Adtzi.inistrator and City Engineer at which iime they will be pub�icly opened in the Arden HiIls City Hali by the City Engineer, wili then be tabulated, and wiil subsequently be considered by the CounciL No bids will be considerec� unless sealed and filed with the Administrator and accompanied b}� a cash deposit, cer�ified check or bid bond payable to the City of Arden Hills for ien percent (10%) of the amount of suc� bid. ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS THIS 31st DAY OF JANUARY, 31, 2011. Da�id Grant, Mayor ATTEST: Patrick Klaers, City Adminis#rator