Loading...
HomeMy WebLinkAbout6A, 2011 PMP - Public Hearing and Resolution 2010-080� � � I EN HILLS Request for Council Action Prepared By: Matt Woodz-uff, Civil Er�gineer Council Meeting Date: December 13, 2010 Z011 Pavement Management Pragram �- Public Hearing and Resolution 2U10-O80: Ordering Public I�nprovement and Preparation of Plans and Specifcations �'or the 20�1. Pavement Manage�naent Prograin Budgeted Amount: Actual Amount: Funding 5ource; $1,747,OQ0 (engineering and $1,703,700 (engineering and PIR, Enterprise Funds, Special construction) canstruction) Assessmen�s Recommendation: • Hold Public Hearing for the 2011 Paveznent Management Prograzn. • Adopt Resalutian 24I4-Q80: Ordering Public �mprover�ent a�d Preparation of Plans and Specifications for the 2011 Pavement Management Program. Minnesota Statutes state that the adoption of this resolution requires a four-fifths vote. Su�porting Documents: • Memorandum dated December 13, 2010 fram Matt Woadruff • Comrrzen�s received by City staff from property awners. + Resolution 20I0-080. � �^i�EN HILLS MEMORANDUM DATE: December 13, 2010 TO: Honorable Mayor and City Council Members Patrick Klaers, City Administratar FROM: Matt Woodruff, Civil Engineer�� SUBJECT: 201. �. Pavement Management Program — Pnblic Hearing and Ordering Plans and Speciircatians Back ro�nd On November 15, 2010 the City Council received ihe feasibility repprt for the 2011 PMP Improvement Praject and ordered tlie public hearing for December 13, 2Q10. Priar to opening the hearing, City staff will present general inforrnation regarding construction, standards, and assessments that apply for this project. Following Minnesata Statutes, Chapter 429, z�otice of the public hearing rnust be posted twice prior to the meeting; this was done in the Bulletin on Novemb�r 24 and December 1, 20I0. A notice was also sent to each property proposed to ba assessed as a part of this praj ect. Once the hearing is closed, the next step in the process is for the City Cauncil to order the improvements and preparation af plans and specifications. Discussion The �ollowing is a brief surnmary of propased improve�ents; for more detail, please referenc� the feasibility report. Street Improvements: Due io the existing conditions af the roadways, the proposed improv�rnents include a bit�uninous reclatnation ta all streets. All of the roadways will be repaved to match the existing roadway widths. Exisiing curb and gutter will remain in place, with the exception of isolated areas that need repairs to replace damaged or sunken curb. The following roadways are proposed for improvement: Amble Road, from Hamline Avenue to dead end, Arden View Court, from Arden View Drive to cul-de-sac, Arden Vie� Drive, from Arden View Court to 761' east of Royal Hills, City Council Meeting 11Metro-inet.uslardenhillslPR&PW1EngineeringlCouncil Actaons12016112-13-lOMemo_2011PMP_PH_OrderPlansSpecs.doc Page l of 4 + Arden View Drive EntlExii, from Hamline Avenue to Arden View Court, • Colleen Court, from Colleen Avenne io cul-de-sac, • Dellwood Street, froxn Nursery Hill Court to Ambie Road, • Janet Court, fram La�ce Valentine Road to cul-de-sac, • Niirsery Hill Caurt, from Nursery Hill Lane to cul-de-sac, • Nursery Hil1 Lane, from Hamline Avenue to Nursery Hill Court, • Wyncrest Court, from Hamline Avenue to cul-de-sac, • Wyncrest Lane, from Wyncrest Co�art to Wynridge Drive, • Wynridge Drive, from Wyncrest Court to cul-de-sac. Storm Draina�e and Stor�n Water Qualitv Improvements: The storm drainage system improvements are relatively minor and include maintenance on selected stonn sewer manholes and catch basins. At the September 23, 2010 neighborhood meeting, residents adjacent to Karth Lake asked if improvements to the existing storm drainage system could be made in conjunction with the overall project that wiIl help improve the quali#y of the water entering Karth Lake. City stafi discussed the possibility of installing grit chambers and iniiltration facilities (rain gardens) that r�vould im.prove water quality. In between 1255 and 1261 Nursery Hill Lane, the City's storm sewer syste� discharges into Karth Lake. During final design, the City wiIl evaluate alternatives to the existing storm sewer system that would result in an improvement to the water quality in this area. Water System Improvements: The water system improvements include removing and replacing selected gate valves and hydrants that are in poar condition. Since the Arden View neighborhood has experienced a number of watermain breaks, the existing watermain system within ihe City's roadways are proposed to be removed and replaced. Water system improvements in the Arden View neighborhood will include all associated valves and hydrants near the roadway areas. Sanitar Sewer S stern Im roverrients: The sanitary sewer system improvements are relativeIy minor and incl�de rnaintenance on selected manholes. However, wiihin the 7anet Court cul-de-sac, City staff is proposing that a segment of the existing sanitary sewer pipe be removed and repIaced to eliminate a sagging pipe. Financial Imnlications The estimaied total project cost far the improvements is $1,703,740 which includes aIl overhead costs. Consistent with the City's Assessment Policy, 37% overhead costs for the street improvements has been included, which was used to calculate preliminary assessment rates. The overhead is bralcen down as follows: City Administration 2.5°/o Design Engineering 10.0% Construction Engineering 10.0% City Council Meeting 11Metro-inet.uslardenhil�slPR&PWIEngineeringlCouncil Actions120I0112-13-lOMemo_2011PMP_PH OrderPlansSpecs.doc Page 2 of 4 Legal Fiscal Interest D�ring Canstruction Assessment Roll Preparation Contin�encies TOTAL 2.0% 3.Q% 4.5% �.�% 4.0% 37.0% The City's portion of the project costs are currently budgeted fram the PIR and Utility Enterprise Funds (sanitary sewer, surface water management and watermain funds}. The proposed project funding summary is listed in the table below. As mentioned, roadway costs include a 37% overhead; while utility costs include 30% overhead. FUNDING SOURCES City: PIR Fuald $ 695,450 City: Enterprise k'unds $ 312,800 Assessm�nts $ 695,450 Assessments As detailed in the feasibility report, two preliminary assessment rates have been established, one for single-�aanily residences and one for multi-family/towrihouse residences. The table below lists the estimated assessment rate for sing�e-family and multi-family residen.tial properties. ASSESSMENT RATES Property Type Street Costs Assessab[� Single-farn�ily * $ 962,900 $ 4$1,450 Multi-family/iawnhouse $ 428,000 $ 214,000 Totals $ 1,390,900 $ 695,450 * Tncludes larger properties that can be further subdivided and tax-exempt equivalent units. Total � Cost per 138.0 $ 3,489 306.0 $ 699 City Council Meeting 11Metro-inet.uslardenhillslPR&PW1EngineeringlCouncil_Actions1201Q112-I3-lOMemo_20] 1PMP_PH QrderPla�sSpecs.doc Page 3 of 4 Resident Comments/Concerns City staff has attached writt�n comments frorn one property owner r�garding the proposed project. Any additional comments received after the council packet is issued and prior to the public hearing will be provided ai tile public hearing. Council Actions Rec�uested Hoid the Public Improvement Hearing for the 2011 Pavement Managezxrent Program. Adoption of Resolution 2010-0$0: Ordering Public Improvement and Preparation of Plans and Specif cations for the 2010 Pavement Managernent Prograzn. Minnesota Statutes state that the adoption of this resolution requires a%ur-fifths vote. Ciry Council Meeting 11Metro-inet,uslardenhi11s1I'R&PW1EngineeringlCouncil Actions12010112-13-lOMemo_20f 1PMP PH_OrderPlansSpecs.doc Page 4 of 4 Pau1 L. Malone 4374 Ardez� Vie�cxr Court • Arden Hills, MN 55112 Home {651} 636-9737 • Inters�et: plmalone@comcast.net December 2, 2010 Kristine Giga, P.E. City of Arden Hilis 1245 West Highway 96 Arden Hills, MN 55112 Re: 2011 Pave�nent Management P�rograrn RehabiliEation of Arden Vie�v Caurt Kristine Giga: Thank you for sending the notice regarding the 20I 1 Pavement Management Program, which includes the rehabilitation af ArcEen View Court. The feasibi�ity study alsa lists the potential of reducing the dia�neter of the center island at the end of Arden View Court. Finally, the notice provided an estimate of the praposed assessrnent for the project; in my case, approximately $700. I do not plan to attend the public hearing on Dece�nber 13; having sat through a number oi tne�tn in the past, but would like to provide my thoughts on the project. �t is my hope that you wi11 provide this Ietter to the council as a part of their information packet for t�e hearing. The project has my fnll support and � am willi�g to pay the proposed assessment. Some of �ny neighbors may not agree with this position, but it seemed important to let you know that those who may be in opposition do not reflect the views of everyone in the comrnunity. It is m�y hope that the reduction of the diameter of the circ1e at the end of the caurt remains a part of the plan. Finally, and aIthough I'm sure the ciiy is aware of this situation, I would like to ask that the contractor chosen for the project be cognizant af the fact that Arden View Court is a dead- end that provides the sole access to the 166 homes in our community. Consequently, it wilI be important that they work to maintain reasonable access during the constructian process. Sincerel y, Pawt. !�. Ma.Lo-�� Paul L. Malone � EN HILLS CITY OF ARDEN HILLS COUNTY OF RAMSEY STATE QF MINNESOTA RESOLUTIQN NO. 2010-080 A RESOLUTION ORDERING IMPROVEMENT AND PREPARATYON OF PLANS AND SPECIFICATIONS FOR THE 2011 PAVEMENT MANAGEMENT PROGRAM WHEREAS, a resolution of the City Council adopted November 15, 2010, fixed a date for a Council hearing on the proposed improvement of the following streets: Amble Road, from Hamline Avenue to dead end, Arden View Court, from Arden View Drive to cul-de-sac, Arden View Drive Entrance/Exit, fram Hamline Avenue to Arden View Drive, Arden View Drive, from Arden View Court to 761' east of Royal Hills, ColIeen Court, from Colleen Avenue to cul-de-sac, Dellwood Street, from Nursery Hill Court to Amble Road, Janet Caurt, from Lake Valentine Raad to cul-de-sac, Nursery Hill Lane, from Hamline Avenue to Nursery Hill Co�rt, Nursery Hill Court, from Nursery Hill Lane to cul�de-sac, Wyncrest Court, from Hannline Avenue to cul-de-sac, Wyncrest Lane, from Wyncrest Court to Wynridge Drive, Wynridge Drive, from Wy�crest Court to cul-de-sac, and WHEREAS, fen days' mailed notice and two weeks' pnblished natice of the hearing was given, and the hearing was heid on December 13, 2010, at which alI persons desiring to be heard were given an opportuniiy to be heard thereon, NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF ARDEN HYLLS, MINNESOTA: i. SucI� irnprovement is necessary, cost-effectiv�, and feasible as detailed in �he feasibility report. 2. Such improvement is hereby ordered as praposed in the Council rasolution adopted December 13, 2010. 3. The City of Roseville Engineering Department is hereby designated as the engineer for this improvement. The engineer shall prepare plans and specificaiions for the malcing a� such imparovement. ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HTLLS THIS 13th DAY OF DECEMBER, 2010. Stanley D. Haxpstead, Mayor ATTEST: Patrick Klaers, City Administrator