HomeMy WebLinkAbout1F, Walgreens Concept Review and Transportation Discussion 1F City Council Worksession January 20, 2009 Agenda Title: Walgreen’s Concept Review and Transportation Discussion James Lehnhoff Prepared By: MEMORANDUM DATE: January 20, 2009 TO: Mayor and City Council FROM: James Lehnhoff, Community Development Director SUBJECT: Planning Case #: 09-001 Walgreen’s – Arden Plaza PUD Concept Review ATTACHMENTS: A – Concept Design Packet from Arden Plaza, LLC B – B2 Design Standards (Section 1325.05 Subd 8 of the Zoning Code) C – Traffic Study – Guiding Plan for the B2 District Requested Action The concept review process is an opportunity for the City Council to provide comments, questions, concerns, and suggestions regarding the Walgreen’s – Arden Plaza concept PUD. A concept review is considered advisory and is nonbinding to the City and applicant (Section 1320.14 Subd 4 of the Zoning Code). No formal action can be taken at a work session. A formal application will be subject to the full review process, including a public hearing with the Planning Commission and City Council review. Walgreen’s – Arden Plaza Concept Proposal The applicants have submitted a packet of information that includes a description of the potential project. The packet includes the following information: The 2007 site layout and building elevation that was withdrawn; A new 2009 site layout and building elevation; and, Cross sections of the 2009 layout as viewed from Lexington Avenue and from County Road E. The revised 2009 concept includes a 14,400 square foot Walgreen’s store and 5,000 square feet of retail/restaurant space. The existing “pod” office building has about 46,000 square feet of City of Arden Hills City Council Work Session for January 20, 2009 \\Metro-inet.us\ardenhills\Planning\Planning Cases\2009\09-002 - Walgreen - Arden Plaza Concept Review\012009 - CC report - Walgreen's - Arden Plaza Concept Review.doc Page 1 of 3 space, which is proposed to be removed. If this project moves forward as shown in the concept, there would be a net reduction of approximately 26,600 square feet. While it is certainly possible that there could be future redevelopment on the rest of the site, the current concept plan does not include any other redevelopment or new development. If a formal application is submitted, it would include landscaping, lighting, sign, architecture, utility, and other related plans. City Review Process and Regulations To help provide support for the City’s review process, we have retained Gary Hay and Thomas Dobbs of Hay Dobbs architecture and planning. Mr. Dobbs provided some input on the Guiding Plan for the B2 District as part of the City’s contract with MFRA. Mr. Hay will be in attendance at the work session. B2 Design Standards (Section 1325.05 Subd 8) On November 24, 2008, the City adopted design standards for the B2 District. This is a new set of regulations that were not in place during the previous review process. The adopted design standards do set a high bar for new development and redevelopment in the B2 District. If a formal application is submitted, these regulations are the foundation for the City’s review. Since all new development and redevelopment are subject to the Planned Unit Development (PUD) process, there is room for a negotiation. It is not uncommon for a developer to ask for leniency in some areas and the City to ask for a higher level of design in other areas. It is important for a City to prioritize what is important in terms of design and function and determine how much flexibility should be granted. Conformance and flexibility with the design standards is subject to City Council determination. To help facilitate this discussion, a copy of the B2 design standards is included in Attachment B. The other design standards in Section 1320 and 1320 of the Zoning Code also apply, which includes additional regulations for parking, landscaping, and screening. Guiding Plan for the B2 District Although the Guiding Plan for the B2 District is not formally adopted into the Zoning Code, the Zoning Code does reference that Plan and it is part of the overall review process. During the review process, applications will be evaluated based on their conformance with and advancement of the goals in the Guiding Plan. Copies of the Guiding Plan were distributed to the City Council in December and can also be downloaded online at www.ci.arden- hills.mn.us/b2district. City of Arden Hills City Council Work Session for January 20, 2009 \\Metro-inet.us\ardenhills\Planning\Planning Cases\2009\09-002 - Walgreen - Arden Plaza Concept Review\012009 - CC report - Walgreen's - Arden Plaza Concept Review.doc Page 2 of 3 Transportation Discussion A transportation consultant, Mike Spack of Spack Consulting, will be attending the work session to facilitate a discussion on the various traffic studies and transportation questions along County Road E and Lexington Avenue. Mr. Spack prepared the traffic impact study for the Guiding Plan for the B2 District as part of the City’s contract with MFRA, which is included in Attachment B for your reference. We welcome any questions that can be submitted prior to the meeting so that we can have as much information and answers as possible at the work session. Please feel free to submit any questions to James prior to the meeting. Preliminary Review Timeline If the applicants decide to move forward, they have indicated that they would like to submit a completed application in time for the March 4, 2009, Planning Commission meeting. The Planning Commission would hold a public hearing where they could recommend approval, recommend denial, or table the application to another meeting. If the Planning Commission makes a recommendation at their March 4 meeting, it would likely come to the City Council on March 30, 2009. A concept review does not automatically start the review process for a formal application. The timeline is subject to change. Attachments A – Concept Design Packet from Arden Plaza, LLC B – B2 Design Standards (Section 1325.05 Subd 8 of the Zoning Code) C – Traffic Study – Guiding Plan for the B2 District In order to conserve paper, not all copies of this report include the attachments. The attachments can be viewed at City Hall or downloaded at www.ci.arden-hills.mn.us. City of Arden Hills City Council Work Session for January 20, 2009 \\Ahdocs1\ah\AHdata\Planning\Planning Cases\2009\09-002 - Walgreen - Arden Plaza Concept Review\012009 - CC report - Walgreen's - Arden Plaza Concept Review.doc Page 3 of 3 A Attachment Concept Design Packet from Arden Plaza, LLC January 20, 2009 HOPPING COUNTY ROAD E wALGREENS c CENTER SIGN MONUMENT SIGN ' F 1 CD 10 — I PROPOSED BUILDING'A' RETAIL A 14,490 S.F. EXISTING BUILDING I I 1 ,2 I I i I 1 28 I 1 I ,2 I � w 22 I I p i '6 L z — o o z PROPOSED BUILDING'S" W RETAIL ' 1 1 I 29 16,230 S.F. ' 1 I I � so I ❑ \ I � � IF1 33 I I ' I i 24 I I 1 I � I 1 1 1 1 I pp I EXISTING I RETAIL BUILDING 52,580 S.F. --I PROPOSED BUILDING"C' I OFFICE/RETAIL I -I 14,300 S.F. 'I � I L - - - - - - - - - - - — — — — — — — - - - - - � Option I - 2007 Plan Scale 1"=80' Total Parking Count : 407 NORTH PROJECT O C7 D7HHUS O O Arden Plaza, Arden Hills MN 0 � 0 properties Ii/f9/o� � COMMISSION ul6zzb-o7olz Welligton MANAGEMENT, INC. COUNTY ROAD E WALGREENS HOPPING MONUMENT SIGN CENTER SIGN CITY t�ONUME T SIGN TM GATNERMs I _ WACE I I II 15 1 11 I _ IRETAIL WALGREEN5 I EXISTING I 5,000 14,400 4 t _ RETAIL/ SF ' I BANK tt l t , I 5500 5F I - I _ I ; 1 `` ( ) ► DRIVE T4R1 I ;liiiilllliiil 11 . QI I 23 Z i I 16 I 0 ' II I I 1 I Z 5 + t Uj x _ I � I I I 4t I I - I4t , I . I I p7U 28 ' 1 ?/� SHOPPING I I CENTER SIGN ' I / I It ' - I EXISTING RETAIL • • � I � I � �8 1 I 52,000 5F I I_ �-�-��- ( POND I. I I I ! I , I ' 1 _ I I ' L - -- _ 6 - -. - -- _ -. .. _. .... Option 2 - Anticipated 2009 Plan Scale I"=80' Total Parking Count : 485 NORTH on o 0[R � PROJECT O O properties Arden Plaza Arden Hills MN 0 01-14-09 1 COMMISSION 1116226-07012 Well igon MANAGEMENT, INC. Z Z nc 0 Q � O y ` O -Now-. , A lit {1� H�lat < O We fV O CL O Z a � M �I N L � N N rz Z N o rz V) C � o u w O L- a Q W ', ► >✓ V' LL Q� Z on a o ~ v uH X \` Z Q O s .... �■ 1 � Q } �r O a O C� ..ter U t ■ N O Q O Z a� N O N N Z N o L l � % Z 0 a) z 00 W� N m \ L Y a \ no W a O 0 w _l� g w U c - x a� Y M m N . O .O W W � � O 73 O O T J U � 7 e 3 Ln W O � r O N N m i W LA LA r �LLJ o r " o � w o L \ ao \ bD 3 \ r . 2 rz 5= n r B Attachment B2 Design Standards (Section 1325.05 Subd 8 of the Zoning Code) January 20, 2009 City of Arden Hills Chapter 13 Zoning Code Subd. 8 Additional Design Standards for New Development, Redevelopment, and Modifications to Existing Sites in the B2 and B3 Districts. (Revised December 17, 2008) Unless preempted by the standards in this section, all other zoning provisions shall apply: A.Purpose and Intent. The purpose of these additional design standards is to promote a high level of architectural, landscaping, and site design in the business districts of Arden Hills. The City seeks to create a unified, harmonious, and high-quality environment to foster a distinct, positive, and successful image for the City. The criteria by which new development, redevelopment, and site modifications in the Districts shall be judged are as follows: 1.Consistency with provisions of the comprehensive plan and other guiding plans as amended from time to time; provisions of the zoning ordinance and subdivision ordinance; and all other applicable regulations. 2.Use of appropriate materials, lighting, textures, colors, and architectural and landscape forms to create a unified, high-quality design concept for each site that is compatible with adjacent and neighboring structures and functions. 3.Creation of unified site designs, each with a sense of internal order, that provide desirable environments for site users and visitors and the community as a whole and that consider all site elements. 4.Provision of safe and adequate access from public streets to sites giving ample consideration to the location and number of access points, the safety and convenience of merging and turning movements, and traffic management and mitigation. 5.Provision of on-site vehicular, bicycling, and pedestrian circulation by way of interior drives, parking areas, pathways, and walkways adequate to handle anticipated needs and to safety buffer pedestrians and cyclists from motor vehicles. Ample consideration shall be given to the width of interior drives, internal traffic movement and flow, separation of pedestrian, cycling, automobile; and delivery traffic, and the safe, convenient, and practical arrangement of parking spaces. B.Application. The standards in this Section should apply only to the building or site elements being developed or altered (i.e. a proposal for changes to a building would be required to meet only those standards that pertain to buildings while changes to a parking area would be required to meet the standards for parking areas but not for buildings). The design standards shall be applied proportionately to the degree of change Section 1325 – General Regulations Adopted: November 13, 2006 Page 20 of 53 City of Arden Hills Chapter 13 Zoning Code proposed. Upon recommendation from the Planning Commission, the City Council may waive specific design standards based on the scale of the project. The City Council shall make the final determination on the compatibility and consistency with the design standards. C.Architectural Style and Building Character. Evaluation of the appearance of a project shall be based on the quality of its design and on its relationship to its surroundings. Site characteristics to be evaluated for this purpose include, but are not limited to, building and landscaping materials, colors, textures, shapes, massing, building components, height, roof-line, and setback. Monotony of design, both within projects and between projects and its surrounding, is prohibited. Variation in detail, form, and arrangement shall provide visual interest. Architectural style should not be restricted. D.Building Materials. Buildings shall be constructed of materials that are enduring, timeless, and well-detailed. 1.At least seventy-five percent (75%) of the exterior building materials shall be of brick, stone, decorative concrete plank, transparent glass or any combination thereof. 2.Trim and other accent or decorative features may be metal, wood, or EIFS. Other high-quality materials that increase the variety and appeal of buildings may be considered as accents. Metals shall have a matte finish and neutral or earth tone colors. Metals that are used on exterior walls shall have visible corner moldings and trim. 3.Undesirable materials shall include simulated brick or stone, vinyl or aluminum siding, sheet metal, corrugated metal, concrete blocks, materials that have no pattern or relief when applied to large walls, brightly colored metal roofing or canopies, and pre-cast tilt-up walls. Extensive use of mirrored or tinted glass on the first floor and materials that represent corporate colors or trademarks that are not in conformance with approved building materials are also undesirable. E.Building Design. The arrangement, geometry, massing, materials and colors shall work to create a high quality development that is responsive to existing buildings, site features, and site design on adjoining sites in the district. 1.At least fifty percent (50%) of the largest building on each site shall be constructed at the front setback line. 2.Façade treatment shall be carried around all sides. Architectural elements such as, but not limited to, windows, shutters, awnings, doors, masonry exterior veneers, cornice detailing, window casings, Section 1325 – General Regulations Adopted: November 13, 2006 Page 21 of 53 City of Arden Hills Chapter 13 Zoning Code and other architectural details should demonstrate consistency on all sides of the structure that are reasonably visible to the general public. Plain flat walls shall not be permitted when viewable from the public right-of-way or public areas. 3.To avoid long unbroken expanses and to increase visual interest from the street, buildings of more than 40 feet in width shall be divided into smaller increments (between 20 and 40 feet) through articulation of the facades to convey the impression of individually- constructed small storefronts or, in the case of housing, housing units. This can be achieved through the combination of the following techniques: a.The use of windows and doors; b.Façade modulation—stepping backward or forward or extending a portion of the façade; c.Vertical divisions into storefronts with separate display windows and entrances; d.Recesses and projections such as porches, dormers and bays that create shadows and add visual interest; e.Variation in the rooflines by using multiple roof and ridge lines perpendicular to one another, offsetting single roof lines, stepped roofs; f.Providing a lighting fixture, trellis, tree, or other landscape feature with each interval. 4.Awnings or overhangs shall be provided at entryways to provide shelter from the sun and rain. The awnings shall be opaque so as not to create a glowing effect with lights under the awnings. Awnings shall be constructed of durable, protective, and water repellant material; however, plastic or fiberglass awnings shall not be permitted. 5.Any multi-level building shall distinguish the ground floor level from the upper floors by use of any or a combination of these techniques: an intermediate cornice line, difference in building materials or details, awnings trellis or arcade, special window details, or brick corbels or quoins. A strong base and top for multi-story buildings shall be established; middle layers shall be simpler. Detail shall be an integral part of the architecture rather than a series of applied elements. Section 1325 – General Regulations Adopted: November 13, 2006 Page 22 of 53 City of Arden Hills Chapter 13 Zoning Code 6.Franchise architecture identified with a particular chain shall be discouraged unless it is architecturally integrated into the district and conforms to these design standards. 7.Entrances shall have convenient access to the street frontage and to parking serving the use. For those properties along County Road E, access to the street frontage shall be given priority where feasible. F.Commercial Façade Transparency. 1.Fifty percent (50%) of the first level façade that includes the primary store entrance and/or faces a public street shall be made of transparent windows and doors that are recessed at least one inch rather than being flush with the façade. If the building is a one story design and the first floor elevation exceeds twelve (12) feet, then only the first twelve (12) feet shall be included in calculating the façade area. 2.At least twenty percent (20%) of the remaining sides that are reasonably visible to the public shall be window coverage, half of which may be simulated windows (i.e. spandrel glass). If additional transparent glass is used on the remaining sides, the City may consider a proportional reduction in the transparent window and door requirement on the primary store entrance and/or public street façades: 3. For buildings with a use or function that does not readily allow windows (e.g. cooler or freezer areas, mechanical rooms, security areas, storage areas) the transparent window standards may be reduced at the discretion of the City Council. However, the architectural detailing must be provided by the use of upper level windows, which may include the partial use of simulated windows, or architectural detailing that provides arches, patterning, recesses, and shadowing that provide aesthetic interest. Architectural detailing may include such things as change in materials, change in color and other significant visual relief provided in a manner or at intervals in keeping with the size, mass, and scale of the wall. G.Building Color. Colors shall be harmonious. Building colors shall consist of muted colors with low reflectance. Recommended colors include browns, grays, tans, beiges, and dark or muted green, blues, and reds. Bright or brilliant colors and sharply contrasting colors may be used for only accent purposes occupying a maximum of five percent (5%) of building façades. H.Fences. Fences shall blend into the landscape, be compatible with other materials used on site, and be made of a material that minimizes Section 1325 – General Regulations Adopted: November 13, 2006 Page 23 of 53 City of Arden Hills Chapter 13 Zoning Code corrosion. Finished and treated wood, brick, stone or wrought iron is encouraged. I.Signs. 1.Business signs shall be architecturally compatible with the style, composition, materials, colors and details of the building and should be an integral part of the building. Signs shall be incorporated into the façades of the buildings rather than extending past the roof line and should not project more than twelve (12) inches beyond the plane of the façades. Retail business wall signs shall be located in a position above the front window that is located consistently among stores. 2.All other provisions in Chapter 12, Sign Code, shall apply. J.Site Furnishings and Seating Areas. 1.Site furnishings shall be provided based on the scale of the project. The site furnishings may be spread out on the site or clustered to provide a more formal area. Placing site furnishings near landscaped areas is encouraged. These areas may be shared by multiple tenants on a property or adjacent properties and may include tables, chairs, benches, plantings, and other outdoor amenities such as a plaza. These areas shall be maintained for year round use. Creativity is highly encouraged. These spaces shall be connected to the sidewalk system. 2.Benches and decorative plantings shall be provided near the primary entrance of all buildings on a site. 3.Restaurants shall include a functional outdoor seating area with tables, chairs, plantings, and access to the restaurant. r.No outdoor seating shall be permitted in any portion of the public sidewalks where normal pedestrian traffic flow is obstructed. s.The outdoor seating area shall not be used for exterior storage when the area is not in use. While such area is in operation, all tables and chairs shall be kept in a clean, sanitary condition. t.These areas shall be distinguished with decorative fencing and/or plantings. u.If alcoholic beverages are served, the establishment shall take reasonable steps to insure that alcoholic beverages are consumed only by patrons of the establishment who are of age. All other provisions related to the license to serve alcohol shall apply. Section 1325 – General Regulations Adopted: November 13, 2006 Page 24 of 53 City of Arden Hills Chapter 13 Zoning Code K.Screening. 1.Trash and recycling equipment, materials, and containers shall be fully enclosed and integrated into the architecture of the buildings. 2.All mechanical equipment, whether roof-mounted or ground- mounted should be integrated into the architecture of the building. It shall be completely screened from the ground-level view of adjacent properties and public streets. Wood screening shall not be permitted. 3.Truck docks and delivery areas shall face away from the public street and shall be integrated into the architecture of the building. L.Landscaping. A generous amount of plant material and landscaping shall be used on all new development and redevelopment sites. Office parking areas shall include a generous amount of perimeter and internal landscaping. Parking structures shall be visually softened with plantings. A minimum of one tree shall be placed along the right-of-way every forty (40) feet. The tree shall not interfere with the roadway and shall be on private property. M.Parking. 1.Placing parking between the street right-of-way and a building shall be discouraged. 2.No more than fifty percent (50%) of the parking on a site may be between buildings or in the side yards. 3.Sufficient parking shall be provided to accommodate the reasonable hourly peak on a given site. Shared parking is encouraged to reduce land devoted to parking. Hourly variations among different types of land use may be considered when estimated parking demands. 4.Plantings shall be used to soften and shade parking lots and parking structures. Parking and service areas shall be visually screened from street views with plantings and architectural treatments. 5.Parking lot islands shall be used to distribute large parking fields into separate “outdoor” rooms that have visual relationship to the buildings they serve. Parking lot islands shall be planted with trees or include infiltration basins and plantings. Entry drives shall be defined by trees and shrubs. Section 1325 – General Regulations Adopted: November 13, 2006 Page 25 of 53 City of Arden Hills Chapter 13 Zoning Code 6.A concrete curb shall be provided around the periphery of all parking lots and access roads, except where the City Engineer determines that a curb would impede drainage. 7.Parking adjacent to streets should be screened from views with landscaping, including but not limited to trees, hedges, flowers and other bushes and/or decorative masonry walls. Berms shall be discouraged. 8.Parking structures that are visible from off the site shall display an integration of building materials building form, textures, architectural motif, and building colors with the principal building. No signs other than directional signs shall be permitted on parking ramp facades. N.Traffic Study. A traffic study shall be required for all new developments, redevelopments, and significant modifications to existing sites unless waived by the City Council. O.Lighting. Exterior lighting shall be provided for the safety and convenience of occupants and visitors. 1.A lighting plan shall be submitted that shows location, type of illumination and design. A photometric analysis of site and building shall be submitted for City approval with all new construction or redevelopment projects. 2.Exterior lighting shall be consistent in type, design, scale, and color to create unity in the Districts. High-pressure sodium lighting and other similar types of lighting color may be required by the City to promote a unified lighting color throughout the Districts. Other lighting colors may be considered during the City review process. 3.Exterior lighting for parking lots and buildings shall not be excessive and shall be directed at their intended purposes. 4.Lighting under a gasoline station canopy shall not be directly visible from the street but shall be recessed into the canopy or otherwise shielded. 5.Light washing of buildings and accent lighting may be permitted through the City review process provided that it does not negatively impact residential areas or traffic safety and is complementary to the district as a whole. P.Pedestrian and Bicycle Circulation. Pedestrian and bicycle improvements shall be installed in accordance with the City of Arden Hills Section 1325 – General Regulations Adopted: November 13, 2006 Page 26 of 53 City of Arden Hills Chapter 13 Zoning Code Comprehensive Plan and the local guiding plan and shall be in conformance with the following: 1.Site design shall facilitate pedestrian connections and mobility within and between building, sites, and uses by providing clear visual indicators through door placement, signage, striping, raised pathways, and integrating landscaping components. Other features or materials may be considered that enhance and provide a safe pedestrian experience. 2.A sidewalk shall link the primary entrance of each building on site with the public sidewalk network. In the event a building is subdivided into multiple separated tenant spaces, a sidewalk must link the primary entrance of each separated tenant space with the public sidewalk network. 3.Bike racks shall be required near a public entrance of all buildings. 4.Internal sidewalk systems shall connect with adjacent planned or developed public sidewalks or trails. 5.The grades of all walks, parking spaces, terraces, and other paved areas shall conform to the requirements of the Americans with Disabilities Act. 6.Where there is new building construction or renovation where the renovation value is thirty percent (30%) or more of the pre-renovation value of the structure, a minimum six foot concrete sidewalk adjacent to or in all rights-of-way shall be provided. The location of the sidewalk shall be prescribed by the Public Works Director. The new sidewalks shall connect to sidewalks on adjacent properties if they exist. At the discretion of the City Council, the property owner may, in lieu of constructing the sidewalk, pay the City an amount equal to the cost of constructing the sidewalk to satisfy the obligations of this section. Said payment shall be used by the City to further maintain and construct the pathway system within the City. 7.When there is more than one building on a site, a sidewalk must link the primary building entrances of each building to one another. Q.Drainage/Water Management Plan: A plan must be submitted with each project or lot development in the Districts. The plan must be approved by the Rice Creek Watershed District, other agencies as required, and the engineer assigned by the City. Two or more lots or projects may coordinate their plans for their mutual benefit. Section 1325 – General Regulations Adopted: November 13, 2006 Page 27 of 53 City of Arden Hills Chapter 13 Zoning Code R.Environmental Conservation and Sustainability. The City encourages the use of green materials and environmentally friendly construction and site design such as the use of pervious surfaces, green rooftops, energy efficient materials, LEED standards, and other green building techniques. Section 1325 – General Regulations Adopted: November 13, 2006 Page 28 of 53 C Attachment Traffic Study – Guiding Plan for the B2 District January 20, 2009 PTHE' TRAFFIC STUDY COMPANY w _ �Pr Tra I In -m act Study Guiding Plan for the B2 District Arden Hills, MN I hereby certify that this report was prepared by me or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Date: December 5,2008 TABLE OF CONTENTS 1.Introduction and Summary ........................................................ 1 2.Proposed Development ............................................................. 3 3.Analysis of Existing Conditions ............................................... 6 4.Projected Traffic ....................................................................... 12 5.Traffic and Improvement Analysis .......................................... 21 6.Conclusions and Recommendations ..................................... 25 7.Appendix ................................................................................... 25 LIST OF FIGURES Figure 2.1 – Location Map .................................................................................. 4 Figure 2.2 – Concept Plan .................................................................................. 5 Figure 3.1 – Existing Conditions ....................................................................... 9 Figure 3.2 – Existing P.M. Peak Hour Traffic .................................................. 10 Figure 3.3 – Existing Daily Traffic .................................................................... 11 Figure 4.1 – Trip Distribution ........................................................................... 14 Figure 4.2 – P.M. Peak Hour Volumes Due to Development.......................... 15 Figure 4.3 – Daily Volumes Due to Development ........................................... 16 Figure 4.4 – 2030 No-Build P.M. Peak Hour Volumes .................................... 17 Figure 4.5 – 2030 No-Build Daily Volumes ...................................................... 18 Figure 4.6 – 2030 Build P.M. Peak Hour Volumes .......................................... 19 Figure 4.7 – 2030 Build Daily Volumes ............................................................ 20 Figure 5.1 – Recommended Long Range Improvements .............................. 24 LIST OF TABLES Table 3.1 – Average Annual Daily Traffic Volumes .......................................... 7 Table 3.2 – Existing Level of Service (LOS) ...................................................... 8 Table 4.1 – Development Trip Generation ...................................................... 13 Table 5.1 – 2030 P.M. Peak Hour Level of Service (LOS) ............................... 21 Guiding Plan for the B2 District i Arden Hills, MN Traffic Impact Study December 2008 1. Introduction and Summary a. Purpose of Report and Study Objectives The City of Arden Hills is developing a Guiding Plan for the B2 District. The purpose of this report is to determine if existing transportation infrastructure can accommodate the redevelopment contemplated in the Guiding Plan and to recommend changes to the transportation infrastructure to enhance the redevelopment. The study objectives are: i. Determine how the existing County Road E/Hamline Avenue West Ramp, County Road E/Connelly Avenue, County Road E/Pine Tree Drive, County Road E/Holiday Inn Site Driveway, County Road E/Arden Plaza Driveway, County Road E/Lexington Avenue, and Lexington Avenue/Harriet Avenue intersections currently operate. ii. Determine if the above intersections will operate acceptably after the redevelopment is fully occupied in 2030. iii. Recommend improvements if needed. b. Executive Summary The City of Arden Hills is planning for redevelopment along the County Road E corridor. The redevelopment is planned to occur on three different sites along the corridor: (1) the Pot ‘O Gold bingo hall site will be replaced with 15,000 square feet of offices, (2) the Holiday Inn hotel will be replaced with 95 apartment units and 120,000 square feet of office, and (3) the 46,000 square feet of offices on the Arden Plaza site will be replaced with a 14,400 square foot pharmacy and 5,000 square foot shopping center. To determine if there will be significant traffic impacts to the County Road E corridor, the following intersections are analyzed in this study: County Road E & Hamline Avenue West Ramp County Road E & Hamline Avenue East Ramp/Connelly Avenue County Road E & Pine Tree Drive County Road E & Holiday Inn Site Driveway County Road E & Arden Plaza Driveway County Road E & Lexington Avenue Lexington Avenue & Harriet Avenue Guiding Plan for the B2 District 1 Arden Hills, MN Traffic Impact Study December 2008 The principal findings of this study are: i. The roadways and study intersections within the study area currently operate acceptably at Level of Service (LOS) D or better and will continue to operate at LOS D or better through the 2030 Build scenario when the redevelopment is anticipated to be fully occupied. ii. The driveways on County Road E for the Holiday Inn site and the Arden Plaza site will experience significant delay and queuing in the p.m. peak hour. This is acceptable as an interim situation because little queuing is anticipated on County Road E to pose a safety problem. Long term, the queuing will impact the vitality of the redevelopments and could lead to safety problems. These driveways should be realigned midway between Pine Tree Drive and Lexington Avenue to provide a four legged intersection that could be controlled with a traffic signal. Left turn lanes and shared through/right lanes should be provided on the north and south legs to provide adequate egress. iii. No improvements are needed to facilitate the Pot ‘O Gold site redevelopment. iv. The County Road E corridor has a wide center two way left turn lane down the middle as well as many driveway intersections. This leads to a vehicle dominated corridor that is unfriendly to pedestrians and bicycles. It is envisioned County Road E will operate as a vibrant, multi- modal corridor that will attract pedestrians and bicycles. To provide a safe multi-modal corridor, it is recommended County Road E should ultimately be reconstructed from Hamline Avenue to Lexington Avenue to provide a landscaped median, bike lanes, boulevards, and sidewalks. Guiding Plan for the B2 District 2 Arden Hills, MN Traffic Impact Study December 2008 2. Proposed Development a. Site Location The study area is bordered by the railroad tracks on the north, Hamline Avenue on the West, Harriet Avenue on the south, and Lexington Avenue on the east. See Figure 2.1 for a location map. b. Land Use and Intensity Three redevelopment sites were identified through the planning process. Although redevelopment may occur outside of these three areas, this study analyzes the impact of redeveloping the Pot ‘O Gold, Holiday Inn, and Arden Plaza sites. Through the planning process, we were directed to analyze the impacts of the following development: 1. The Pot ‘O Gold bingo hall site will be replaced with 15,000 square feet of office. 2. The Holiday Inn hotel will be replaced with 95 apartment units and 120,000 square feet of office. 3. The 46,000 square feet of offices on the Arden Plaza site will be replaced with a 14,400 square foot pharmacy and 5,000 square foot shopping center. c. Concept Plan Figure 2.2 shows the location of the redevelopment sites d. Development Phasing and Timing This study assumes the development will be fully occupied by the end of 2030. Guiding Plan for the B2 District 3 Arden Hills, MN Traffic Impact Study December 2008 p"Aa—"FFC �S=ue�YCOM PA INY Figure 2.1 Location Maps t Guiding Plan for the B2 District North Arden Hills, MN No Scale Anora �. N O K ,' 3 14 „ q Vw $` Champlin 21 2f' ❑ ' t, Mir viNs 5 1 6rc* _ ��119D tD3Pine - ... Blae T-cs.L3,,e 't! ltl ,.LiRu l}eS 'Bt ._._ 7 - n6 '3D— 13 a Coon Rapids ------s"� -1 , ea rL�'e flsse7r 1De' „pn�9 Lalcep k _ lRA1rte tt 6car i5 11.._ - x Prla�Hill� 'YIIIIB n_Battett. - as 52 QBC>� Rar k B oFritiley Shoreview. n .DeW—ad D0 - - I[An EtW,kt4'YYVWy�"V1Nag}'• ,"oillarrne • 9' a�c = - 12 r tt � O ak F"xk He1#E T N 3 3 A- °► Canada .. 19 ' ruse ,pnr, :a 1D2 81:H a" �Maplevrool t7. 6ayp o (1 Iy � Roselnlle + rtF t Paul 1.4 akdale -L»k-Ehu 90g� Qo�z+t a>. t O $ � 73 Woodland y, ia1� fall: I ... ._. - I + s - i ,`y!!w•_ l3 eephaden tin - I aD l ae - .� - 3� r -_ , 1220 La T L k DY �.- Afton '. �� £. Edin$ 1 it� 62 _ks & L'Bli.$ .1 ___.1,♦�. Ott tC0 " 56 qD 1d dt� 5 cottage G ..95 L ♦� 3 77" loorniforgot 7 Grove ♦♦ < tl I a aline�a[N�.` ^ll 3ht�ie etrved�r� f. r +I.Fea Study Area raen ®aws`P� { R� h n Y� � .mac' S:L52 ':,- '® .� •:'a�'. '� dit�''''Lt""> ri r + ' G�at1 a C r' . 3. Analysis of Existing Conditions a. Physical Characteristics Each of the three redevelopment sites is being planned at a conceptual level. The beginning assumption is that they will utilize the existing access configurations. The three major roadways within the study area, all designated as minor arterials, are County Road E (Ramsey County State Aid Highway 15), Lexington Avenue (Ramsey County State Aid Highway 51), and Hamline Avenue(Minnesota Trunk Highway 51). The rest of the roadways within the study area are city streets. Existing traffic control, speed limits, and travel lanes are shown on Figure 3.1 for each study intersection. No roadway improvements are scheduled near the site. Metro Transit routes 225 and 261 travel along County Road E through the study area and on Lexington Avenue north of the study area. Route 261 also travels along Lexington Avenue through the study area. There are no major bus stops within the study area, but bus service is available during the day time hours. There are intermittent trails and sidewalks for pedestrians through the study area. The sidewalks along County Road E are interrupted by many driveways that serve the local businesses. There are bicyclists who use the corridor both on street and along the trails/sidewalks. The County Road E/Hamline Avenue interchange provides a significant barrier for pedestrians and bicycles who want to move along the County Road E corridor. The bridge over Hamline Avenue does not have sidewalks or on street bicycle lanes. b. Traffic Volumes In commercial/retail areas, such as the County Road E corridor, the p.m. peak hour is typically more congested than the a.m. peak period. For this reason, the analysis in this study focuses on the p.m. peak hour. Figure 3.2 shows the existing p.m. peak hour turning movement counts for the study area. The data for the street intersections was collected in 2008 and the turning movement count data is contained in fifteen minute intervals in the Appendix. The turning movement volume data for the County Road E/Arden Plaza driveway intersection is from the 2007 Traffic and Parking Study for Proposed Redevelopment of Arden Plaza. No turning movement volumes are shown for the Holiday Inn site because it is currently vacant and will be completely redeveloped. Guiding Plan for the 82 District 6 Arden Hills, MN Traffic Impact Studv December 2008 S p -a c -k PAfFI �-UD � �FA.� -- Figure 2.2 Concept Plan t Guiding Plan for the 132 District North Arden Hills, MN No Scale Pot'O Gold Site - Remove Bingo Hall -Add 15,000 sq ft of Office ®Holiday Inn Site • • - Remove Hotel a • -Add 95 Apartment Units -Add 120.000 so ft of Office 0 TV or {'may F x! a a� tk ♦ Arden Plaza Site • - Remove Offices -Add 14,400 sq ft Pharmacy -Add 5,000 sq ft Shopping Center c. Level of Service Los A An intersection capacity analysis was conducted for the existing intersections per the Highway - Capacity Manual. Intersections are assigned a "Level of Service" letter grade for the peak hour of traffic based on the number of lanes at the intersection, traffic volumes, and traffic control. Los C Level of Service A (LOS A) represents light a: �s- traffic flow (free flow conditions)while Level of Service F (LOS F) represents heavy traffic flow (over capacity conditions). LOS D is considered acceptable in urban conditions. The pictures on LOS D=Acceptable the left represent some of the LOS grades (from 1 *� a signal controlled intersection in San Jose, CA). `.t The LOS results for the existing study hours are shown in Table 3.2. These are based on the existing traffic control and lane configurations as cos F=Unacceptable existing in Figure 3.1. The existing turning r _ movement volumes from Figure 3.2 were used - � in the LOS calculations. The LOS calculations were done using SYNCHROT"' software. source: city of Ramsey County's existing timing plans were San Jose,CA used in the analyses. The complete LOS calculations are included in the Appendix. Table 3.2 — Existing Level of Service (LOS) Intersection Existing P.M. Peek Hour Co Rd E & Hamline Ave West Ramp B Co Rd E & Connell Ave C Co Rd E & Pine Tree Dr B Co Rd E & Holiday Inn Site Dvwy A Co Rd E & Arden Plaza Dvw A Co Rd E & Lexington Ave D Lexington Ave & Harriet Ave A All of the study intersections operate acceptably at LOS D or better in the existing p.m. weekday peak hour. d. Data Sources The sources for the data cited above are: • Turning movement volumes —Traffic Data Inc. & Wenck • Daily traffic volumes — Mn/DOT • Roadway geometries and traffic control — Spack Consulting • Concept plan — MFRA Guiding Plan Jor the B2 District 8 Arden Hills, MN Traffic Impact Study December 2008 Please note the traffic volumes do not balance between the study intersections because there are driveways and ancillary intersections between them. The historic daily traffic volumes for the area roadways are shown in Table 3.1. This data was furnished by Mn/DOT. Table 3.1 – Average Annual Daily Traffic Volumes 30,000 25,000 20,000 CR E E of Lexington CR E W of Lexington 15,000 Lexington N of CR E Lexington S of CR E 10,000 5,000 0 1986198819901994199619982000200320052007 Year 6,9006,4006,7007,0007,9009,10010,10010,5009,4009,100 CR E E of Lexington 16,00015,30015,70015,50015,80015,80016,30016,00016,00014,700 CR E W of Lexington 15,70014,50017,50017,00020,00019,00024,00023,00022,40022,400 Lexington N of CR E 13,50011,50012,50012,50012,00012,00014,00013,00011,80013,100 Lexington S of CR E Guiding Plan for the B2 District 7 Arden Hills, MN Traffic Impact Study December 2008 Ra -c k ,IFFIC STUDY ,F,PANY Fi ure 3.1 Existing Lanes & Traffic Control Guiding Plan for the B2 District Arden Hills, MN North No Scale IT- _s [. ai a o $ r r r west county r" ; «��L► = < Ian?y 'id E Road E 1 .. .. 11 Uzi County Road E u 35 m h F tL v - �� > �► ' m a o m rn E y t X . t = f0 `'� ten;:§s Est g ,� + e ,° Harriet Avenue 4 30 mph J IS ` q ' �c � �x 43 TIL a St r P 'q �FFF,c 5TUCIf MPANY Figure 3.2 Existing PM Peak Hour Traffic Volumes t Guiding Plan for the B2 District North Arden Hills, MN No Scale L 57 ILO v v 4 —619 0 0 0 4--730 J t 4 r 272 4.11 j 4 r 28 * 52../ r 0 j 4-1 t 14 623--O� N 960 —.0. o L 0 187� 51 -% o a, L 148 0 0 0 4-550 4�749 c`Do N 4—286 4 4 r310 r40 1 4 ra61 0�/* 4-j 1 r* *1 to 389� *1 1 f* 711 ­0 o 0 857 —► o 52 67 131 d � C C � � West Countv Road E a 3 c N 19 i d N m chi ♦�1 5+ ''1tf'' 0- 1 �.► o Q 62..+ riet Avenue a d c � E R o x rn c X N J Figure 3.3 Existing Daily Traffic Volumes Guiding Plan for the B2 District North Arden Hills, MN No Scale West County Road E 10,70016,0009,400 Harriet Avenue 1,450 LEGEND 2006 Average Annual Daily Traffic Volumes source: Mn/DOT Traffic Flow Maps 2005 Average Annual Daily Traffic Volumes source: Mn/DOT Traffic Flow Maps 4. Projected Traffic a. Site Traffic Forecasting A trip generation analysis was performed for the site based on the th methods and rates published in the ITE Trip Generation Manual, 7 Edition. The weekday p.m. peak hour trip generation is for the “one hour of adjacent street traffic” from 7-9 p.m. The resultant trip generations are shown in Table 4.1. The directional orientation of the generated traffic is shown in Figure 4.1. This orientation is based on a weighted distribution of the traffic volumes currently using the area roadways. The p.m. peak hour and daily trips generated by the site were assigned to the area roadways per the trip distributions shown in Figure 4.1. The traffic volumes added to the study roadways through this process are shown in Figures 4.2 and Figure 4.3. Figure 4.2 and 4.3 are the traffic added by the development in the p.m. peak hour and daily conditions respectively. b. Non-site Traffic Forecasting As shown in Table 3.1, the daily traffic volumes on County Road E and Lexington Avenue within the study area have not grown over the last twenty years. Based on the flat growth in daily traffic volumes within the study area, it is assumed their will be little growth in traffic volumes within the study area that is not directly attributed to the proposed redevelopment sites. Traffic forecasts were developed for the year 2030 No-Build scenario by rounding the existing volumes to represent the level of accuracy of the future forecasts. The resulting 2030 No-Build forecasts are shown in Figures 4.4 and 4.5. c. Total Traffic for 2030 Traffic forecasts were developed for the year 2030 Build scenario by adding the traffic generated by the proposed development, as shown in Figures 4.2 and 4.3, to the No-Build volumes shown in Figures 4.4 and 4.5. The resultant 2030 Build traffic forecasts are shown in Figures 4.6 and 4.7. Guiding Plan for the B2 District 12 Arden Hills, MN Traffic Impact Study December 2008 ac k p RAFF�C 5TUDY C C,r.,P..:ti Figure 4.1 Trip Distribution Guiding Plan for the B2 District North Arden Hills, MN No Scale T ''SDI n � r n V O1 50/n arrlek O r� 4 n " x w - r X r w w N IL Z z .�. M O G "�" Onf Z f" Q M M O r n . M tp r Ca 2to :: o 0 0 0 0 0 0 o 0 0 0 0 0 0 d y V o 0 o a e N U e o e e o a Na � ILa', o w LU w 111 `G Z � N O a zm U o e a o e U'. o o e o a a R' LLI O g IL IL C w T W V W a a e o e t= w" e e a o e N U. M t0 M O N M m W L G 9L c w w m = > H rn U 2 o W o e o e m e m w CT n �n n o `co n L o O Z p, Z Qom' �O N N N N O w w r t0 r N O r O` w d. w m O C N w 3 C � J F O r O O Of V tD V N n «�i O F O w m E c } n = cc m L6 N V C_ Y C G Q O m ._ C'I LF W a° m v 3 m C c N V �^ O A 12 '- Z a a a a a ¢ w a a a ¢ M U. U. lL LL. LL N LL LL LL LL p 0 � _ a C9 �' C9 C7 C9 (9 3► C9 C9 C� (7 (9 p, O m v E Z Z I- V, p o N o m N }w.Q o N O N o c o u 0.. •O � V � c C m L) U i 9 O m U 3 O Y na L o N -p m c m a c m m _ I > w- ° m > m rn m w U p w 3 0 m w C V d a E Vol ¢ r Q i Z E m E m a u Z m r E a OF Qc Y m CL R C « d 0 ¢ O a m 0 3 O a 0 E m U) a a o Nac vc c iiil LLn U) co U N NN 7 ~aO N mR a a a O a a a c O c c wOR vm (.9w o 0 -E v -a aO a o 6LL Q 0 x = ¢ ¢ a n = x TE Figure 4.2 PM Peak Hour Traffic Volumes Due to Development Guiding Plan for the B2 District North Arden Hills, MN No Scale 0 50 30 3050 0 30140 00300 106030 300 0 070 106040 0060 West County Road E 0 0 0 0 0 0 Harriet Avenue 50 20 20 40 Figure 4.3 Daily Traffic Volumes Due to Development Guiding Plan for the B2 District North Arden Hills, MN No Scale West County Road E 2001,000600 Harriet Avenue 0 Figure 4.4 2030 PM Peak Hour No-Build Traffic Volumes Guiding Plan for the B2 District North Arden Hills, M No Scale 600 700730 27030 24 500 680960 019050150 550750290 3104060 135 0390 710860500 5070130 West County Road E 20 0 10 6 10 0 60 Harriet Avenue Figure 4.5 2030 Daily No-Build Traffic Volumes Guiding Plan for the B2 District North Arden Hills, MN No Scale West County Road E 10,70016,0009,400 Harriet Avenue 1,500 Figure 4.6 2030 PM Peak Hour Build Traffic Volumes Guiding Plan for the B2 District North Arden Hills, MN No Scale 60 780 730 30080 50 7101,100 080150 190 560810320 34060 40 0460 720920540 5070190 West County Road E 20 0 10 10 0 60 Harriet Avenue 50 790 20 970 Figure 4.7 2030 Daily Build Traffic Volumes Guiding Plan for the B2 District North Arden Hills, MN No Scale West County Road E 10,90017,00010,000 Harriet Avenue 1,500 5. Traffic and Improvement Analysis a. 2030 Level of Service Analysis The LOS results for the 2030 study hours are shown in Table 5.1. These are based on the existing traffic control and lane configurations as shown in Figure 3.1. The forecast turning movement volumes from Figures 4.4 and 4.6 were used in the LOS TM calculations. The LOS calculations were done using SYNCHRO software. Ramsey County’s existing timing plans were used in the analyses. The complete LOS calculations are included in the Appendix. Table 5.1 – 2030 P.M. Peak Hour Level of Service (LOS) IntersectionNo-Build Build Co Rd E & Hamline Ave West Ramp B B Co Rd E & Connelly Ave C C Co Rd E & Pine Tree Dr B B Co Rd E & Holiday Inn Site Dvwy A C Co Rd E & Arden Plaza Dvwy A B Co Rd E & Lexington Ave D D Lexington Ave & Harriet Ave A A All of the intersections will operate acceptably at LOS Dor better during the 2030 weekday p.m. peak hour in both the No-Build and Build scenarios. The Holiday Inn Site driveway and the Arden Plaza driveway intersections on County Road E will operate acceptably with little delay and vehicle stacking on County Road E, however vehicles will experience significant delay trying to turn onto County Road E during the evening peak period after the sites are redeveloped. The LOS calculations predict it will take approximately 3 minutes per vehicle on average to turn from Arden Plaza onto County Road E and approximately 3½ minutes per vehicle on average to turn from the Holiday Inn site onto County Road E. Because motorists are queuing in parking lots instead of on high speed public roadways, this type of delay can be tolerated in an interim situation but improvements should be planned to reduce these delays. Based on calculations from the Transportation Research Board’s Highway Capacity Manual, roadway segments operate at LOS D if they carry the following daily volumes: 9,000 vehicles per day - Two Lane Roadways (Harriet Avenue) Guiding Plan for the B2 District 21 Arden Hills, MN Traffic Impact Study December 2008 14,000 vehicles per day - Two Lane Roadways with Turn Lanes (Pine Tree Drive, Lexington Avenue at Harriet Avenue, and County Road E west of Hamline Avenue) 27,000 vehicles per day - Four Lane Roadways with Turn Lanes (Lexington Avenue at County Road E and County Road E east of Hamline Avenue) 45,000 vehicles per day - Four Lane Expressways (Hamline Avenue) Figures 4.5 and 4.7 show the 2030 daily volumes anticipated on the area roadways. The daily traffic volumes within the study area will operate at or better than LOS D in both the 2030 No-Build and 2030 Build scenarios. b. Long Range Improvements Even though the roadways and intersections will operate within traffic engineering standards, it will be difficult for vehicles to leave the Holiday Inn and Arden Plaza sites during the evening rush hour. To assist the redevelopment efforts, it is recommended the Arden Plaza and Holiday Inn driveways be realigned midway between Pine Tree Drive and Lexington Avenue. Left turn lanes and shared right/through lanes should be built on the new north and south legs of the intersection to provide adequate egress and the intersection should be controlled with a traffic signal. The signal should be installed when the traffic volumes at the intersection meet the criteria for installing a traffic signal per the Minnesota Manual on Uniform Traffic Control Devices. These improvements are shown schematically on Figure 5.1. When the traffic signal is installed at the new intersection it will operate at LOS B in the 2030 Build p.m. peak hour. This leaves capacity to accommodate significantly more redevelopment as long as the traffic from the redevelopment is focused at the signalized intersection. Based on the Guiding Planning efforts, it is envisioned the County Road E corridor should provide safe mobility for pedestrians and bicycles as well as vehicles. Several improvements are recommended to accomplish this goal (see Figure 5.1): Construct a landscaped median on County Road E from Hamline Avenue to Lexington Avenue to convert the private driveways along County Road E into right-in/right-out accesses. Driveways should be consolidated whenever feasible to limit the conflict points along the corridor. Provide left turn lanes at public street intersections. Guiding Plan for the B2 District 22 Arden Hills, MN Traffic Impact Study December 2008 Provide on street bicycle lanes. Provide sidewalks. Improve the landscaping to provide a human scale to the corridor. Provide eleven foot wide travel lanes which will reinforce the 35 mph speed limit. Minimize traffic signs within the corridor whenever feasible. Extend the bicycle and pedestrian facilities through the County Road E/Hamline Avenue interchange when it is reconstructed. The cross section in Figure 5.1 was developed with MFRA to utilize the existing pavement width and curbs. Using the existing curb and gutter system will minimize the cost of reconstructing the corridor. It will also shorten the construction period, lessening the impact on local businesses. County Road E is under the jurisdiction of Ramsey County. The City will need to work collaboratively with the County to gain approval for these recommended improvements. Guiding Plan for the B2 District 23 Arden Hills, MN Traffic Impact Study December 2008 PTHETRAFFIC STUDY COMPANY Figure 5.1 Recommended Long Range Improvements Guiding Plan for the B2 District Arden Hills, MN I 3 BfKE DRNE LANC?SCAPE �.tEDtAN ANp - .. .. •;. SIGEWAi,J� EtOULEVARD DRTVE LEFT- TURN UNE U "tt L2R€VE fai;E 11I mot( BOULEVARD SIDEWALK , � 72' +u' 1,.--..___._.,....._....�... 88' ROw__-- t Reconstruct County Road E from Hamline Avenue to Lexington Avenue to provide a landscaped median, bike lanes, boulevards, and sidewalks. r .f r a - Align Holiday Inn Site driveway and Arden Plaza driveway midway between Pine Tree Drive and Lexington Avenue. - Control newly formed intersection with a traffic signal. - Provide left turn lanes on the north and south approaches to the intersection. - Promote connecticity throughout parcels to utilize the signalized intersection. 6. Conclusions and Recommendations The roadways and study intersections within the study area currently operate acceptably at Level of Service (LOS) D or better in the weekday p.m. peak hour and will continue to operate at LOS D or better through the 2030 Build scenario when the redevelopment is anticipated to be fully occupied. The driveways on County Road E for the Holiday Inn site and the Arden Plaza site will experience significant delay and queuing in the p.m. peak hour. This is acceptable as an interim situation because little queuing is anticipated on County Road E to pose a safety problem. Long term, the queuing will impact the vitality of the redevelopments and could lead to safety problems. These driveways should be realigned midway between Pine Tree Drive and Lexington Avenue to provide a four legged intersection that could be controlled with a traffic signal. The County Road E corridor has a wide center two way left turn lane down the middle as well as many driveway intersections. This leads to a vehicle dominated corridor that is unfriendly to pedestrians and bicycles. It is envisioned County Road E will operate as a vibrant, multi-modal corridor that will attract pedestrians and bicycles. To provide a safe multi-modal corridor, it is recommended County Road E should ultimately be reconstructed from Hamline Avenue to Lexington Avenue to provide a landscaped median, bike lanes, boulevards, and sidewalks. 7. Appendix a. Traffic counts b. Capacity analysis calculations Guiding Plan for the B2 District 25 Arden Hills, MN Traffic Impact Study December 2008 Appendix A Traffic Counts Appendix B Capacity Analysis Existing PM Peak HourCounty Road E Master Plan HCM Signalized Intersection Capacity Analysis 1: West County Road E & Hwy 51 SB Ramp MovementEBTEBRWBLWBTNBLNBR Lane Configurations Ideal Flow (vphpl)190019001900190019001900 Total Lost time (s)4.04.04.04.0 Lane Util. Factor1.001.001.001.00 Frt0.991.001.000.89 Flt Protected1.000.951.000.99 Satd. Flow (prot)1845177018631642 Flt Permitted1.000.191.000.99 Satd. Flow (perm)184535718631642 Volume (vph)7115231055047210 Peak-hour factor, PHF0.920.920.920.920.920.92 Adj. Flow (vph)7735733759851228 RTOR Reduction (vph)20001950 Lane Group Flow (vph)8280337598840 Turn Typepm+pt Protected Phases2168 Permitted Phases6 Actuated Green, G (s)53.772.271.79.8 Effective Green, g (s)54.272.272.29.8 Actuated g/C Ratio0.600.800.800.11 Clearance Time (s)4.54.04.54.0 Vehicle Extension (s)3.03.03.03.0 Lane Grp Cap (vph)11115061495179 v/s Ratio Protc0.45c0.100.32c0.05 v/s Ratio Perm0.43 v/c Ratio0.740.670.400.47 Uniform Delay, d112.919.22.637.7 Progression Factor1.000.560.281.00 Incremental Delay, d24.62.60.61.9 Delay (s)17.513.41.339.6 Level of ServiceBBAD Approach Delay (s)17.55.739.6 Approach LOSBAD Intersection Summary HCM Average Control Delay15.1HCM Level of ServiceB HCM Volume to Capacity ratio0.67 Actuated Cycle Length (s) 90.0Sum of lost time (s)8.0 Intersection Capacity Utilization83.3%ICU Level of ServiceE Analysis Period (min)15 c Critical Lane Group 9/3/2008Synchro 6 Report Page 1 TDI Existing PM Peak HourCounty Road E Master Plan HCM Signalized Intersection Capacity Analysis 2: West County Road E & Connelly Ave MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Total Lost time (s)4.04.04.04.04.04.04.0 Lane Util. Factor1.000.951.001.001.001.001.00 Frt1.000.971.001.000.850.930.95 Flt Protected0.951.000.951.001.000.980.98 Satd. Flow (prot)1770341717701863158316941736 Flt Permitted0.371.000.131.001.000.830.78 Satd. Flow (perm)68234172431863158314391373 Volume (vph)526231872726195712128179462842 Peak-hour factor, PHF0.920.920.920.920.920.920.920.920.920.920.920.92 Adj. Flow (vph)576772032966736213230195503046 RTOR Reduction (vph)0300003004800230 Lane Group Flow (vph)578500296673320309001030 Turn Typepm+ptpm+ptPermPermPerm Protected Phases521684 Permitted Phases26684 Actuated Green, G (s)33.833.345.345.345.328.528.5 Effective Green, g (s)33.833.845.845.845.829.029.0 Actuated g/C Ratio0.380.380.510.510.510.320.32 Clearance Time (s)4.04.54.04.54.54.54.5 Vehicle Extension (s)3.03.03.03.03.03.03.0 Lane Grp Cap (vph)2951283382948806464442 v/s Ratio Prot0.01c0.25c0.130.36 v/s Ratio Perm0.07c0.260.02c0.210.08 v/c Ratio0.190.660.770.710.040.670.23 Uniform Delay, d121.223.419.917.011.126.322.3 Progression Factor0.490.571.061.112.001.001.00 Incremental Delay, d20.21.88.94.20.17.41.2 Delay (s)10.615.030.023.022.233.723.6 Level of ServiceBBCCCCC Approach Delay (s)14.725.033.723.6 Approach LOSBCCC Intersection Summary HCM Average Control Delay22.3HCM Level of ServiceC HCM Volume to Capacity ratio0.70 Actuated Cycle Length (s) 90.0Sum of lost time (s)8.0 Intersection Capacity Utilization72.4%ICU Level of ServiceC Analysis Period (min)15 c Critical Lane Group 9/3/2008Synchro 6 Report Page 2 TDI Existing PM Peak HourCounty Road E Master Plan HCM Signalized Intersection Capacity Analysis 3: West County Road E & Pine Tree Drive MovementEBTEBRWBLWBTNBLNBR Lane Configurations Ideal Flow (vphpl)190019001900190019001900 Total Lost time (s)4.04.04.04.04.0 Lane Util. Factor0.951.000.951.001.00 Frt0.991.001.001.000.85 Flt Protected1.000.951.000.951.00 Satd. Flow (prot)35011770353917701583 Flt Permitted1.000.201.000.951.00 Satd. Flow (perm)3501375353917701583 Volume (vph)8576740749205101 Peak-hour factor, PHF0.920.920.920.920.920.92 Adj. Flow (vph)9327343814223110 RTOR Reduction (vph)6000078 Lane Group Flow (vph)99904381422332 Turn Typepm+ptPerm Protected Phases2168 Permitted Phases68 Actuated Green, G (s)44.956.055.526.026.0 Effective Green, g (s)45.456.056.026.026.0 Actuated g/C Ratio0.500.620.620.290.29 Clearance Time (s)4.54.04.54.04.0 Vehicle Extension (s)3.03.03.03.03.0 Lane Grp Cap (vph)17663362202511457 v/s Ratio Protc0.290.01c0.23c0.13 v/s Ratio Perm0.070.02 v/c Ratio0.570.130.370.440.07 Uniform Delay, d115.514.38.326.023.2 Progression Factor0.711.001.001.001.00 Incremental Delay, d21.10.20.52.70.3 Delay (s)12.114.48.828.723.5 Level of ServiceBBACC Approach Delay (s)12.19.127.0 Approach LOSBAC Intersection Summary HCM Average Control Delay13.2HCM Level of ServiceB HCM Volume to Capacity ratio0.49 Actuated Cycle Length (s) 90.0Sum of lost time (s)8.0 Intersection Capacity Utilization50.5%ICU Level of ServiceA Analysis Period (min)15 c Critical Lane Group 9/3/2008Synchro 6 Report Page 3 TDI Existing PM Peak HourCounty Road E Master Plan HCM Signalized Intersection Capacity Analysis 5: West County Road E & Lexington Ave MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Total Lost time (s)4.04.04.04.04.04.04.04.0 Lane Util. Factor1.000.951.000.951.000.951.000.95 Frt1.000.971.000.951.000.991.000.95 Flt Protected0.951.000.951.000.951.000.951.00 Satd. Flow (prot)17703429177033581770349717703357 Flt Permitted0.181.000.391.000.131.000.291.00 Satd. Flow (perm)3343429730335824534975463357 Volume (vph)3894981316128614812364556244669350 Peak-hour factor, PHF0.920.920.920.920.920.920.920.920.920.920.920.92 Adj. Flow (vph)4235411426631116113470161265727380 RTOR Reduction (vph)020005500500550 Lane Group Flow (vph)4236630664170134757026510520 Turn Typepm+ptpm+ptpm+ptpm+pt Protected Phases74385216 Permitted Phases4826 Actuated Green, G (s)49.941.222.017.338.138.146.145.1 Effective Green, g (s)50.942.223.018.339.139.146.146.1 Actuated g/C Ratio0.430.360.200.160.330.330.390.39 Clearance Time (s)4.05.04.05.04.05.04.05.0 Vehicle Extension (s)3.03.03.03.03.03.03.03.0 Lane Grp Cap (vph)493122918452219411623771315 v/s Ratio Protc0.210.190.010.120.05c0.220.09c0.31 v/s Ratio Permc0.160.060.180.18 v/c Ratio0.860.540.360.800.690.650.700.80 Uniform Delay, d130.130.039.647.932.333.534.831.7 Progression Factor1.001.001.001.001.001.001.001.00 Incremental Delay, d213.80.51.28.410.12.85.85.2 Delay (s)43.930.540.856.342.436.340.736.9 Level of ServiceDCDEDDDD Approach Delay (s)35.654.437.237.6 Approach LOSDDDD Intersection Summary HCM Average Control Delay39.3HCM Level of ServiceD HCM Volume to Capacity ratio0.81 Actuated Cycle Length (s) 117.7Sum of lost time (s)12.0 Intersection Capacity Utilization84.0%ICU Level of ServiceE Analysis Period (min)15 c Critical Lane Group 9/3/2008Synchro 6 Report Page 4 TDI Existing PM Peak HourCounty Road E Master Plan HCM Unsignalized Intersection Capacity Analysis 4: West County Road E & Arden Plaza Dvwy MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Sign ControlFreeFreeStopStop Grade0%0%0%0% Volume (veh/h)09605128730043061000 Peak Hour Factor0.920.920.920.920.920.920.920.920.920.920.920.92 Hourly flow rate (vph)010435530793047066000 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh)1 Median typeNoneNone Median storage veh) Upstream signal (ft)900464 pX, platoon unblocked0.940.820.850.850.820.850.850.94 vC, conflicting volume79310981533192954913801957397 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol7228991250171822910701750301 tC, single (s)4.14.17.56.56.97.56.56.9 tC, 2 stage (s) tF (s)2.22.23.54.03.33.54.03.3 p0 queue free %100955910090100100100 cM capacity (veh/h)8276161057163412868656 Direction, Lane #EB 1EB 2EB 3WB 1WB 2WB 3NB 1SB 1 Volume Total0696403305292641130 Volume Left0003000470 Volume Right0055000660 cSH170017001700616170017002371700 Volume to Capacity0.000.410.240.050.310.160.460.00 Queue Length 95th (ft)000400560 Control Delay (s)0.00.00.011.20.00.032.50.0 Lane LOSBDA Approach Delay (s)0.00.432.50.0 Approach LOSDA Intersection Summary Average Delay 1.9 Intersection Capacity Utilization 38.6%ICU Level of Service A Analysis Period (min)15 9/3/2008Synchro 6 Report Page 1 TDI Existing PM Peak HourCounty Road E Master Plan HCM Unsignalized Intersection Capacity Analysis 6: Harriet Ave & Lexington Ave MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Sign ControlStopStopFreeFree Grade0%0%0%0% Volume (veh/h)5162611940716163480926 Peak Hour Factor0.920.920.920.920.920.920.920.920.920.920.920.92 Hourly flow rate (vph)5167712143778173787928 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume1854185089318951855787908796 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol1854185089318951855787908796 tC, single (s)7.16.56.27.16.56.24.14.1 tC, 2 stage (s) tF (s)3.54.03.33.54.03.32.22.2 p0 queue free %8998808398959496 cM capacity (veh/h)49673403966392750826 Direction, Lane #EB 1WB 1NB 1NB 2SB 1SB 2 Volume Total74284379637908 Volume Left57430370 Volume Right6721017028 cSH22711975017008261700 Volume to Capacity0.330.240.060.470.040.53 Queue Length 95th (ft)34225040 Control Delay (s)28.344.410.10.09.60.0 Lane LOSDEBA Approach Delay (s)28.344.40.50.4 Approach LOSDE Intersection Summary Average Delay 2.2 Intersection Capacity Utilization 55.3%ICU Level of Service B Analysis Period (min)15 9/3/2008Synchro 6 Report Page 2 TDI 2030 PM Peak Hour No BuildCounty Road E Master Plan HCM Signalized Intersection Capacity Analysis 1: West County Road E & Hwy 51 SB Ramp MovementEBTEBRWBLWBTNBLNBR Lane Configurations Ideal Flow (vphpl)190019001900190019001900 Total Lost time (s)4.04.04.04.0 Lane Util. Factor1.001.001.001.00 Frt0.991.001.000.89 Flt Protected1.000.951.000.99 Satd. Flow (prot)1846177018631644 Flt Permitted1.000.191.000.99 Satd. Flow (perm)184635418631644 Volume (vph)7105031055050210 Peak-hour factor, PHF0.920.920.920.920.920.92 Adj. Flow (vph)7725433759854228 RTOR Reduction (vph)20001830 Lane Group Flow (vph)8240337598990 Turn Typepm+pt Protected Phases2168 Permitted Phases6 Actuated Green, G (s)53.271.771.210.3 Effective Green, g (s)53.771.771.710.3 Actuated g/C Ratio0.600.800.800.11 Clearance Time (s)4.54.04.54.0 Vehicle Extension (s)3.03.03.03.0 Lane Grp Cap (vph)11015021484188 v/s Ratio Protc0.45c0.100.32c0.06 v/s Ratio Perm0.43 v/c Ratio0.750.670.400.52 Uniform Delay, d113.219.52.737.5 Progression Factor1.000.500.271.00 Incremental Delay, d24.72.30.52.6 Delay (s)17.912.01.340.2 Level of ServiceBBAD Approach Delay (s)17.95.140.2 Approach LOSBAD Intersection Summary HCM Average Control Delay15.1HCM Level of ServiceB HCM Volume to Capacity ratio0.67 Actuated Cycle Length (s) 90.0Sum of lost time (s)8.0 Intersection Capacity Utilization83.3%ICU Level of ServiceE Analysis Period (min)15 c Critical Lane Group 9/3/2008Synchro 6 Report Page 1 TDI 2030 PM Peak Hour No BuildCounty Road E Master Plan HCM Signalized Intersection Capacity Analysis 2: West County Road E & Connelly Ave MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Total Lost time (s)4.04.04.04.04.04.04.0 Lane Util. Factor1.000.951.001.001.001.001.00 Frt1.000.971.001.000.850.930.96 Flt Protected0.951.000.951.001.000.980.98 Satd. Flow (prot)1770342317701863158316951743 Flt Permitted0.261.000.131.001.000.840.76 Satd. Flow (perm)49034232431863158314411347 Volume (vph)506801902707006012030180503040 Peak-hour factor, PHF0.920.920.920.920.920.920.920.920.920.920.920.92 Adj. Flow (vph)547392072937616513033196543343 RTOR Reduction (vph)0270003204800200 Lane Group Flow (vph)549190293761330311001100 Turn Typepm+ptpm+ptPermPermPerm Protected Phases521684 Permitted Phases26684 Actuated Green, G (s)33.933.445.345.345.328.528.5 Effective Green, g (s)33.933.945.845.845.829.029.0 Actuated g/C Ratio0.380.380.510.510.510.320.32 Clearance Time (s)4.04.54.04.54.54.54.5 Vehicle Extension (s)3.03.03.03.03.03.03.0 Lane Grp Cap (vph)2301289380948806464434 v/s Ratio Prot0.01c0.270.13c0.41 v/s Ratio Perm0.080.260.02c0.220.08 v/c Ratio0.230.710.770.800.040.670.25 Uniform Delay, d125.723.920.118.311.126.422.5 Progression Factor0.500.581.051.091.901.001.00 Incremental Delay, d20.32.28.96.80.17.51.4 Delay (s)13.216.030.026.921.233.923.9 Level of ServiceBBCCCCC Approach Delay (s)15.927.333.923.9 Approach LOSBCCC Intersection Summary HCM Average Control Delay23.7HCM Level of ServiceC HCM Volume to Capacity ratio0.73 Actuated Cycle Length (s) 90.0Sum of lost time (s)8.0 Intersection Capacity Utilization73.8%ICU Level of ServiceD Analysis Period (min)15 c Critical Lane Group 9/3/2008Synchro 6 Report Page 2 TDI 2030 PM Peak Hour No BuildCounty Road E Master Plan HCM Signalized Intersection Capacity Analysis 3: West County Road E & Pine Tree Drive MovementEBTEBRWBLWBTNBLNBR Lane Configurations Ideal Flow (vphpl)190019001900190019001900 Total Lost time (s)4.04.04.04.04.0 Lane Util. Factor0.951.000.951.001.00 Frt0.991.001.001.000.85 Flt Protected1.000.951.000.951.00 Satd. Flow (prot)34991770353917701583 Flt Permitted1.000.201.000.951.00 Satd. Flow (perm)3499371353917701583 Volume (vph)8607040750210100 Peak-hour factor, PHF0.920.920.920.920.920.92 Adj. Flow (vph)9357643815228109 RTOR Reduction (vph)6000078 Lane Group Flow (vph)100504381522831 Turn Typepm+ptPerm Protected Phases2168 Permitted Phases68 Actuated Green, G (s)44.956.055.526.026.0 Effective Green, g (s)45.456.056.026.026.0 Actuated g/C Ratio0.500.620.620.290.29 Clearance Time (s)4.54.04.54.04.0 Vehicle Extension (s)3.03.03.03.03.0 Lane Grp Cap (vph)17653332202511457 v/s Ratio Protc0.290.01c0.23c0.13 v/s Ratio Perm0.070.02 v/c Ratio0.570.130.370.450.07 Uniform Delay, d115.514.48.326.123.2 Progression Factor0.671.001.001.001.00 Incremental Delay, d21.00.20.52.80.3 Delay (s)11.314.58.828.923.5 Level of ServiceBBACC Approach Delay (s)11.39.127.2 Approach LOSBAC Intersection Summary HCM Average Control Delay12.9HCM Level of ServiceB HCM Volume to Capacity ratio0.50 Actuated Cycle Length (s) 90.0Sum of lost time (s)8.0 Intersection Capacity Utilization51.0%ICU Level of ServiceA Analysis Period (min)15 c Critical Lane Group 9/3/2008Synchro 6 Report Page 3 TDI 2030 PM Peak Hour No BuildCounty Road E Master Plan HCM Signalized Intersection Capacity Analysis 5: West County Road E & Lexington Ave MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Total Lost time (s)4.04.04.04.04.04.04.04.0 Lane Util. Factor1.000.951.000.951.000.951.000.95 Frt1.000.971.000.951.000.991.000.95 Flt Protected0.951.000.951.000.951.000.951.00 Satd. Flow (prot)17703430177033581770349517703357 Flt Permitted0.181.000.391.000.131.000.291.00 Satd. Flow (perm)3343430729335824534955323357 Volume (vph)3905001306029015012065060240670350 Peak-hour factor, PHF0.920.920.920.920.920.920.920.920.920.920.920.92 Adj. Flow (vph)4245431416531516313070765261728380 RTOR Reduction (vph)019005500500550 Lane Group Flow (vph)4246650654230130767026110530 Turn Typepm+ptpm+ptpm+ptpm+pt Protected Phases74385216 Permitted Phases4826 Actuated Green, G (s)50.041.322.017.338.138.146.145.1 Effective Green, g (s)51.042.323.018.339.139.146.146.1 Actuated g/C Ratio0.430.360.200.160.330.330.390.39 Clearance Time (s)4.05.04.05.04.05.04.05.0 Vehicle Extension (s)3.03.03.03.03.03.03.03.0 Lane Grp Cap (vph)494123218452219411603731314 v/s Ratio Protc0.210.190.010.130.05c0.220.09c0.31 v/s Ratio Permc0.160.050.170.18 v/c Ratio0.860.540.350.810.670.660.700.80 Uniform Delay, d130.130.039.648.132.333.735.131.8 Progression Factor1.001.001.001.001.001.001.001.00 Incremental Delay, d213.80.51.29.38.83.05.75.2 Delay (s)43.930.540.857.341.136.640.737.0 Level of ServiceDCDEDDDD Approach Delay (s)35.655.437.337.7 Approach LOSDEDD Intersection Summary HCM Average Control Delay39.5HCM Level of ServiceD HCM Volume to Capacity ratio0.82 Actuated Cycle Length (s) 117.8Sum of lost time (s)12.0 Intersection Capacity Utilization84.1%ICU Level of ServiceE Analysis Period (min)15 c Critical Lane Group 9/3/2008Synchro 6 Report Page 4 TDI 2030 PM Peak Hour No BuildCounty Road E Master Plan HCM Unsignalized Intersection Capacity Analysis 4: West County Road E & (Vacant Site) MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Sign ControlFreeFreeStopStop Grade0%0%0%0% Volume (veh/h)09605030730040060000 Peak Hour Factor0.920.920.920.920.920.920.920.920.920.920.920.92 Hourly flow rate (vph)010435433793043065000 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh)1 Median typeNoneNone Median storage veh) Upstream signal (ft)900464 pX, platoon unblocked0.940.820.850.850.820.850.850.94 vC, conflicting volume79310981533192954913801957397 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol7198971241171022610621742297 tC, single (s)4.14.17.56.56.97.56.56.9 tC, 2 stage (s) tF (s)2.22.23.54.03.33.54.03.3 p0 queue free %100955910090100100100 cM capacity (veh/h)8276161077263613069658 Direction, Lane #EB 1EB 2EB 3WB 1WB 2WB 3NB 1SB 1 Volume Total0696402335292641090 Volume Left0003300430 Volume Right0054000650 cSH170017001700616170017002401700 Volume to Capacity0.000.410.240.050.310.160.450.00 Queue Length 95th (ft)000400550 Control Delay (s)0.00.00.011.20.00.031.90.0 Lane LOSBDA Approach Delay (s)0.00.431.90.0 Approach LOSDA Intersection Summary Average Delay 1.9 Intersection Capacity Utilization 38.5%ICU Level of Service A Analysis Period (min)15 9/3/2008Synchro 6 Report Page 1 TDI 2030 PM Peak Hour No BuildCounty Road E Master Plan HCM Unsignalized Intersection Capacity Analysis 6: Harriet Ave & Lexington Ave MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Sign ControlStopStopFreeFree Grade0%0%0%0% Volume (veh/h)100601002040720203081030 Peak Hour Factor0.920.920.920.920.920.920.920.920.920.920.920.92 Hourly flow rate (vph)110651102243783223388033 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume1853185389718911859793913804 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol1853185389718911859793913804 tC, single (s)7.16.56.27.16.56.24.14.1 tC, 2 stage (s) tF (s)3.54.03.33.54.03.32.22.2 p0 queue free %781008173100949496 cM capacity (veh/h)50673394066388746820 Direction, Lane #EB 1WB 1NB 1NB 2SB 1SB 2 Volume Total76334380433913 Volume Left1111430330 Volume Right6522022033 cSH1859974617008201700 Volume to Capacity0.410.330.060.470.040.54 Queue Length 95th (ft)46325030 Control Delay (s)37.558.110.10.09.60.0 Lane LOSEFBA Approach Delay (s)37.558.10.50.3 Approach LOSEF Intersection Summary Average Delay 2.9 Intersection Capacity Utilization 55.8%ICU Level of Service B Analysis Period (min)15 9/3/2008Synchro 6 Report Page 2 TDI 2030 PM Peak Hour BuildCounty Road E Master Plan HCM Signalized Intersection Capacity Analysis 1: West County Road E & Hwy 51 SB Ramp MovementEBTEBRWBLWBTNBLNBR Lane Configurations Ideal Flow (vphpl)190019001900190019001900 Total Lost time (s)4.04.04.04.0 Lane Util. Factor1.001.001.001.00 Frt0.991.001.000.89 Flt Protected1.000.951.000.99 Satd. Flow (prot)1847177018631641 Flt Permitted1.000.181.000.99 Satd. Flow (perm)184734018631641 Volume (vph)7205034056050230 Peak-hour factor, PHF0.920.920.920.920.920.92 Adj. Flow (vph)7835437060954250 RTOR Reduction (vph)20002010 Lane Group Flow (vph)83503706091030 Turn Typepm+pt Protected Phases2168 Permitted Phases6 Actuated Green, G (s)53.171.671.110.4 Effective Green, g (s)53.671.671.610.4 Actuated g/C Ratio0.600.800.800.12 Clearance Time (s)4.54.04.54.0 Vehicle Extension (s)3.03.03.03.0 Lane Grp Cap (vph)11004931482190 v/s Ratio Prot0.45c0.120.33c0.06 v/s Ratio Permc0.48 v/c Ratio0.760.750.410.54 Uniform Delay, d113.420.42.837.6 Progression Factor1.000.490.271.00 Incremental Delay, d24.93.90.53.2 Delay (s)18.413.91.340.7 Level of ServiceBBAD Approach Delay (s)18.46.040.7 Approach LOSBAD Intersection Summary HCM Average Control Delay15.9HCM Level of ServiceB HCM Volume to Capacity ratio0.71 Actuated Cycle Length (s) 90.0Sum of lost time (s)8.0 Intersection Capacity Utilization86.7%ICU Level of ServiceE Analysis Period (min)15 c Critical Lane Group 9/3/2008Synchro 6 Report Page 1 TDI 2030 PM Peak Hour BuildCounty Road E Master Plan HCM Signalized Intersection Capacity Analysis 2: West County Road E & Connelly Ave MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Total Lost time (s)4.04.04.04.04.04.04.0 Lane Util. Factor1.000.951.001.001.001.001.00 Frt1.000.971.001.000.850.920.95 Flt Protected0.951.000.951.001.000.980.98 Satd. Flow (prot)1770342717701863158316901736 Flt Permitted0.231.000.131.001.000.830.72 Satd. Flow (perm)43634272511863158314251271 Volume (vph)507101903007306012030200603050 Peak-hour factor, PHF0.920.920.920.920.920.920.920.920.920.920.920.92 Adj. Flow (vph)547722073267936513033217653354 RTOR Reduction (vph)0260003205400220 Lane Group Flow (vph)549530326793330326001300 Turn Typepm+ptpm+ptPermPermPerm Protected Phases521684 Permitted Phases26684 Actuated Green, G (s)32.932.445.345.345.328.528.5 Effective Green, g (s)32.932.945.845.845.829.029.0 Actuated g/C Ratio0.370.370.510.510.510.320.32 Clearance Time (s)4.04.54.04.54.54.54.5 Vehicle Extension (s)3.03.03.03.03.03.03.0 Lane Grp Cap (vph)2071253399948806459410 v/s Ratio Prot0.01c0.280.15c0.43 v/s Ratio Perm0.090.270.02c0.230.10 v/c Ratio0.260.760.820.840.040.710.32 Uniform Delay, d127.725.121.518.911.126.823.0 Progression Factor0.520.601.011.101.911.001.00 Incremental Delay, d20.42.811.68.20.19.02.0 Delay (s)14.917.833.429.021.235.825.0 Level of ServiceBBCCCDC Approach Delay (s)17.629.835.825.0 Approach LOSBCDC Intersection Summary HCM Average Control Delay25.8HCM Level of ServiceC HCM Volume to Capacity ratio0.77 Actuated Cycle Length (s) 90.0Sum of lost time (s)8.0 Intersection Capacity Utilization76.8%ICU Level of ServiceD Analysis Period (min)15 c Critical Lane Group 9/3/2008Synchro 6 Report Page 2 TDI 2030 PM Peak Hour BuildCounty Road E Master Plan HCM Signalized Intersection Capacity Analysis 3: West County Road E & Pine Tree Drive MovementEBTEBRWBLWBTNBLNBR Lane Configurations Ideal Flow (vphpl)190019001900190019001900 Total Lost time (s)4.04.04.04.04.0 Lane Util. Factor0.951.000.951.001.00 Frt0.991.001.001.000.85 Flt Protected1.000.951.000.951.00 Satd. Flow (prot)35021770353917701583 Flt Permitted1.000.181.000.951.00 Satd. Flow (perm)3502330353917701583 Volume (vph)9207040810210100 Peak-hour factor, PHF0.920.920.920.920.920.92 Adj. Flow (vph)10007643880228109 RTOR Reduction (vph)5000078 Lane Group Flow (vph)107104388022831 Turn Typepm+ptPerm Protected Phases2168 Permitted Phases68 Actuated Green, G (s)44.956.055.526.026.0 Effective Green, g (s)45.456.056.026.026.0 Actuated g/C Ratio0.500.620.620.290.29 Clearance Time (s)4.54.04.54.04.0 Vehicle Extension (s)3.03.03.03.03.0 Lane Grp Cap (vph)17673112202511457 v/s Ratio Protc0.310.01c0.25c0.13 v/s Ratio Perm0.080.02 v/c Ratio0.610.140.400.450.07 Uniform Delay, d115.915.58.526.123.2 Progression Factor0.651.001.001.001.00 Incremental Delay, d21.10.20.52.80.3 Delay (s)11.315.79.128.923.5 Level of ServiceBBACC Approach Delay (s)11.39.427.2 Approach LOSBAC Intersection Summary HCM Average Control Delay12.9HCM Level of ServiceB HCM Volume to Capacity ratio0.52 Actuated Cycle Length (s) 90.0Sum of lost time (s)8.0 Intersection Capacity Utilization51.5%ICU Level of ServiceA Analysis Period (min)15 c Critical Lane Group 9/3/2008Synchro 6 Report Page 3 TDI 2030 PM Peak Hour BuildCounty Road E Master Plan HCM Signalized Intersection Capacity Analysis 5: West County Road E & Lexington Ave MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Total Lost time (s)4.04.04.04.04.04.04.04.0 Lane Util. Factor1.000.951.000.951.000.951.000.95 Frt1.000.961.000.951.000.991.000.94 Flt Protected0.951.000.951.000.951.000.951.00 Satd. Flow (prot)17703401177033701770349517703341 Flt Permitted0.181.000.351.000.131.000.281.00 Satd. Flow (perm)3273401655337024834955163341 Volume (vph)4605401906032015014065060240670400 Peak-hour factor, PHF0.920.920.920.920.920.920.920.920.920.920.920.92 Adj. Flow (vph)5005872076534816315270765261728435 RTOR Reduction (vph)029004600500740 Lane Group Flow (vph)5007650654650152767026110890 Turn Typepm+ptpm+ptpm+ptpm+pt Protected Phases74385216 Permitted Phases4826 Actuated Green, G (s)52.844.022.617.838.038.046.045.0 Effective Green, g (s)53.845.023.618.839.039.046.046.0 Actuated g/C Ratio0.450.370.200.160.320.320.380.38 Clearance Time (s)4.05.04.05.04.05.04.05.0 Vehicle Extension (s)3.03.03.03.03.03.03.03.0 Lane Grp Cap (vph)516126717252419311283631272 v/s Ratio Protc0.250.220.010.14c0.060.220.10c0.33 v/s Ratio Permc0.180.060.190.18 v/c Ratio0.970.600.380.890.790.680.720.86 Uniform Delay, d134.030.740.650.056.635.537.034.4 Progression Factor1.001.001.001.001.001.001.001.00 Incremental Delay, d231.40.81.416.618.83.36.77.5 Delay (s)65.431.542.066.675.438.843.741.9 Level of ServiceECDEEDDD Approach Delay (s)44.663.844.842.2 Approach LOSDEDD Intersection Summary HCM Average Control Delay46.5HCM Level of ServiceD HCM Volume to Capacity ratio0.90 Actuated Cycle Length (s) 120.8Sum of lost time (s)12.0 Intersection Capacity Utilization91.6%ICU Level of ServiceF Analysis Period (min)15 c Critical Lane Group 9/3/2008Synchro 6 Report Page 4 TDI 2030 PM Peak Hour BuildCounty Road E Master Plan HCM Unsignalized Intersection Capacity Analysis 4: West County Road E & Arden Plaza Driveway MovementEBTEBRWBLWBTNBLNBR Lane Configurations Sign ControlFreeFreeStop Grade0%0%0% Volume (veh/h)110080807806090 Peak Hour Factor0.920.920.920.920.920.92 Hourly flow rate (vph)119687878486598 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh)1 Median typeNone Median storage veh) Upstream signal (ft)900464 pX, platoon unblocked0.810.840.81 vC, conflicting volume12831837641 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol11121595318 tC, single (s)4.16.86.9 tC, 2 stage (s) tF (s)2.23.53.3 p0 queue free %83382 cM capacity (veh/h)50468547 Direction, Lane #EB 1EB 2WB 1WB 2WB 3NB 1 Volume Total79748687424424163 Volume Left00870065 Volume Right08700098 cSH1700170050417001700148 Volume to Capacity0.470.290.170.250.251.10 Queue Length 95th (ft)001500221 Control Delay (s)0.00.013.60.00.0164.9 Lane LOSBF Approach Delay (s)0.01.3164.9 Approach LOSF Intersection Summary Average Delay 11.8 Intersection Capacity Utilization 50.7%ICU Level of Service A Analysis Period (min)15 9/3/2008Synchro 6 Report Page 1 TDI 2030 PM Peak Hour BuildCounty Road E Master Plan HCM Unsignalized Intersection Capacity Analysis 6: Harriet Ave & Lexington Ave MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Sign ControlStopStopFreeFree Grade0%0%0%0% Volume (veh/h)100601002040770203088030 Peak Hour Factor0.920.920.920.920.920.920.920.920.920.920.920.92 Hourly flow rate (vph)110651102243837223395733 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNoneNone Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume1984198497320221989848989859 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol1984198497320221989848989859 tC, single (s)7.16.56.27.16.56.24.14.1 tC, 2 stage (s) tF (s)3.54.03.33.54.03.32.22.2 p0 queue free %731007965100949496 cM capacity (veh/h)40553063155361699782 Direction, Lane #EB 1WB 1NB 1NB 2SB 1SB 2 Volume Total76334385933989 Volume Left1111430330 Volume Right6522022033 cSH1568069917007821700 Volume to Capacity0.490.410.060.510.040.58 Queue Length 95th (ft)58415030 Control Delay (s)48.178.110.50.09.80.0 Lane LOSEFBA Approach Delay (s)48.178.10.50.3 Approach LOSEF Intersection Summary Average Delay 3.4 Intersection Capacity Utilization 59.4%ICU Level of Service B Analysis Period (min)15 9/3/2008Synchro 6 Report Page 2 TDI 2030 PM Peak Hour BuildCounty Road E Master Plan HCM Unsignalized Intersection Capacity Analysis 7: West County Road E & Holiday Inn Site MovementEBLEBTWBTWBRSBLSBR Lane Configurations Sign ControlFreeFreeStop Grade0%0%0% Volume (veh/h)209707905013040 Peak Hour Factor0.920.920.920.920.920.92 Hourly flow rate (vph)2210548595414143 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median typeNone Median storage veh) Upstream signal (ft)630734 pX, platoon unblocked0.990.800.99 vC, conflicting volume9131457457 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol9021285441 tC, single (s)4.16.86.9 tC, 2 stage (s) tF (s)2.23.53.3 p0 queue free %97092 cM capacity (veh/h)742122559 Direction, Lane #EB 1EB 2EB 3WB 1WB 2SB 1 Volume Total22527527572341185 Volume Left220000141 Volume Right00005443 cSH7421700170017001700149 Volume to Capacity0.030.310.310.340.201.24 Queue Length 95th (ft)20000271 Control Delay (s)10.00.00.00.00.0210.1 Lane LOSAF Approach Delay (s)0.20.0210.1 Approach LOSF Intersection Summary Average Delay 18.0 Intersection Capacity Utilization 43.1%ICU Level of Service A Analysis Period (min)15 9/3/2008Synchro 6 Report Page 3 TDI 2030 PM Peak Hour Build MITIGATEDCounty Road E Master Plan HCM Signalized Intersection Capacity Analysis 7: West County Road E & Holiday Inn Site MovementEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR Lane Configurations Ideal Flow (vphpl)190019001900190019001900190019001900190019001900 Total Lost time (s)4.04.04.04.04.04.04.04.0 Lane Util. Factor1.000.951.000.951.001.001.001.00 Frt1.000.991.000.991.000.871.000.88 Flt Protected0.951.000.951.000.951.000.951.00 Satd. Flow (prot)17703499177035081770161217701640 Flt Permitted0.301.000.101.000.721.000.691.00 Satd. Flow (perm)551349919135081345161212791640 Volume (vph)209708080790506010901301040 Peak-hour factor, PHF0.920.920.920.920.920.920.920.920.920.920.920.92 Adj. Flow (vph)2210548787859546511981411143 RTOR Reduction (vph)07005006600290 Lane Group Flow (vph)221134087908065430141250 Turn Typepm+ptpm+ptPermPerm Protected Phases743826 Permitted Phases4826 Actuated Green, G (s)42.441.944.844.829.429.429.429.4 Effective Green, g (s)42.442.445.345.329.429.429.429.4 Actuated g/C Ratio0.470.470.500.500.330.330.330.33 Clearance Time (s)4.04.54.04.54.04.04.04.0 Vehicle Extension (s)3.03.03.03.03.03.03.03.0 Lane Grp Cap (vph)30416482051766439527418536 v/s Ratio Prot0.00c0.320.03c0.260.030.02 v/s Ratio Perm0.030.180.05c0.11 v/c Ratio0.070.690.420.510.150.080.340.05 Uniform Delay, d114.218.615.515.021.421.022.920.7 Progression Factor0.380.530.450.481.001.001.001.00 Incremental Delay, d20.11.00.80.20.70.30.50.0 Delay (s)5.511.07.97.422.221.323.420.8 Level of ServiceABAACCCC Approach Delay (s)10.97.521.622.7 Approach LOSBACC Intersection Summary HCM Average Control Delay11.2HCM Level of ServiceB HCM Volume to Capacity ratio0.55 Actuated Cycle Length (s) 90.0Sum of lost time (s)12.0 Intersection Capacity Utilization57.7%ICU Level of ServiceB Analysis Period (min)15 c Critical Lane Group 9/3/2008Synchro 6 Report Page 1 TDI