Loading...
HomeMy WebLinkAboutAgenda Mayor : Address: Stan Harpstead 1245 West Highway 96 Arden Hills MN 55112 Councilmembers: David Grant Phone: Brenda Holden Agenda 651.792.7800 Fran Holmes David McClung Website: October7, 2008 www.ci.arden-hills.mn.us SpecialCity Council Meeting–7:30a.m. City Vision A strong community that values our unique environment, our fiscal soundness, and our tradition as a desirable city in which to live, work, and play. CALL TO ORDER 1.APPROVAL OF AGENDA 2.NEW BUSINESS Motion to Amend the Contract with A.J. Spanjers Company, Inc and Wiss, Janey, A. Elstner for the Masonry Façade Repair Project at City Hall for a Revised Total Amount Not to Exceed $308,372.50. ADJOURN Request for Council Action Prepared By:Dave Scherbel, Building OfficialCouncil Meeting Date:October 7, 2008 Masonry Façade Repairs Project Budgeted Amount:Actual Amount:Funding Source: $244,790.00$ TBDEquipment Building and Replacement Fund Recommendation: Motion to Amend the Contract with A.J. Spanjers Company, Inc and Wiss, Janey, Elstner for the Masonry Façade Repair Project at City Hall for a Revised Total Amount Not to Exceed $308,372.50. Supporting Documents: 1.October6, 2008, Memo to the City Council 2.WJE’sreport detailing additional work MEMORANDUM Agenda Item 1.A DATE: October 6, 2008 TO: Mayor and City Council, Ron Moorse,City Administrator FROM: Dave Scherbel,Building Official SUBJECT: MasonryFaçadeRepairs Project CC: James Lehnhoff,Community Development Director Background On March 31, 2008, the City Council approved an amount not to exceed $244,790.00 for the exterior repairs on the City Hall building. Of the approved amount, $23,000.00 was for Wiss, Janey, Elstner (WJE), the project engineer. The remaining $221,790 was to A.J.Spanjers (AJS) the masonry contractor. The approved amount included a $41,700 contingency for additional repairs that could be used as needed during the project. In the course of their work, the contractor and engineer haveencounteredadditionalissues related to the current project and additional concernsthat were not anticipated but need to be addressed. Due to the additional unforeseen issues,thetotalcost of the repairs will exceed the approved contingency. The City’s hired engineer has submitted the estimated costs for the additional repairs.The estimates are divided into threeparts (see attachment for more detail): x Items 1 and 4 are additional costs related to the repairs already started and are needed to complete the current repairproject.Cost: $32,482.50 x Items 2 and 3 are unanticipated issues that were discovered during the course of this repair project but are recommended by the City’s hired engineer.Cost: $65,000 x Additional investigation and engineering.Cost: $8,000 \\Ahdocs1\ah\AHdata\Building\City Hall\Masonry Facade repairs\100608- CC Report - Masonry Facade repair.doc 1 Including engineering and inspections, the total cost of the additional repairs is $105,482.50, which is $63,782.50 more than the approved contingency. Items 1 and 4 can be completed without additional Council action because they can be covered by the existing contingency. However,items 2 and 3 will cause the project to exceed the approved cost and contingency. If the repairs for items 3 are delayed to 2009, AJS states that the cost would increase by $2,500. TheCity’s buildingofficial, Dave Scherbel, and the project engineer from WJE, Brian Pashina, will be in attendance to discuss the reason, cost, timing, pros, and cons of the additional repairs. Mr. Scherbel is reviewing the project to determine if other options are available that may help lower the cost. Finally,this project is sensitive to the weather, and the contractor has expressed concern regarding the application of a cleaning agent on the masonry once the area has been completed. In order for the product to work correctly, the surface temperature needs to be above 50 degrees. If the repairs described in items 2 and 3 are to move forward in 2008, approval is needed as soon as possible to ensure that work can be completed before the weather changes. FinancialImplications Funding for this project is availablefromtheEquipment Building and Replacement Fund.This fund was established during the 2008 budgeting process and City Hall repairs were budgeted in the 2008-2012 CapitalImprovement plan from this fund.The City will be utilizing funds received from the mediation settlement. Requested Action If the repairs described items 2 and 3 are approved, the motion would be as follows: Motion to Amend the Contract with A.J. Spanjers Company, Inc and Wiss, Janey, Elstner for the Masonry Façade Repair Project at City Hall for a Revised Total Amount Not to Exceed $308,372.50. \\Ahdocs1\ah\AHdata\Building\City Hall\Masonry Facade repairs\100608- CC Report - Masonry Facade repair.doc 2