MEMORANDUM
DATE: August 13, 2009 Item LC
TO: Mayor and Council Members
FROM: Ron Moorse, City Administrator
Sue Iverson, Finance Director/Treasurer
SUBJECT: 2010-2014 Capital Improvement Plan
The August 17, 2009 work session will be an opportunity for additional discussion regarding the
2010-2014 Capital Improvement Plan (CIP). Updated project sheets and summaries reflecting
the Council's CIP discussions at previous work sessions are attached as requested as well as the
2009 Capital Budget. In addition, a memo from Bolton and Menk regarding additional cost
information related to the CP Rail Bridge Trail is attached. Also, maps showing the PMP
projects budgeted for each year of the CIP will be provided at the work session.
Project Name
2009
Gateway Signs
Office Expansion
Lexington Avenue Trail
Cummings Park Irrigation
Hazelnut Outfield Fence
❑NR Trail Connection Grant
Safe Routes to School Grant
Lake Johanna Fire Dept Equipment
Lake Johanna Fire Dept Fire Station
Emergency Vehicle Premption (EVP)
Sanitary Sewer (1&[) Mitigation
Sewer Lining/Rehabilitation
2008 PMP (Ridgewood Asbury)
2009 PMP Glenarden Neighborhood
2010 PMP-Nursery Hill/Wyncrest
Storm Pond Maintenance
Erosion Correction on Old City Hail Trail
Technology and Office Equipment
Springbrook Software Upgrade
Repair/Repaint South Water Tower
County Road E Sidewalk Improvements (Bridge)
City of Arden Hills
Capital Improvement Plan
2009 thru 2013
PROJECTS BY YEAR
Department Project # Priority Project Cost
Economic Development
08-EDA-001
nla
10,000.00
Government Buildings
09-Bldg-003
n/a
42,000.00
Parks Department
09-Park-003
n/a
27,115.00
Parks Department
09-Park-004
n/a
16,000.00
Parks Department
09-Park-005
n/a
16,500.00
Parks Department
09-Park-006
n/a
56,250.00
Parks Department
09-Park-007
n/a
190,000.00
Public Safety
09-Pub-001
n/a
89,735.00
Public Safety
09-Pub-002
n/a
15,000.00
Public Safety
09-Pub-004
n/a
32,000,00
Sanitary Sewer Department
09-Sew-001
n/a
100,100.00
Sanitary Sewer Department
09-Sew-002
n/a
80,000.00
Street Department
08-Str-057
n/a
1,000.00
Street Department
09-Str-028
n/a
1,872,000.00
Street Department
10-Str-025
n/a
171,000.00
Surface Water Management Dept
09-Storm-001
n/a
50,000.00
Surface Water Management Dept
09-Storm-002
n/a
20,000.00
Technology
08-Tec-001
n/a
10,000.00
Technology
09-Tec-001
n/a
14,068.00
Water Department
09-W-002
n/a
55,140.00
Parks Department
10-Park-003
n/a
376,700.00
Total for 2009 3,244,608.00
City of Arden Hills, Minnesota
Capital Improvement Plan
2010 tnru 2014
PROJECTS BY YEAR
Project Name Department Project # Priority Project Cost
zalo
Gateway Signs
Economic Development
08-EDA-001
nla
10,000
City Trail Signage-Bench Implementation
Parks Department
09-Park-001
6
10,000
Safe Routes to School -Andersen Connections
Parks Department
09-Park-007
n1a
429,876
DNR Trail Connection - Elmer L. Andersen
Parks Department
10-Park-006
n1a
100,000
Old Highway 10 Sidewalk Improvements-CP Rail
Parks Department
10-Park-011
n1a
214,000
Lexington Avenue Trail
Parks Department
10-Park-030
nla
62,645
Lexington Ave Trail Resurfacing
Parks Department
12-Park-001
6
50,000
Lake Johanna Fire Dept Equipment
Public Safety
09-Pub-001
nla
76,496
Sanitary Sewer (I&I) Mitigation
Sanitary Sewer Department
09-Sew-001
n1a
100,100
Sewer LininglRehabilitation
Sanitary Sewer Department
09-Sew-002
n1a
125,000
Reconstruct Lift Stations 11 and 13
Sanitary Sewer Department
10-Sew-003
nla
375.000
Generator Building for Lift Station #8
Sanitary Sewer Department
10Sew-010
nla
50,000
Glenarden Neighborhood PMP (2009)
Street Department
09-Str-028
nla
98,250
Valentine Avenue Neighborhood PMP (2010)
Street Department
10-Str-037
n1a
714,000
Katie Lane Mill & Overlay (2010)
Street Department
10-StrM-058
n1a
144,000
Nursery HiIVWyncresVArden View PMP (2011)
Street Department
11-Str-025
n1a
162,500
Highway 96 (Old Highway 8 to US Highway 10)
Street Department
11-Str-055
nla
15,000
Snelling Avenue PMP (2012)
Street Department
12-Str-007
nla
80,000
Storm Pond Maintenance
Surface Water Management Dept
09-Storm-001
n1a
50,000
Surface Water Management Plan Update
Surface Water Management Dept
10-Storm-001
n1a
100,000
Technology and Office Equipment
Technology
08-Tec-001
nla
13,000
Springbrook Software Upgrade
Technology
09-Tec-001
nla
42,068
Total for 2010
3,021.936
2011
Gateway Signs
Economic Development
08-EDA-001
nla
10,000
Lake Johanna Fire Dept Equipment
Public Safety
09-Pub-001
n1a
87,160
Sanitary Sewer (MI) Mitigation
Sanitary Sewer Department
09-Sew-001
n1a
100,100
Sewer Lining/Rehabilitation
Sanitary Sewer Department
09-Sew-002
n1a
125,000
Sanitary Sewer Pipe & Access Road at LS #7
Sanitary Sewer Department
11-Sew-001
n1a
150,000
Valentine Avenue Neighborhood PMP (2010)
Street Department
10-Sfr-037
nla
45,000
Katie Lane Mill & Overlay (2010)
Street Department
10-SfrM-056
n1a
6,000
Regulatory Street Sign Replacement
Street Department
11-Sfr-001
nla
5,000
Nursery HillMyncrestlArden View PMP (2011)
Street Department
11-Sfr-025
nla
1,426,000
Highway 96 (Old Highway 8 to US Highway 10)
Street Department
11-Sfr-055
nla
335,000
Co Rd E Impr between Hwy 51 & Lexington Ave
Street Department
12-Sfr-060
n1a
300,000
Technology and Office Equipment
Technology
08-Tec-001
nla
13,000
Total for 2011
2,602,260
2012
Gateway Signs
Economic Development
08-EDA-001
nla
10,000
Lake Johanna Fire Dept Equipment
Public Safety
09-Pub-001
nla
176,309
Sewer Lining/Rehabilitation
Sanitary Sewer Department
09-Sew-002
nla
125,000
Produced Using the Plan -It Capital Planning Software Thursday, August 13, 2009
Project Name Department Project # Priority Project Cost
Install SCADA System
Sanitary Sewer Department
12-Sew-004
nla
200,000
Regulatory Street Sign Replacement
Street Department
11-Str-001
n1a.
10,000
Nursery HillMyncrestlArden View PMP (2011)
Street Department
11-Str-025
nla
81,500
Co Rd E Impr between Hwy 51 & Lexington Ave
Street Department
12-Str-060
n1a
2,200,000
2013 PMP Mill and Overlay
Street Department
13-StrM-062
n1a
125,000
Technology and Office Equipment
Technology
08-Tec-001
nla
13,000
Total for 2012 2,940,809
2013
Gateway Signs
Economic Development
08-EDA-001
nla
10,000
West Round Lake Trail
Parks Department
13-Park-001
n1a
120,000
County Road E Trail
Parks Department
13-Park-010
nla
348,100
County Road E Sidewalk Improvements (Bridge)
Parks Department
13-Park-011
nla
790,900
Lake Johanna Fire Dept Equipment
Public Safety
09-Pub-001
n1a
38,709
Sewer Lining/Rehabilitation
Sanitary Sewer Department
09-Sew-002
nla
125,000
Regulatory Street Sign Replacement
Street Department
11-Str-001
nla
5,000
2013 PMP Mill and Overlay
Street Department
13-StrM-062
n1a
1,062,500
Ridgewood Asbury PMP (2014)
Street Department
14-Str-064
n1a
171,000
Technology and Office Equipment
Technology
08-Tec-001
nta
13,000
Repair/Repaint South Water Tower
Water Department
09-W-002
n1a
500,000
Total for 2013
3,184,209
2014
Snelling Avenue Regional Trail
Parks Department
14-Park-008
nla
2,284,149
Lake Johanna Fire Dept Equipment
Public Safety
09-Pub-001
n1a
43,310
Reconstruct Lift Stations 1 and 12
Sanitary Sewer Department
14-Sew-001
n1a
400,000
Regulatory Street Sign Replacement
Street Department
11-Str-001
nla
5,000
2013 PMP Mill and Overlay
Street Department
13-StrM-062
n1a
62,500
Ridgewood Asbury PMP (2014)
Street Department
14-Str-064
nla
1,453,500
West Round Lake Road PMP (2015)
Street Department
15-Str-042
n1a
115,500
Technology and Office Equipment
Technology
08-Tec-001
n1a
13,000
Total for 2014
4,376,959
GRAND TOTAL
16,126,172
Produced Using the Plan -It Capital Planning Sofhvare Thursday, August 13, 2009
City of Arden Hills, Minnesota
Capital Improvement Plan
2010 thru 2014
PROJECTS BY YEAR
Project Name Department Project 0 Priority Project Cost
2010
Replace 1998 J. Deere Tractorw/Multi use machine Equipment 10-Eqp-001 nla 50,000
Replace Fleetside Pick-up One Ton wiHoist Equipment 10-EgpV-003 nla 66,400
Total for 2010 116,400
2011
Replace JetterTruck
Equipment
10-EgpV-004
n1a
175,000
Skid Steer Loader -Snow Blower
Equipment
II-Eqp-005
n1a
35,000
Total for 2011
210,000
2012
EMMMMMMENA
F-350 One Ton Truck WlDump & Plow
Equipment
10-EgpV-001
n1a
35,000
Brush Chipper
Equipment
II-Eqp-001
n1a
50,000
Toro GroundsmasterwiBroom
Equipment
II-Eqp-004
nla
38,000
Replace 1996 Roller
Equipment
II-Eqp-006
n1a
10,000
Replace 1997 Toro Workman wlSprayer
Equipment
12-Eqp-001
n1a
28,000
Replace J Type Tamper
Equipment
12-Eqp-004
nla
5,000
Replace 1997 Dump Truck w1Plow/Wing PlowlSander
Equipment
12-EgpV-002
nla
150,000
Replace F250 Pickup Truck with Mow
Equipment
12-EgpV-003
nla
35,000
Total for 2012
351,000
2013
Replace 2001 F450 One Ton Dump/Plow/Sander
Equipment
11-EgpV-002
nia
60,000
Replace 1997 Street Sweeper
Equipment
12-Eqp-002
nia
130,000
Replace 2002 Groundsmaster with Snow Blower
Equipment
12-Eqp-003
nla
3%000
Replace Trailer
Equipment
13-EgpV-010
nla
10,000
Total for 2013
239,000
2019
MONEEMEMMEMM
Replace 2002 F450 One -Ton w0umplPlowlSander
Equipment
12-EgpV-001
nla
60,000
Replace Turf Sweeper
Equipment
14-EgpV-005
1
18,000
Replace Pick up Truck#201
Equipment
14-EgpV-010
n1a
35,000
Total for 2014
113,000
GRAND TOTAL
1,029,400
Produced Using the Plan -It Capital Planning Software Thursday, August 13, 2009
City of Arden Hills, Minnesota
Capital Improvement Plan
2010 thru 2014
PROJECTS BY CATEGORY
Category Project# Priority 2010 2011 2012 2013 2014 Total
Economic Devl Improvement
Gateway Signs
08-EDA-001
n1a
10,000
10,000
10,000
10,000
40,000
Economic Devl Improvement Total
10,000
10,000
10,000
10,000
40,000
Equipment: Office
Technology and Office Equipment
08-Tec-001
n1a
13,000
13,000
13,000
13,000
13,000
65,000
Springbrook Software Upgrade
09-Tec-001
nla
42,068
42,066
Equipment: Office Total
55,068
13,000
13,000
13,000
13,000
107,068
�uipment: Public Works
Replace 1998 J. Deere TractorwlMulti use machine
10-Eqp-001
nla
50,000
50,000
Brush Chipper
11-Eqp-001
nla
50,000
50,000
Toro Groundsmasterw1Broom
11-Eqp-004
nla
38,000
38,000
Skid Steer Loader -Snow Blower
11-Eqp-005
nla
35,000
35,000
Replace 1996 Roller
11-Eqp-006
nla
10,000
10,000
Replace 1997 Toro Workman wlSprayer
12-Eqp-001
nla
28,000
28,000
Replace 1997 Street Sweeper
12-Eqp-002
n1a
130,000
130,000
Replace 2002 Groundsmaster with Snow Blower
12-Eqp-003
nla
39,000
39,000
Replace J Type Tamper
12-Eqp-004
n1a
5,000
5,000
Equipment: Public Works Total
50,000
35,000
131,000
169,000
385,000
Park Capital Improvements
City Trail Signage-Bench Implementation
09-Park-001
6
10,000
10,000
Safe Routes to School - Andersen Connections
09-Park-007
nla
429,876
429,876
DNR Trail Connection - Efiner L. Andersen
10-Park-006
n1a
100,000
100,000
Old Highway 10 Sidewalk Improvements-CP Rail
10-Park-011
nla
214,000
214,000
Lexington Avenue Trail
10-Park-030
n1a
62,645
62,645
Lexington Ave Trail Resurfacing
12-Park-001
6
50,000
50,000
West Round Lake Trail
13-Park-001
n1a
120.000
120,000
County Road E Trail
13-Park-010
n1a
348.100
348,100
County Road E Sidewalk Improvements (Bridge)
13-Park-011
nla
790,900
790,900
Snelling Avenue Regional Trail
14-Park-008
n1a
2,284,149
2,284,149
Park Capital Improvements Total
866,521
1,259,000
2,284,149
4,409,670
Produced Using the Plan -It Capital Planning Software Thursday, August 13, 2009
Category
Project#
Priority
2010
2011
2012
2013
2014
Total
Public Safety
Lake Johanna Fire Dept Equipment
09-Pub-001
nla
76,496
87,160
176,309
38,709
43,310
421,984
Public Safety Total
76,496
87,160
176,309
38,709
43,310
421,984
Streets: Mill & Overlay
Y
Katie Lane Mill & Overlay (2010)
10-StrM-058
nla
144,000
6,000
150,000
2013 PMP Mill and Overlay
13-StrM-062
nla
125,000
1,062,500
62,500
1,250,000
Streets: Mill & Overlay Total
144,000
6,000
125,000
1,062,500
62,500
1,400,000
Streets: Reconstruction
Glenarden Neighborhood PMP (2009)
09-Str-028
nla
98,250
98,250
Valentine Avenue Neighborhood PMP (2010)
10-Str-037
nla
714,000
45,000
759,000
Nursery Hill/WyncrestlArden View PMP (2011)
11-Str-025
nla
162,500
1,426,000
81,500
1,670,000
Highway 96 (Old Highway 8 to US Highway 10)
11-Str-055
nla
15,000
335.000
350,000
Snelling Avenue PMP (2012)
12-Str-007
nla
80,000
80,000
Co Rd E Impr between Hwy 51 & Lexington Ave
12-Str-060
nla
300,000
2,200,000
2,500,000
Ridgewood Asbury PMP (2014)
14-Str-064
nla
171,000
1,453,500
1,624,500
West Round Lake Road PMP (2015)
15Str-042
nla
115,500
115,500
Streets: Reconstruction Total
1,069,750
2,106,000
2,281,500
171,000
1,569,000
7,197,250
Streets•Misc
Regulatory Street Sign Replacement
11-Str-001
nla
5,000
10,000
5,000
5,000
25,000
Streets:Misc Total
5,000
10,000
5,000
5,000
25,000
Utility Improvements
Reconstruct Lift Stations 11 and 13
10-Sew-003
nla
375,000
375,000
Sanitary Sewer Pipe & Access Road at LS #7
11-Sew-001
nla
150,000
150,000
Install SCADA System
12-Sew-004
nla
200,000
200,000
Reconstruct Lift Stations 1 and 12
14-Sew-001
nla
400,000
400,000
Utility Improvements Total
375,000
150,000
200,000
400,000
1,125,000
Utility Maintenance
Sanitary Sewer (1&1) Mitigation
09-Sew-001
nla
100,100
100,100
200,200
Sewer Lining/Rehabilitation
09-Sew-002
nla
125,000
125,000
125,000
125,000
500,000
Storm Pond Maintenance
09-Storm-001
nla
50,000
50,000
Repair/Repaint South Water Tower
09-W-002
nla
500,000
500,000
Generator Building for Lift Station #8
10-Sew-010
nla
50,000
50,000
Surface Water Management Plan Update
10-Storm-001
nla
100,000
100,000
Utility Maintenance Total
425,100
225,100
125,000
625,000
1,400,200
Produced Using the Plan -It Capital Planning Software
Thursday, August 13, 2009
Category
Project# Priority 2010 2011 2012 2013 2014 Total
Vehicles
F-350 One Ton Truck WlDump & Plow
10-EgpV-001
nla
Replace Fleetside Pick-up One Ton wlHoist
10-EgpV-003
nla 66,400
Replace JetterTruck
10-EgpV-004
nla 175,000
Replace 2001 F450 One Ton DumplPlow/Sander
11-EgpV-0Q2
nla
Replace 2002 F450 One -Ton w/Dump/PlowlSander
12-EgpV-001
nla
Replace 1997 Dump Truck wlPlowMing Plow/Sander
12-EgpV-002
n1a
Replace F250 Pickup Truck with Plow
12-EgpV-003
nla
Replace Trailer
13-EgpV-010
nla
Replace Turf Sweeper
14-EgpV-005
1
Replace Pick up Truck #201
14-EgpV-010
nla
35,000 35,000
66,400
175,000
60,000 60,000
60,000 60,000
150,000 150,000
35,000 35,000
10,000 10,000
18,000 18,000
35,000 35,000
Vehicles Total
66,400
175,000
220,000
70,000
113,000
644,400
GRAND TOTAL
3,138,335
2,812,260
3,291,809
3,423,209
4,489,959
17,155,572
Produced Using the Plan -It Capital Planning Software Thursday, August 13, 2009
City Of Arden Hills, Minnesota
Capital Improvement Plan
2010 thru 2014
SOURCES AND USES OF FUNDS
Source
2010
2011
2012
2013
2014
[Capital Improvement Funds (PIR)
Beginning Balance
6,515,236
6,619,486
5,976,986
5,164,486
4,570,986
Revenues and Other Fund Sources
Revenue
Interest Income
225,000
200,000
200,000
200,000
200,000
Estimated Rev from Assessments
400,000
650,000
430,000
100,000
500,000
Total 625,000
850,000
630,000
300,000
700.000
Other Fund Sources
Transfer from General Fund
Total
Total Revenues and Other Fund Sources
Total Funds Available
Expenditures and Uses
Capital Projects & Equipment
Parks Department
Lexington Ave Trail Resurfacing
12-Park-001
Snelling Avenue Regional Trail
14-Park-008
Total
Street Department
Glenarden Neighborhood PMP (2009)
09-Str-028
Valentine Avenue Neighborhood PMP (2010)
10-Str-037
Katie Lane Mill & Overlay (2010)
10-StrM-058
Regulatory Street Sign Replacement
11-Str-001
Nursery HilllWyncresYArden View PMP (2011)
11-Str-025
Highway 96 (Old Highway 8 to US Highway 10)
11-Str-055
Snelling Avenue PMP (2012)
12-Str-007
Go Rd E Impr between Hwy 51 & Lexington Ave
12-Str-060
2013 PMP Mill and Overlay
13-StrM-062
Ridgewood Asbury PMP (2014)
14-Str-064
Total
Total Expenditures and Uses
200,000 200,000 200,000 200,000 0
200,000
200,000
200,000
200,000
0
825,000
1,050,000
830,000
500,000
700.000
7,340,236
7,669,486
6,806,986
5,664,486
5,2703986
(50,000) 0 0 0 0
0 0 0 0 (2,284,149)
(50,000)
0
0
0
(2,284,149)
(77, 750)
0
0
0
0
(246,000)
(34,000)
0
0
0
(144,000)
(6,000)
0
0
0
0
(5,000)
(10, 000)
(5,000)
(5,000)
(135,000)
(1,147,500)
(67,500)
0
0
(10,000)
(300,000)
0
0
0
(58,000)
0
0
0
0
0
(200,000)
(1,450,000)
0
0
0
0
(115,000)
(977,500)
(57,500)
0
0
0
(111,000)
(943,500)
(670,750) (1,692,500) (1,642,500) (1,093,500) (1,006,000)
(720,750) (1,692,500) (1,642,500) (1,093,500) (3,290,149)
Produced Using the Plan -It Capital Planning Software Thursday, August 13, 2009
Change in Fund Balance
104,250
(642,500)
(812,500)
(593,500)
(2,590,149)
Ending Balance
6,619,486
5,976,986
5,164,486
4,570,986
1,980,837
Source
2010
2011
2012
2013
2014
Donations
Beginning Balance
0
(30,000)
(30,000)
(30,000)
(30,000)
Revenues and Other Fund Sources
No Funds
0
0
0
0
0
Total Revenues and Other Fund Sources
Total Funds Available
Expenditures and Uses
Capital Projects & Equipment
Parks Department
Lexington Avenue Trail
Total Expenditures and Uses
Change in Fund Balance
Ending Balance
Total 0 0
0
0
0
0 0
0
0
0
0 (30,000)
(30,000)
(30,000)
(30,000)
10-Park-030 (30,000) 0 0 0 0
Total (30.000) 0 0 0 0
(30,000) 0 0 0 0
(30,000) 0 0 0 0
(30,000) (30,000) (30,000) (30,000) (30,000)
Produced Using the Plan -It Capital Planning Software Thursday, August 13, 2009
Source
EDA Revenues
Beginning Balance
Revenues and Other Fund Sources
Revenue
Excess Tax Revenue
Other Fund Sources
Transfer from General Fund
Total Revenues and Other Fund Sources
Total Funds Available
Expenditures and Uses
Capital Projects & equipment
Economic Development
Gateway Signs
Total Expenditures and Uses
Change in Fund Balance
Ending Balance
2010 2011 2012 2013 2014
(8,969) 1,031 11,031 21,031 31,031
5,000 5,000 5,000 5,000 5,000
Total 5,000
5,000
5,000
5,000
5,000
15,000
15, 000
15,000
15,000
15,000
Total 15,000
15,000
15,000
15,000
15,000
20,000
20,000
20,000
20,000
20,000
11,031
21,031
31,031
41,031
51,031
08-EDA-001
Total
(10,000) (10,000) (10,000) (10,000) 0
(10,000)
(10,000)
(10,000)
(10,000)
0
(10,000)
(10,000)
(10,000)
(10,000)
0
10,000
10,000
10,000
10,000
20,000
1,031
11,031
21,031
31,031
51,031
Produced Using the Plan -It Capital Planning Software Thursday, August 13, 2009
Source
2010 2011 2012 2013 2014
Equipment/Building Replacement
Beginning Balance
Revenues and Other Fund Sources
Revenue
Interest Income
Other Fund Sources
Transfer from General Fund
Transfer from Sanitary Sewer Fund
Transfer from Surface Water Fund
Transfer from Water Fund
202,212 233,744 213,744 52,744 3,744
10,000
10,000
10,000
10,000
10,000
Total 10,000
10,000
10,000
10,000
10,000
50,000
50,000
50,000
50,000
50,000
62,000
62,000
62,000
62,000
62,000
38,000
38,000
38,000
38,000
38,000
43,000
43,000
43,000
43,000
43,000
Total
Total Revenues and Other Fund Sources
Total Funds Available
Expenditures and Uses
Capital Projects & Equipment
Equipment
Replace 1998 J. Deere Tractor wlMulti use machin
10-Eqp-001
F-350 One Ton Truck W1Dump & Plow
10-EgpV-001
Replace Fleetside Pick-up One Ton wlHolst
10-EgpV-003
Replace Jetter Truck
10-EgpV-004
Brush Chipper
11-Eqp-001
Toro Groundsmaster wlBroom
11-Eqp-004
Skid Steer Loader -Snow Slower
11-Eqp-005
Replace 1996 Roller
11-Eqp-006
Replace 2001 F450 One Ton Dump/Plow/Sander
11-EgpV-002
Replace 1997 Toro Workman wlSprayer
12-Eqp-001
Replace 1997 Street Sweeper
12-Eqp-002
Replace 2002 Groundsmaster with Snow Blower
12-Eqp-003
Replace J Type Tamper
12-Eqp-004
Replace 2002 F450 One -Ton w1DumplPlowlSande
12-EgpV-001
Replace 1997 Dump Truck wlPlowMing PlowlSan
12-EgpV-002
Replace F250 Pickup Truck with Plow
12-EgpV-003
Replace Trailer
13-EgpV-010
Replace Turf Sweeper
14-EgpV-005
Replace Pick up Truck #201
14-EgpV-010
Total
Technologv
Technology and Office Equipment
08-Tec-001
Springbrook Software Upgrade
09-Tec-001
Total
193,000
193,000
193,000
193,000
193,000
203,000
203,000
203,000
203.000
203,000
405,212
436,744
416,744
255,744
206,744
(50, 000)
0
0
0
0
0
0
(35,000)
0
0
(66,400)
0
0
0
0
0
(175,000)
0
0
0
0
0
(50,000)
0
0
0
0
(38,000)
0
0
0
(35,000)
0
0
0
0
0
(10,000)
0
0
0
0
0
(60,000)
0
0
0
(28, 000)
0
0
0
0
0
(130,000)
0
0
0
0
(39,000)
0
0
0
(5,000)
0
0
0
0
0
0
(60,000)
0
0
(150, 000)
0
0
0
0
(35,000)
0
0
0
0
0
(10,000)
0
0
0
0
0
(18,000)
0
0
0
0
(35,000)
(116,400)
(210,000)
(351,000)
(239,000)
(113,000)
(13,000)
(13,000)
(13,000)
(13,000)
(13,000)
(42,068)
0
0
0
0
(55,068)
(13,000)
(13,000)
(13.000)
(13,000)
Produced Using the Plan -It Capital Planning Software
Thursday, August 13, 2009
Total Expenditures and Uses
Change in Fund Balance
Ending Balance
Source
Grant Revenue
Beginning Balance
Expenditures and Uses
Capital Projects & Equipment
Parks Department
Safe Routes to School - Andersen Connections 09-Park-007
DNR Trail Connection - Elmer L. Andersen 10-Park-006
County Road E Trail 13-Park-010
County Road E Sidewalk Improvements (Bridge) 13-Park-011
Total
Total Expenditures and Uses
Change in Fund Balance
Ending Balance
(171,468)
(223,000)
(364,000)
(252,000)
(126,000)
31,532
(20,000)
(161,000)
(49,000)
77,000
233,744 213,744 52,744 3,744 80,744
2010 2011 2012 2013 2014
0 (487,326) (487,326) (487,326) (1,328,046)
(03,076) 0 0 0 0
(74,250) 0 0 0 0
0 0 0 (256,000) 0
0 0 0 (584, 720) 0
(487,326) 0 0 (840,720) 0
(487,326) 0 0 (840,720) 0
(487,326) 0 0 (840,720) 0
(487,326) (487,326) (487,326) (1,328,046) (1,328,046)
Produced Using the Plan -It Capita! Planning Software Thursday, August 13, 2009
Source
2010 2011 2012 2013 2014
Public Safety Capital Fund
Beginning Balance
Revenues and Other Fund Sources
Revenue
Interest Rev
Other Fund Sources
Transfer from Community Sery Fund
Total Revenues and Other Fund Sources
Total Funds Available
Expenditures and Uses
Capital Projects & Equipment
Public Safety
Lake Johanna Fire Dept Equipment
Total Expenditures and Uses
Change in Fund Balance
Ending Balance
586,972 580,476 563,316 457,007 468,298
20,000 20,000 20,000 0 20,000
Total 20,000
20,000
20,000
0
20,000
50,000
50,000
50,000
50,000
50,000
Total 50,000
50,000
50,000
50,000
50,000
70,000
70,000
70,000
50,000
70,000
656,972
650,476
633,316
507,007
538,298
09-Pub-001 (76,496)
(87,160)
(176,309)
{38,709)
(43,310)
Total (76,496)
(87,160)
(176,309)
(38,709)
(43,310)
(76,496)
(87,160)
(176,309)
(38,709)
(43,310)
(6,496)
(17,160)
(106,309)
11,291
26,690
580,476 563,316 457,007 468,298 494,988
Produced Using the Plan -It Capital Planning Software Thursday, August 13, 2009
Source
2010 2011 2012 2013 2014
Ramsey Co Donation —�
Beginning Balance
0
(16,800)
(16,800)
(16,800)
(16,800)
Revenues and Other Fund Sources
No Funds
0
0
0
0
0
Total
0
0
0
0
0
Total Revenues and Other Fund Sources
0
0
0
0
0
Total Funds Available
0
(16,800)
(16,800)
(16,800)
(16,800)
Expenditures and Uses
Capital Projects & Equipment
Parks Department
Safe Routes to School -Andersen Connections 09-Park-007
(16,800)
0
0
0
0
Total
(16,800)
0
0
0
0
Total Expenditures and Uses
(16,800)
0
0
0
0
Change in Fund Balance
(16,800)
0
0
0
0
Ending Balance
(16,800)
(16,800)
(16,800)
(16,800)
(16,800)
Source
2010
2011
2012
2013
2014
Ramsey County-CSAH
Beginning Balance
0
0
0
0
0
Revenues and Other Fund Sources
No Funds
0
0
0
0
0
Total
0
0
0
0
0
Total Revenues and Other Fund Sources
0
0
0
0
0
Total Funds Available
0
0
0
0
0
Change in Fund Balance
0
0
0
0
0
Ending Balance
0
0
0
0
0
Produced Using the Plan -it Capital Planning Software Thursday, August 13, 2009
Source 2010 2011 2012 2013 2014
Sanitary Sewer Utility Fund
Beginning Balance 0 (512,204) (670,177) (912,319) (891,567)
Revenues and Other Fund Sources
Revenue
Operating Revenue 1.643,251 1.818.673 1.856.739 1.904.087 i 932399
Total
Total Revenues and Other Fund Sources
Total Funds Available
Expenditures and Uses
Capital Projects & Equipment
Sanita Sewer Department
Sanitary Sewer (I&I) Mitigation
09-Sew-001
Sewer Lining/Rehabilitation
09-Sew-002
Reconstruct Lift Stations 11 and 13
10-Sew-003
Generator Building for Lift Station #8
10-Sew-010
Sanitary Sewer Pipe & Access Road at LS #7
11-Sew-001
Install SCADA System
12-Sew-004
Reconstruct Lift Stations 1 and 12
14-Sew-001
Total
Street Deoartment
Glenarden Neighborhood PMP (2009)
09-Str-028
Valentine Avenue Neighborhood PMP (2010)
10-Str-037
Nursery HiIIIWyncrestlArden View PMP (2011)
11-Str-025
Snelling Avenue PMP (2012)
12-Str-007
Ca Rd E Impr between Hwy 51 & Lexington Ave
12-S1r--060
2013 PMP Mill and Overlay
13-StrM-062
Ridgewood Asbury PMP (2014)
14-Str-064
Total
Other Uses
Operating Expenses
1,643,251
1,818,673
1,856.739
1,904,087
1,932,399
1,643,251
1,818, 673
1,856,739
1,904,087
1,932,399
1,643,251
1,306,469
1,186,562
991,768
1,040,832
(100,100)
(100,100)
0
0
0
(125,000)
(125,000)
(125,000)
(125,000)
0
(375,000)
0
0
0
0
(50, 000)
0
0
0
0
0
(150,000)
0
0
0
0
0
(175,000)
0
0
0
0
0
0
(400,000)
(650,100)
(375,100)
(300,000)
(125,000)
(400,000)
(2,000)
0
0
0
0
(16,000)
(1,000)
0
0
0
(1,500)
(17,500)
(1,000)
0
0
(1,000)
0
0
0
0
0
(20,000)
(150,000)
0
0
0
0
(2,500)
(21,250)
(1,250)
0
0
0
(5,000)
(42,500)
(20.500) (38,500) (153,500) (26,260) (43,750)
(1,484,855) (1,563,046) (1,645,381) (1,732,065) (1,823,391)
Total (1,484,865) (1,563,046) (1,645,381) (1,732,085) (1,823,391)
Total Expenditures and Uses (2,155,455) (1,976,646) (2,098,881) (1,883,335) (2,267,141)
Change in Fund .Balance (512,204) (157,973) (242,142) 20,752 (334,742)
Ending Balance (512,204) (670,177) (912,319) (B91,567) (1,226,309)
Produced Using the Plan -It Capital Planning Software nursday, August 13, 2009
Source
2010 2011 2012 2013 2014
Special Revenue Park Fund
Beginning Balance
Revenues and Other Fund Sources
Revenue
Interest Revenue
(121,540) (214,935) (209,935) (204,935) (408,035)
5,000
5,000
5,000
5,000
5,000
Total 5,000
5,000
5,000
5,000
5,000
Total Revenues and Other Fund Sources 5,000 5,000 5,000 5,000 5,000
Total Funds Available (116,540) (209,935) (204,935) (199,935) (403,035)
Expenditures and Uses
Capital Projects & Equipment
Parks Department
City Trail Sig nage-Bench Implementation
09-Park-001
(10,000)
DNR Trail Connection - Elmer L. Andersen
10-Park-006
(25, 750)
Old Highway 10 Sidewalk Improvements-CP Ralf
10-Park-011
{30,000)
Lexington Avenue Trail
10-Park-030
(32,645)
West Round Lake Trail
13-Park-001
0
County Road E Trail
13-Park-010
0
County Road E Sidewalk Improvements (Bridge)
13-Park-011
0
Total
(98,395)
Total Expenditures and Uses
(98,395)
Change in Fund Balance
(93,395)
Ending Balance
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
(120,000) 0
0 0
(28,100) 0
0 0
(60,000) 0
0 0 (208,100) 0
0 0 (208,100) 0
5,000 5,000 (203,100) 5,000
(214,935) (209,935) (204,935) (408,035) (403,035)
Produced Using the Plan -It Capital Planning Software Thursday, August 13, 2009
Source 2010 2011 2012 2013 2014
State Aid Funds
Beginning Balance 692,565 398,641 588,717 778,793 758,689
Revenues and Other Fund Sources
Revenue
Est Rev 190.076 190.076 190.076 190076 190 07fi
Total
Total Revenues and Other Fund Sources
Total Funds Available
Expenditures and Uses
Capital Projects & Equipment
Parks Department
Old Highway 10 Sidewalk Improvements-CP Rail
10-Park-011
County Road E Trail
13-Park-010
County Road E Sidewalk Improvements (Bridge)
13-Park-011
Total
Street Department
Valentine Avenue Neighborhood PMP (2010)
10-Str-037
Total
'.total Expenditures and Uses
Change in Fund Balance
Ending Balance
190,076
190,076
190,076
190,076
190,076
190,076
190,076
190,076
190,076
190,076
882,641
588,717
778,793
968,869
948,765
(184,000)
0
0
0
0
0
0
0
(64, 000)
0
0
0
0
(146,180)
0
(184,000)
0
0
(210,180)
0
(300,000)
0
0
0
0
(300,000)
0
0
0
0
(484,000)
0
0
(210,180)
0
(293,924)
190,076
190,076
(20,104)
190,076
398,641
588,717
778,793
758,689
948,765
Produced Using the Plan -It Capital Planning Softivare
Thursday, August 13, 2009
Source
Surface Water Mgmt Utility Funds
Beginning Balance
Revenues and Other Fund Sources
Revenue
Operating Rev
Total
Total Revenues and Other Fund Sources
Total Funds Available
Expenditures and Uses
Capital Projects & Equipment
Street Department
Glenarden Neighborhood PMP (2009)
09-Str-028
Valentine Avenue Neighborhood PMP (2010)
10-Str-037
Nursery HillMfynoresVArden View PMP (2011)
11-Str-025
Highway 96 (Old Highway 8 to US Highway 10)
11-Str-055
Snelling Avenue PMP (2012)
12-Str-007
Ca Rd E Impr between Hwy 51 & Lexington Ave
12-Str-060
2013 PMP Mill and Overlay
13-StrM-062
Ridgewood Asbury PMP (2014)
14-Str-064
Total
Surface Water Management Dept
Storm Pond Maintenance
09-Storm-001
Surface Water Management Plan Update
10-Storm-001
Total
Other Uses
Operating Expenses
2010 2011 2012 2013 2014
194,903 55,897 114,491 106,032 386,444
510,021 525,322 662,919 703,405 728,025
510,021
525,322
682,919
703,405
728,025
510,021
525,322
682,919
703,405
728,025
704,924
581,219
797,410
809,437
1,114,469
(17, 500)
0
0
0
0
(140,000)
(9,000)
0
0
0
(6,000)
(51,000)
(3,000)
0
0
(5,000)
(35,000)
0
0
0
(20,000)
0
0
0
0
0
(50,000)
(350,000)
0
0
0
0
(5,000)
(42,500)
(2,500)
0
0
0
(35,000)
(297,500)
(188,500)
(145,000)
(358,000)
(77,500)
(300,000)
(50,000)
0
0
0
0
(100,000)
0
0
0
0
(150,000)
0
0
0
0
(310,527)
(321,728)
(333,378)
(345,493)
(355,858)
Total (310,527) (321,728) (333,378) (345,493) (355,858)
Total Expenditures and Uses (649,027) (466,728) (691,378) (422,993) (655,858)
Change in Fund Balance
(139,006)
58,594
(8,459)
280,412
72,167
Ending Balance
55,897
114,491
106,032
386,444
458,611
Produced Using the Plan -It Capital Planning Software Thursday, August 13, 2009
Source 2010 2011 2012 2013 2014
TIF District
Beginning Balance 906,939 1,072,935 1,238,931 1,404,927 1,670,923
Revenues and Other Fund Sources
Revenue
Est Rev 165.996 165.996 165.996 165.996 165.996
Total
165,996
165,996
165.996
165,996
165,996
Total Revenues and Other Fund Sources
165,996
165,996
165,996
165,996
165,996
Total Funds Available
1,072,935
1,238,931
1,404,927
1,570,923
1,736,919
Expenditures and Uses
Capital Projects & Equipment
Street Department
West Round Lake Road PMP (2015) 15-Str-042
0
0
0
0
(115,500)
Total
0
0
0
0
(115,500)
Total Expenditures and Uses
0
0
0
0
(115,500)
Change in Fund Balance
165,996
165,996
165,996
165,996
50,496
Ending Balance
1,072,935
1,238,931
1,404,927
1,570,923
1,621,419
Produced Using the Plan -It Capital Planning Softivare Thursday, August 13, 2009
Source
2010 2011 2012 2013 2014
Water Utility Funds
Beginning Balance
Revenues and Other Fund Sources
.Revenue
Operating Rev
Total
Total Revenues and Other Fund Sources
Total Funds Available
Expenditures and Uses
Capital Projects & Equipment
Sanitary Sewer Department
Install SCADA System
12-Sew-004
Total
Street Department
Glenarden Neighborhood PMP (2009)
09•Str-028
Valentine Avenue Neighborhood PMP (2010)
10-Str-037
Nursery Hill[WyncresVArden View PMP (2011)
11-Str-025
Snelling Avenue PMP (2012)
12-Str-007
Co Rd E Impr between Hwy 51 & Lexington Ave
12-Str-060
2013 PMP Mill and Overlay
13-StrM-062
Ridgewood Asbury PMP (2014)
14-Str-064
Total
Water_ Department
Repair/Repaint South Water Tower
09-W-002
Total
Other Uses
Operating Exp
Total Expenditures and Uses
Change in Fund Balance
Ending Balance
247,752 50,116 (347,449) (761,048) (1,407,424)
1,667,835
1,769,749
1,899,995
2,025,946
2,170,644
1,667,835
1,769,749
1,899,995
2,025,946
2,170,644
1,667,835
1,769,749
1,899,995
2,025.946
2,170,644
1,915,587
1,819,865
1,552,546
1,264,898
763,220
0 0 (25,000) 0 0
0 0 (25,000) 0 0
(1,000)
0
0
0
0
(12,000)
(1,000)
0
0
0
(20,000)
(210,000)
(10,000)
0
0
(1,000)
0
0
0
0
0
(30,000)
(250,000)
0
0
0
0
(2,500)
(21,250)
(1,250)
0
0
0
(20,000)
(170,000)
(34,000)
(241,000)
(262,500)
(41,250)
(171,250)
0
0
0
(500,000)
0
0
0
0
(500,000)
0
(1,831,471)
(1,926,314)
(2,026,094)
(2,131,072)
(2,241,519)
Total (1,831,471) (1,926,314) (2,026,094) (2,131,072) (2,241,519)
(1,865,471) (2,167,314) (2,313,594) (2,672,322) (2,412,769)
(197,636) (397,565) (413,599) (646,376) (242,125)
50,116 (347,449) (761,048) (1,407,424) (1,649,549)
Produced Using the Plan -It Capital Planning Software Thursday, August 13, 2009
Capital Improvement Plan 2010 thru 2014
City of Arden Hills, Minnesota
Project# 12-Str-007
Project Name Snelling Avenue PW (2012)
Contact Engineer
Department Street Department
Type Improvement
Useful Life
Category Streets: Reconstruction
Priority nla
Total Project Cost $2,130,000
Description
Fhe existing roadway has a minimal storm water management system in place. Records indicate that Snelling Avenue was crack sealed and seal
:oated in 1996. City staff will televise the utility lines to determine the extent of any necessary repairs.
Ave, Cummings Ln, Hamlin (Co Rd E - Dead end)
Residential Equivalent Units: 37
2005 AADT: 1650
Justification
Records indicate Snelling Avenue was crack sealed and sealcoated in 1996, The existing roadway currently has a minimal storm water management
system in place.
Snelling from TH51 to Co Rd E, 2005 PCI = 34, 2008 PCI = 31
Cummings Lane from Snelling to deadend, 2005 PCI = 61, 2008 PCI = 67
Hamline from Co Rd E to deadend, 2005 PCI = 54, 2008 PCI = 55
nain - no history of problems
y Sewer - no history of problems, install chimney seals on all manholes; correct any I&I deficiencies.
Sewer - project must meet Rice Creek Watershed District requirements; improvements will improve water quality to Lake Johanna.
order to better understand the project costs for this road segment, staff recommends ordering the feasibility report for this project in 2010.
sults of the feasibility report will better estimate actual construction costs, as the report will include the recommended road width, section, storm
ver requirements. etc.
Expenditures 2010 2011 2012 2013 2014 Total Future
Planning/Design 80,000 80,000 2,050,000
Total 80,000 80,000 Total
Funding Sources
2010 2011
2012 2013 2014 Total
Future
Capital Improvement Funds (PI
58,000
58,000
2,05a,aao
Sanitary Sewer Utility Fund
1,000
"000
Total
Surface Water Mgmt Utility Fu
20,000
20,000
Water Utility Funds
1,000
1,000
Total
80,000
80,000
Produced Using the Plan-11 Capital Planning Software Thursday, August 13, 2009
Capital Improvement Plan 2010 thru 2014
Contact Engineer
City of Arden Hills, Minnesota Department Street Department
Operational Impact/Other
The street has deteriorated past the point where other forms of maintenance are cost-effective. Long-term, reconstruction will provide a consistent
roadway section that will reduce costs associated with patching potholes and other pavement failures. Monitoring/maintenance wil be required for
new stormwater features that are not resident -maintained rain gardens.
Produced Using the Plan -It Capital Planning Sofin-are Thursday, August 13, 2009
Capital Improvement Plan
City of Arden Hills, Minnesota
Project # 10-Sew-010
Project Name Generator Building for Lift Station 98
Description
2010 thru 2014
Contact Public Works Director
Department Sanitary Sewer Department
Type Improvement
Useful Life 30
Category Utility Maintenance
Priority n/a
Total Project Cost $50,000
lift station # 8 is the most critical lift station in our system. This is the only lift station that has three pumps in it. This lift station receives flow
rom several other lift stations. In the event of an emergency or power outage this lift station is the first to need a generator deployed to it. Staff
vould like to keep one of our existing generators onsite to assist in an efficent restoration of power in an emergency. To enable us to do this we
Mould like to construct a storage building on site approximately the size of a single car garage.
Justification
See description
Expenditures 2010 2011 2012 2013 2014 Total
Other 50,000 50,000
'row 50,000 50,000
Funding Sources 2010 2011 2012 2013 2014 Total
Sanitary Sewer Utility Fund 50,000 50,000
Total 50,000 50,000
Operational Impact(Other
Produced Using the Plan It Capital Planning Software Thursday, August 13, 2009
Capital Improvement Plan 2010 thru 2014
Expenditures 2010 2011 2012 2013 2014 Total
Construction/Maintenance 50,000 50,000
Total 50,000 50,000
Funding Sources 2010 2011 2012 2013 2014 Total
Capital Improvement Funds (PI 50,000 50,000
Total 50,000 50,000
Operational Impact/Other
Chis project does not impact the operating budget as it is an existing trail. The trail is in poor condition and should be replaced. The City does not
)low this trail, businesses along the trail plow it.
Produced Using the Plan -It Capital Planning Software Tuesday, August 11, 2009
Capital Improvement Plan 2010 thru 2014
Prior Expenditures 2010 2011 2012 2013 2014 Total
15,000 Construction/Ma intenance 10,000 10,000
Total Total 10,000 10,000
Prior Funding Sources 2010 2011 2012 2013 2014 Total
L 15,0001 Special Revenue Park Fund 10,000
Total Total 10,000
iorW Impact/Other
will be steel and will have very little maintenance cost.
10,000
10,000
Produced Using the Plan -It Capital Planning Software Tuesday, August 11, 2009
• Bc> LT4N-
Consulting Engineers & Surveyors
" 12224 NlcolletAvenue • Burnsville, MN 55337
Phone (952) 890-0509 • Fax (952) 890-8065
www.bolton-menk.com
MEMORANDUM
Date: August 13, 2009
To: Kristine Giga, P.E., Civil Engineer
Michelle Olson, Parks and Recreation Manager
From: Travis Winter, P.E., LEED® AP
Subject: CP Rail Bridge Trail
City of Arden Hills
Project No.: T16.100325
As requested we have updated the probable costs for constructing the CP Rail Bridge Trail. With our field
topography completed at the site some additional characteristics have been revealed that will make this
crossing more challenging.
The initial cost estimate for the project was based on the information available which included GIS 2'
contours and NWI wetland indications. No record drawings for the bridge were available. Now that the
topographic survey has been completed, we have identified a probable wetland located just north of the
bridge crossing, which was not shown on the NWI map. Our survey also revealed a very shallow bury
depth of the existing bridge abutment — that is, ANY excavation adjacent to this abutment will need to be
mitigated with a structural retaining wall. The combination of these influences makes for a more complex
design.
What we're now faced with is a deeper cut under the bridge (--7'-S'), necessary to avoid impacting the
wetland to the north, but also a corresponding taller wall, necessary to mitigate the deeper cut. In
addition, temporary shoring will likely be needed to allow the permanent wall to be built. Based on this
design, we estimate the project costs will be $340,000. This is quite a bit more than the original estimate
of $221,000 that assumed a much shallower cut.
Please contact me at your convenience to discuss these project developments.
F:1_Civil\ARDHIT 161003251Correslmemo_081309.doc