Loading...
HomeMy WebLinkAbout7B Motion to Direct Staff to Apply for American Recovery and Reinvestment Act (ARRA) Transportation Enhancements Funding 7B Request for Council Action Prepared By: Kristine Giga, Civil Engineer Council Meeting Date: March 30, 2009 Motion to direct staff to apply for American Recovery and Reinvestment Act (ARRA) Transportation Enhancements Funding Budgeted Amount: Actual Amount: Funding Source: N/AN/AN/A Recommendation: 1.Direct staff to apply for American Recovery and Reinvestment Act (ARRA) Transportation Enhancements Funding Supporting Documents: See the attached memo from City staff. 1. Transportation Enhancements (TE) Policies for the 2009 ARRA 2. TE Projects- Qualifying Criteria 3. Application for TE Funding under the ARRA 4. Memo from Kimley-Horn, regarding the County Road E Bridge 5. MEMORANDUM DATE: March 27, 2009 TO: Mayor and City Council Ron Moorse, City Administrator FROM: Kristine Giga, Civil Engineer SUBJECT: American Recovery and Reinvestment Act (ARRA) Transportation Enhancements (TE) Funding BACKGROUND/DISCUSSION An announcement was recently made for project solicitation for American Recovery and Reinvestment Act (ARRA) Transportation Enhancements Funding. There is approximately $7.5 million available to the seven-county region for Transportation Enhancements projects from the ARRA. This is a solicitation for project applications for the use of these funds. Attached to this memo are the policies, qualifying criteria, and application for the Transportation Enhancement Funding. Each applicant may submit only one proposal to be considered. The applications must be received by the Metropolitan Council by 5:00 p.m. on Friday, April 3. City staff has identified the following projects that may be considered for this proposal: County Road E Bridge Improvements County Road E-2 pathway (Safe Routes to School project), possibly bundled with the Perry Park pathway CP Rail Bridge Improvements Each of these projects has several issues that may impact their eligibility, fundability and feasibility with respect to the solicitation requirements and associated timelines. Staff is further investigating and following up with several agencies for clarification; this information will be provided to the City Council at the meeting. The key issues related to the CR E bridge improvements relate to the feasibility of adding width to the bridge, the acceptability and fundability of a 7.5 foot wide sidewalk that is substandard for multi-use (bike and pedestrian), and the fundability of a sidewalk on the bridge without an approved plan for a sidewalk/trail to the west. A memo from Matt Jensen of Kimley-Horn, the City’s consultant engineer, concerning the engineering issues related to the bridge is attached. RECOMMENDED COUNCIL ACTION \\Metro-inet.us\ardenhills\Admin\Council\Agendas & Packet Information\2009\03-30-09 Regular\Packet Information\7B - 3-30- 09Memo_ARRA_TE.doc 3/27/2009 Page 2 Direct staff to apply for American Recovery and Reinvestment Act (ARRA) Transportation Enhancements Funding. TRANSPORTATION ENHANCEMENTS POLICIES FOR THE 2009 AMERICAN RECOVERY AND REINVESTMENT ACT 1.TE funds are available to all Minnesota state agencies, the Metropolitan Council, other transit providers, Indian tribal governments, the seven counties, all cities and towns within the Twin Cities seven county region, and the ten Regional Park System Implementation agencies. Other local or special governmental agencies and private groups are also eligible, but must have a public agency sponsor. The agency sponsor is the local unit of government of record. The local unit of government is responsible for making arrangements with the project proposer to ensure all project requirements of the local unit of government are met. An Agency Agreement is written between Mn/DOT and the local unit of government. The local unit of government will administer the project using the State Aid for Local Transportation (SALT) Delegated Contract Process (DCP) for federal aid projects. 2.Generally, TE funds are available for the activities listed under #1 of the Qualifying Criteria and incidental activities associated with them if the incidental work does not constitute more than 30% of the project costs. See Qualifying Criterion #1 for a description of what is meant by “incidental activities”. 3.Generally, for projects that involve the construction of facilities, the TAB will provide TE funds for project construction and materials, right of way, and land acquisition. For TE- eligible projects that do not involve construction (e.g., bicycle and pedestrian safety education activities), the TAB will provide TE funds for program implementation and related activities. TAB will not provide TE funds for study completion, preliminary engineering, design, construction engineering, or other similar costs. 4.A TE construction or reconstruction project must be a permanent improvement having independent utility. Temporary construction is defined as work that must be essentially replaced in the immediate future (within five years). Staged construction is considered permanent rather than temporary so long as future stages build on, rather than replace, previous work. All projects must comply with the requirements of the Americans with Disabilities Act. Reconstruction of a bikeway/walkway facility is eligible as long as the facility is beyond its useful life. 5.TAB will not award more than $1,300,000 in TE funds for a specific project. TAB reserves the right to partially fund any project. 6.Projects will be added to the TIP only as a result of the TAB approval in response to this and subsequent solicitations. 7.Projects listed in the region’s draft or adopted TIP are assumed to be fully-funded and to have independent utility from other projects. 8.The Technical Advisory Committee shall prepare an annual report on the implementation of regionally solicited TE projects for the review and approval of the TAB. This report,the Annual Implementation Report shall include updated program, system and project information. The TAC shall include such findings, recommendations and additional information, as it deems appropriate. 9.If a project is added to the TIP, the entire project is included even though a portion of that work extends beyond the period for which submittals were requested provided that a significant portion of the work is scheduled for letting within the request period. 10.Project approvals for projects in the TE element of the TIP are specifically limited to the federal fund amount identified in the Annual Implementation Report for purposes of plan specification and estimate (PS&E) approval as well as project authorization. The federal fund amount listed for each project may be used to fund 80% of any identifiable useable element of the project described or to fund the entire project with a flexible federal/non- federal participation. The federal fund amount listed in the Annual Implementation Report is the total that shall be authorized as PS&E approval for all advertisements of the project described. Any federal fund amounts authorized at PS&E approval in years prior to the current year shall be deducted from the amount identified in the TIP at the time of approval. As noted in Policy 5, TAB will not award more than $1,300,000 in TE funds for a specific project. 13. TAB will not fund a Transportation Enhancements project for which the pedestrian, bicycle or environmental components and benefits have been claimed in a related STP, CMAQ or BIR project that was funded in a previous solicitation. TRANSPORTATION ENHANCEMENTS PROJECTS - QUALIFYING CRITERIA 1.Qualifying Activities. The applicant must show that the proposed project falls under at least one of the following list of twelve qualifying activities and must state the specific category(ies) the project qualifies under. The list of qualifying TE activities provided in 23 only U.S.C. 101(a)(35) of SAFETEA-LU is intended to be exclusive, not illustrative. That is, those activities listed therein are eligible as TE activities. 1.Provision of facilities for pedestrians and bicycles. 2.Provision of safety and educational activities for pedestrians and bicyclists. 3.Acquisition of scenic easements and scenic or historic sites including historic battlefields. 4.Scenic or historic highway programs (including the provision of tourist and welcome center facilities). 5.Landscaping and other scenic beautification. 6.Historic preservation. 7.Rehabilitation and operation of historic transportation buildings, structures, or facilities (including historic railroad facilities and canals). 8.Preservation of abandoned railway corridors (including the conversion and use thereof for pedestrian or bicycle trails). 9.Inventory, control and removal of outdoor advertising. 10.Archaeological planning and research. 11.Environmental mitigation to address water pollution due to highway runoff or reduce vehicle-caused wildlife mortality while maintaining habitat connectivity. 12.Establishment of transportation museums. One or more of these activities must constitute at least 70% of the project cost. Unlisted ancillary activities such as paving a parking lot, constructing buildings or providing restrooms must constitute no more than 30% of the total project cost. Applicants whose project is part of a larger transportation project must provide a construction cost summary demonstrating that at least 70% of the project is eligible for Transportation Enhancement funds. Many projects include a number of activities – some which are on this list and others that are not. Only those project activities that are on the list may be counted as TE activities. For example, a rest area might include a historic site purchased and developed as an interpretive site illustrating local history. The historic site purchase and development would qualify as a transportation enhancement activity. Work that is made possible because a project presents an opportunity to improve and enhance the environment and or aesthetics in the vicinity of a project may be eligible for enhancement funding. For example, a construction project may present an opportunity to improve the condition of an adjacent stream bed to improve water quality, construct a vital link for a community bikeway system and develop a landscaped green area to enhance the downtown environment. Activities that are not explicitly on the list may qualify if they are an integral part of a larger qualifying activity. For example, if the rehabilitation of a historic railroad station required the construction of new drainage facilities, the entire project could be considered for TE funding. 2. The funded activities must be accessible to the general public or targeted to a broad segment of the general public, and must be ADA compliant. 3. Projects must relate to surface transportation. Project Linkage(from federal guidance) To comply with Federal guidelines for eligibility there are two basic considerations: Is the proposed action one of the listed activities in the TE definition in SAFETEA-LU? How does the proposed action relate to surface transportation? The applicant must provide a clear statement describing this linkage. The definition of TE activities includes the phrase, "transportation enhancement activities means, with respect to any project or the area to be served by the project, any of the following activities, if such activity relates to surface transportation:..." The nature of a proposed TE project's relationship to surface transportation should be discussed in the project proposal that you submit. For example, where runoff from an existing highway contaminates an adjacent water resource and a transportation enhancement activity is proposed to mitigate the pollution caused by the run off a clear highway or transportation relationship exists. Another example might involve the acquisition of a scenic easement. The acquisition would be in connection with the preservation of a scenic vista related to travel along a specific route. Where a TE activity is for acquisition for scenic preservation purposes, and proposes to contribute to the visual experience of the traveler, but is a substantial distance away with respect to a highway or transportation project, the TE activity must be determined to make a substantial contribution to the scenic viewshed. Given the nature of the list of eligible activities, it is not necessary that each TE activity be associated with a specific surface transportation project to be eligible for funding. Examples which illustrate this include: the rehabilitation of a historic train structure, the provision of a bike or pedestrian path, or the establishment of a transportation museum. Proximity to a highway or transportation facility alone is not sufficient to establish a relationship to surface transportation. Additional discussion, beyond proximity, is needed in the TE project proposal to establish the relationship to transportation. For example, an historic barn that happened to be adjacent to a particular highway facility would not automatically be considered eligible for TE funds simply because of its location; visibility to the traveler in a way that substantially enhances the traveling experience could qualify. Specific documentation of the enhanced experience is required; conversely, a historic structure, such as the barn in the above example, could not be disqualified from consideration because it was not adjacent to a particular Federal-aid facility, as long as some other relationship to surface transportation could be established. It is not necessary to have a TE activity function as an active transportation facility, either past or current, to qualify as an eligible TE activity. For example, a scenic or historic site may have a relationship to transportation but not function as a transportation facility. Once a relationship to surface transportation is established, TE activities can be implemented in a number of ways. For example, they can be developed as parts of larger joint development projects, or as stand-alone projects. 4. The project must be included in, be part of, or relate to a problem, need or direction discussed in: 1) a local or county comprehensive plan found to be consistent with Metropolitan Council plans; 2) a locally approved capital improvement program; 3) an officially adopted corridor study reflected in the local plan; or 4) the official plan or program of the applicant agency. The applicant must reference the appropriate comprehensive plan, CIP, corridor study document, or other plan or program and provide copies of the applicable pages. Because all communities in the seven-county Twin Cities region are currently in the process of updating their local comprehensive plans, applications in the 2009 Solicitation may be for projects included in the most recent local comprehensive plan that was found to be consistent with Metropolitan Council plans. It also must not conflict with the goals and policies in these adopted regional plans: the 2030 Transportation Policy Plan, the 2030 Regional Framework, and the 2030 Regional Parks Policy Plan. Trail projects that claim to be part of the regional trail network as defined in the 2030 Regional Parks Policy Plan must be identified in a Metropolitan Council-approved trail master plan. 5. Typically a transportation project involves mitigation, work in addition to immediate construction activities, that is negotiated with permitting agencies and local governments as a condition of obtaining permit approval. Activities that are normally part of the mitigation of a transportation project are not eligible. NOT ELIGIBLE - Work that is required as a condition of obtaining a permit or concurrence not eligible for a different transportation project is for enhancement funding. For example, a city may require a highway expansion project to include streetscape enhancements in order to gain municipal consent. In that case, streetscape work performed to satisfy the municipal consent requirement is not eligible for Transportation Enhancement funding. Federal permitting and authorizing agencies may include the U.S. Forest Service, U. S. Corps of Engineers, and others. State permitting agencies may include the Minnesota Department of Natural Resources, the Minnesota Pollution Control Agency, and the Minnesota State Historic Preservation Office. Regional agencies may include watershed districts and metropolitan planning organizations. Local agencies may include counties and cities. 6.The applicant must assure it will operate and maintain the property and facility of the project for the useful life of the improvement, and not change the use of any right-of-way acquired without prior approval from the Minnesota Department of Transportation and the Federal Highway Administration. The FHWA requires that states agree to operate and maintain facilities constructed with federal transportation funds for the useful life of the improvement, and not change the use of any right-of-way acquired without prior approval from the FHWA. TAB has determined that this requirement will be applied to the project applicant. FHWA considers most physical constructions and total reconstructions to have a useful design life of 10 years or more, depending on the nature of the project. Bridge constructions and total reconstructions are considered to have useful lives of 50 years. The useful life of the project will be defined in the inter-agency maintenance agreement that must be prepared and signed prior to the project letting. 7.Proposed designs for bikeways and for combined bike/pedestrian facilities must meet MN/DOT State Aid standards. Exceptions to the State Aid standards may be granted during , not final design if warranted based on social, economic or environmental alternatives through this solicitation process. Failure to meet the standards or justify exemptions will result in the loss of federal funds. 8.Projects must be coordinated with all affected communities and other levels and units of government. Coordination is defined as written communication from the applicant to all affected communities informing them of the project. The applicant must provide a copy of the written communication as proof of coordination. Applying for Transportation Enhancements (TE) Funding under the American Recovery and Reinvestment Act (ARRA) There is approximately $7.5 million available to the seven-county region for Transportation Enhancements projects from the ARRA. This is a solicitation for project applications for the use of these funds. Eligible Applicants State agencies, cities and counties in the seven-county metropolitan area, regional park agencies, or non- profit organizations with an application that is sponsored by a public agency are eligible for Transportation Enhancements funding. All applicants are limited to only one proposal to be considered for funding. Directions for Submittal of Applications Applications must be received by the Metropolitan Council by 5:00 p.m. on Friday, April 3. Applicants may submit their application via email to or by mail at 390 Robert Street james.andrew@metc.state.mn.us North, St Paul, MN 55101. Applications received later than this time will not be accepted. Policies for ARRA Transportation Enhancements Funding The Transportation Advisory Board (TAB) will not award more than $1,300,000 in Transportation Enhancements funds for a specific project. An applicant may request funding for a project that has a cost higher than this amount but must identify what funds it will use to fund the remainder of the project. All cost increases must be paid for with local funds. An applicant’s financial participation that reduces the amount of ARRA funding being requested is encouraged, and such participation will be considered in project evaluation. TAB reserves the right to partially fund any project. The TAB will not award a grant of less than $125,000 in Transportation Enhancements funds. Project applicants can “bundle” projects together to meet this minimum. (Example: Bundled projects could consist of signing and lighting a number of bike trails in several cities.) Communities may want to consider using joint powers agreements for implementing bundled projects. Applications may be for projects which are not in the 2009-2012 Transportation Improvement Program (TIP) or for projects in the 2009-2012 TIP currently programmed for 2010 and later. Projects currently programmed for 2009 are not eligible for ARRA Transportation Enhancements funding. The following items must be approved by State Aid in order for the project to be authorized: Environmental Documentation Right-of-Way Certificate Plans Specifications Estimates Failure to have any of these items approved by November 13, 2009 will result in a loss of funds to the project. The following types of projects are eligible for receiving Transportation Enhancements funds: 1.Provision of facilities for pedestrians and bicycles. 2.Provision of safety and educational activities for pedestrians and bicyclists. 3.Acquisition of scenic easements and scenic or historic sites including historic battlefields. 03/19/2009 4.Scenic or historic highway programs (including the provision of tourist and welcome center facilities). 5.Landscaping and other scenic beautification. 6.Historic preservation. 7.Rehabilitation and operation of historic transportation buildings, structures, or facilities (including historic railroad facilities and canals). 8.Preservation of abandoned railway corridors (including the conversion and use thereof for pedestrian or bicycle trails). 9.Inventory, control and removal of outdoor advertising. 10.Archaeological planning and research. 11.Environmental mitigation to address water pollution due to highway runoff or reduce vehicle- caused wildlife mortality while maintaining habitat connectivity. 12.Establishment of transportation museums. One or more of these activities must constitute at least 70% of the project cost. Unlisted ancillary activities such as paving a parking lot, constructing buildings or providing restrooms must constitute no more than 30% of the total project cost. Applicants whose project is part of a larger transportation project must provide a construction cost summary demonstrating that at least 70% of the project is eligible for Transportation Enhancement funds. Many projects include a number of activities – some which are on this list and others that are not. Only those project activities that are on the list may be counted as TE activities. For example, a rest area might include a historic site purchased and developed as an interpretive site illustrating local history. Only the historic site purchase and development would qualify as a TE activity. Work that is made possible because a project presents an opportunity to improve and enhance the environment and or aesthetics in the vicinity of a project may be eligible for enhancement funding. For example, a construction project may present an opportunity to improve the condition of an adjacent stream bed to improve water quality, construct a vital link for a community bikeway system and develop a landscaped green area to enhance the downtown environment. 03/19/2009 ARRA Transportation Enhancements Application INSTRUCTIONS: Complete and return application to the Metropolitan Council by 5:00 p.m. on Friday, April 3. Applicants may submit their application via email to james.andrew@metc.state.mn.us or by mail at 390 Robert Street North, St Paul, MN 55101. Applications received later than this time will not be accepted. All Projects : Provide a map of the project location within the context of its city and county. Describe the opportunity that the proposed project is taking advantage of or the nature of the problem that it aims to address. What is the acknowledged issue that this project would remedy? How significant is it? Provide a description (no more than one page) of the project. Does the project take advantage of a time-sensitive opportunity (for example, funds will be lost, landowner is a willing landowner, affiliation with another project, etc.)? Is the project in the TIP? For what year? Is right-of-way needed? Is environmental documentation complete? Will the project be fully funded if you receive the requested amount of ARRA funding? How much, if any, other funding besides ARRA will be committed to this project and from what sources? Provide documentation. 03/19/2009 Bicycle and Pedestrian Projects: How does the project fill a gap in a larger network, overcome a travel barrier or otherwise seize on a significant opportunity in a bike/pedestrian network? Does the project address an identified safety issue? Describe the safety issue, where it is identified, and how the project will address it. List significant travel attractors that the facility connects to including any transit routes. (Projects will be evaluated on this answer as well as on the population density within one-mile of the project to determine the potential use of the facility.) If a demand analysis for the facility has been conducted, you may include it as additional information to help evaluate relative levels of demand. All Other Project Types: How does the project provide more than a local benefit? How will the project benefit the experience of users of multiple modes of transportation (cars, bikes, pedestrians, transit riders)? What is the population density within one mile of the facility? (Applicants do not need to provide this information; this will be calculated by Metropolitan Council staff using 2000 census data) If a demand analysis for the facility has been conducted, you may include it as additional information to help evaluate relative levels of demand. 03/19/2009 • Ms.KristineGiga,P.E. CityofArdenHills From: MattJensen,P.E. Kimley-HomandAssociates,Inc. RE: CountyRoadEBridgeoverTH51 Bridge62010 TheCityofArdenHillswouldliketoaccommodatebetterpedestrianandbicycle accessacrossTH51atCountyRoadE.Thecurrentbridgehasa2'-6"wide sidewalkoneachsideofthebridge.Thesesidewalksarenotsafeorfunctional aspedestrianorbikecrossings.TheCityisconsideringwideningtheexisting bridgeonthenorthsidetoprovideawidersidewalk. Sincetheexistingstructureisconsideredfunctionallyobsoleteandhasa sufficiencyratingof81.9,wesuggestedtheCityreviewtheconditionofthe bridgetoevaluateifthestructurewouldqualifyforBridgeBondingfundingin thenearfuture.Kimley-HommetwithMarkPribulaoftheMn/DOTMetro DistrictandPaulKivistooftheMn/DOTBridgeOfficeatthebridgeonMarch 18,2009.Thepurposeofthemeetingwastodiscussthebackgroundofthe structureandreviewtheconditionofthebridge.Mn/DOTiscurrentlytheowner andisresponsiblefortheinspectionandmaintenanceofthebridge. Thebridgewasconstructedin1961.Thebridgeisatwospanstructurewith prestressedconcretegirdersandacast-in-placeconcretedeck.Aswastypicalat thetimethebridgewasconstructed,thereinforcingsteelinthedeckisnotepoxy coated(Le.blackbar). NomajormaintenancewasdocumentedonthestructureuntilMn/DOTleta bridgemaintenancecontractin1994.Theprojectincludeda"limitedservice" overlayandexpansionjointreconstruction.Thelimitedserviceoverlayinvolved scarifying1/2"ofexistingdeckthicknessandplacementof2ofconcreteover thewidthofthedrivinglanes(30-ftwide),butdidnotincludeanyconcrete repairfortheunderlyingdeck.Weunderstandthat"limitedservice"likely meansthattheexposedconcretebeneaththenewoverlaywasinpoorcondition andnotcosteffectivetocompleterepairs.Generally,thistypeofoverlayhasan expectedservicelifeof10-15years.Thecurrentoverlayisenteringits15thyear ofservice. • Ms.KristineGiga March2009 24, Pageof3 TheCityappliedtoMn/DOTforCooperativeAgreementfundsin2006.We understandthisrequestwasdenied.InreviewofMn/DOTmemos,theBridge OfficecommentedthattheproposedbridgewideningwouldnotmeetMnlDOT Standards.Specifically,theproposedwideningwould: •Reducethevehicularlanewidthsto14feeteach,therebyloweringthe deckgeometryappraisalratingto2 •Providea7'-6"widesidewalkthatissubstandardformulti-use (pedestrian&bicycle)trailuse •Potentiallyoverloadthefaciabeamundertheexpandedsidewalk Overall,theBridgeOfficedidnotviewtheproposedwideningasaviable alternativetoprovidingpedestrianaccessattheexpenseofvehicularsafetyona nearly50-year-oldbridge.WeunderstandthatMn/DOTwouldlikeatleast30 yearsofservicefromanyimprovementtotheexistingbridge. Weconductedabriefwalkaroundthestructure,performingvisualobservationof thebridgeelements.Generally,thebridgeisinsatisfactorycondition.According totheStructureInventory,theconditioncodesforthemajorbridgecomponents areasfollows: ComonentNBIConditionCodeConditionDescri Deck6Satisfacto SuerstructureSatisfacto 6 SubstructureGood 7 Mn/DOTreports10%oftheconcretedeckisunsound,baseduponestimationin 2004.Ourvisualobservationsnotednumeroustransversecracksthroughoutthe concreteoverlay.Theconcreteoverlayislikelyneartheendofitsservicelife. Eventhoughthedeckispartiallyunsound,thisdoesnotjustifyalowerrating. Visually,theundersideofthedeckappearstobeinsatisfactorycondition.There arenumeroustransversecracksbetweentheconcretebeamswithminorleaching, butthisistypicalforabridgeofthisage. Theexpansionjointsshowmoderatedeteriorationandminorleakage.Typically, thistypeofjointisreconstructedwhenshowingthislevelofdeterioration.Other maintenanceworkonthebridgewouldincludegreasingtheexpansionbearings onthetwo-spanstructure. Otherbridgeelements,includingtheprestressedconcretebeams,abutments, piers,andrailingallareingoodtosatisfactorycondition.Overall,weagreewith theconditioncoderatingsdocumentedontheMn/DOTbridgeinspectionreport forthisstructure.Whiledifficulttodetermine,itislikelythatthisbridge,with continuedmaintenance,willcontinueitscurrentserviceforatleastanother10 years. Ms.KristineGiga March2009 24, Pageof3 WeassumethatURSdeterminedtheexistingbridgecansustaintheadditional l'-2"ofdeckwidthforthenewsidewalk,pertheCooperativeAgreement ProgramApplicationdatedOctober11,2006.Priortomovingforwardwiththe wideningproject,wehighlyrecommendtheCitybetterunderstandthecondition oftheexistingbridgebeyondsimplevisualobservations.Thestructureisnearly 50yearsoldandiscurrentlyfunctionallyobsolete.Werecommendmorein- depthanalysisofthestructurebeconductedbeforecommittingCityfundstothis structure. WesuggestthatMn/DOT,asthebridgeowner,provideadditionaltestingofthe existingbridgedeck.Thistestingwillbetterdeterminetheconditionofthe existingconcretedeckbelowtheoverlay.Thesetestscanincludebothnon- destructiveanddestructivetesting.Non-destructivetestscanincludeachain- dragoftheexistingdecktodeterminetheextentofdelaminatedconcrete. Destructivetestingcouldincludechloride-iontesting,partialexposureofdeck rebar,andconductivityteststoevaluatethelevelofcorrosiononthenon-epoxy coated(black)reinforcingbars. ThesetestsarerelativelysimpleandwouldsubstantiallyhelpMnlDOTandthe Cityevaluatewhatimprovementsshouldbeconsideredforthisstructure.Alocal independenttestinglaboratorycouldprovidethisinvestigation,likelyunder $4,000.Mn/DOTcouldpotentiallyutilizemaintenancefundsforthistesting. Thisismoneywellspentwhenconsideringaninvestmentofover$350,000. Ifthedeckstructureisfoundtobeingoodcondition,werecommendtheCity collaboratewithMnlDOTtoprovideadeckwideningandbridgemaintenance project.Theexistingstructurewouldneedstructuralanalysisandgeometric standardreview;thisanalysishasbeenincludedinourbridgewideningfee. Assumingthebridgeisviablestructurallyandgeometrically,theCitycoulduse itsfundsforthedeckwidening,whileMn/DOTcouldusemaintenancefundsfor deckrepairsandjointreconstruction.Bothagencieswouldrealizecostsavings byhavingonecontractorprovidetherepairsandwidening. Ifthedeckisfoundtobeinpoorcondition,ornotstructurallysuitablefor widening,werecommendtheCityreconsiderthewideningproject.Mn/DOT shouldthenre-evaluatetheconditioncodingofthebridge.Sincethisstructureis ownedbyMnlDOT,StateTransportationFunds(BridgeBonding)cannotbe usedtoreconstructthebridge. Werecommendwhatevercourseispursued,thattheCityworkstogetherwith Mn/DOTtodeterminethebestcourseofaction. Cc:BethEngum,P.E.-KHA JerryPertzsch,P.E.-KHA MarkPribula,P.E.-Mn/DOT PaulKivisto,P.E.-MnlDOT