HomeMy WebLinkAbout7A, Consider Adoption Amended 5 Year Equipment CIP�
EN HILLS
�
Request for Council Act�on �
�
Prepared By: Terry Maurer, Public Works Director � Council Meeting Date: March I4, 2011
Consider Ada�ting A�nendec� 5 Year Equipment CIP
Budgeted Amount: Actual Amount: Funding Source:
NIA N/A N/A
Recommendation:
Motion to Approve the Amended 2011-2015 Equipment Capital Improvement Plan.
Supportin�Doc�ments:
1. Memorandurn dated March 14, 2011 from Terry Maurer, Public Works Director.
2. Adopted 5 Year Equipment CTP Projects By Year Summary.
3. Proposed Amended 5 Year Equipment CIP with attached Detail Sheets.
�
EN HILLS
MEMORANDUM
DATE:
TO:
FR4M:
March 14, 20l 1
Honorable Mayor and City Co�ncilmembers
Patrick Klaers, Ci�y Administrator �
Ci
Terry Maurer, Public Works Director
SUBJECT: Praposed Amendment to the 5 Year Equiprr�ent CIP
Back round
On January � 8, 201 �, the City Council held a work session at the Public Works facility
where a discussion of current issues pertaining to the aperation of the Pub�ic Works crew
was discussed. One of those issues presented by me was a proposai to change the fleet
makeup in an effort to rraake the infrastructure maintenance tasks more efficient anc� to
add more redundancy from an equip�ent standpaint to critical tasks performed by our
Publie Warks crew.
With that as bacicground, a#tached are the Projects by Year summary sheei from the
current adopted 5 Year Equi�znent CI� anc� a propased amended plan. Alsa attached are
the detail sheets from the p,roposed amended p�an. As you will note from comparing
these two; the tota� expenditure over the fve year per�od is approximately the sazne and
the year-by-year expenditure is actually lower in 20l 1 and 20I2 in the proposed plan than
the adopted pIan. The proposed plan has been reviewed with the Director of Finance and
Adrninistrative Serviees.
Some of the major changes in the amended pIan are no#ed below with a more an-depth
discussion of specific fleet changes later in the me�o:
• The replacement of the Skid Steer scheduled for 2dI l would get the City into
Bobcat's prograrn of providing a new Skid Steer every � 2 months at a east of
approximately $2,500. This wil� become a� equipment Iease and will be maved
to the Public Works operating budget in the future.
• The replacement of the setter and Vactar Truck with Combo Machine has been
moved to 2012 and the Replacement of the 1998 Dump Truck with
plow/win�/sander has been zx�oved to 201 l. This is proposed because the dump
truck is more critical to the operation than the jetter/vactor combo �nachine.
City Council Meeting
C:lUserslter�y.maurerlDesktoplEquipmentCl PMemo.dac
Paae I of 4
� The Replace 1997 Dunnp Truck with plow/wi�g/sander has been moved from
2015 to 2013. Again, this is proposed due to the critical nature of having reliable
snow removal/de-icing equipment in the City fleet.
� The 1998 Dump Truck is proposed to be replaeec� before the 1997 Dump Truck.
because of the recent major investment in repairs to the 1997 Dump Truck.
• Purchase of a used Dunnp Truck with plowlwi�g/sander from Ramsey CoUnty has
been added to 20l 1 with replacement af that vehicle wi�h ar�ather used truck
from Ramsey County shown in 20 i 5.
• T�e Taro Groundnr�aster which was origi�a3ly shown to be replaced in 2412 has
been r�oved to 2411 and it is praposed to be replaced wit� two "zero-t�rn"
rnowers instead of another Grounc�master. Tl�e three Groundmasters in our fleet
are used for summer mowing and winter snow removal activities. B}� rep�acing
one of these with two "zero-tui-��' mowers (at a lower cost than purchasing a new
Groundmaster} it wil} allow the remaining two Groundmasters to be used less an
the sum�ner thus extending their life for winter use.
• Replacement of the 1997 Street Sweeper, which �s in reasonably good co�dition
and typically used for non-emergency street sweeping, has been inoved from
2013 to 2015.
• Replacement af the 2000 Backhoe, which is Used often for emer�encies wit�
water main breaks, has been moved from 2415 to 2013. The estiinated cost for
replacemEnt af the 20Q0 Backhoe I�as been increased to include two attach�nents
which will Iawez- costs and increase e��ciency. One attachr�aent is a Rapid Ram
used for breaking frost which we eurrently do not have so the City has to contraci
for this service at a cost of $3,000-$4,000 per occLirrence. The seco�d
attachmeni is a Plate Co�npactor that will help our crew compact these
excavations. CurrentIy, compaction is completed with the backhae b�cket.
• The Replace .� Type Tamper sched�led in 2012 has been dropped from the
Equipment CIP because its act�al replacement cost is under the $5,000 threshold
foF inclusion. At �he appropriate ti�ne, replacement of this equipment wiI] be
ineluded in a future operating budget.
� The Replace Turf Sweeper far $18,000 ori�inalIy schedUled for 20l 3 has been
pUshed back out of the 201 I-2015 timeframe because that piece of equipment is
seldorn �sed so its conditian will serve the City's need for some time. The
Repiace 1993 Taro Turf Aeratar for $]0,000 originally scheduled in 2015 has
been pushed back for the sarne reason.
; Federally mandated emissions cantroi will reach Tier 4 in 20I2 increasing the
cost of vehic�es. This mandate affects aIl motors over 50 hp, but the larger the
motar the rnore significant the increase in cos�. As staff verif ed the replace�nent
costs in the CIP we were told the cost of some larger pieces of equipment may
rise by as much as S-l0%
• As staff prepared the propased CIP we tried to accurately ref�ect "trade-in" value
for each piece af equipment so the Praject Cost in the CIP is a true ref�ection of
the amount the City would expend to p�rchase the replacerr�ent ec�uipment.
City Co�ncil Meetin�
C:IU serslterry.ma�rerlDesktopl�quiprn entC 1 PMemo.doe
Page 2 of 4
Add "Zero-Turn" Movcrers to the Ci Fleet
One of the propased fleet changes in the Equipment CIP discussed above is to add two
"zero-turn" mowers to the City fleet. Staff feeIs strongly that this will add to the
efficiency af �he Public Works crew. As was discussed at the .lanuary work session, the
"zero-turn" mowers can be purchased with the same size mower deck (72"), are a3most
tr�vice as fast as the Groundmaster at mawing grass (b.2 Ac/h:r vs. 3.6 Aclhr}, use abou#
one-half the fuel per haur, and according to our League af Minnesota Cities' Loss
Control Specialist, are ergonomically better for the opez-ator. Accorc�ing to the State of
Minr�esota Equipment Contracts the cost �o replace the Groundmaster, as we har�e it
equipped, is estimated at $38,OOQ while the cost of a Toro "Z' diesel mower with a 72"
deck is approximately $15,Q00.
Staff has done an informa� survey of other agencies in the area that aIready have "zero-
t�rn" rtaowers in their fleet. Listed below are the findings of the survey.
• Mounds View School District has six Taro "Z' mowers in their fleet. They use
the larger gas engine models. They run these rnowers as long as possible
knowing there will be some more major repairs in the later years. Their current
fleet age ranges from ane to eight years.
• Shoreview uses Toro "Z" mowers for boulevards and medians. They purchase
the sznaller iess expensive 19 hp models. TI�ey trade tl�e mowers in after three to
four years trying ta maxiznize trade-in valUe whiie rr�inimizing repair costs.
• Falcon Heights uses a Jahn Deere "zero-turn" mower. They replace it on an "as
needed'' �asis_
+ New Brightan has been t�sing ]ohn Dee�e "zero-turn" mowers but is in tlae
process of converting their fleet to Toro "Z" mowers because of dependabilit�r
issues with the John Deere models.
Re lace a Dum Truck �nd Add a Used Dum Truck in 2011
Arguably, ihe most critical task perfoz�med by the Public Works crew is snow rer�oval
a�-�d de-icing in the winter �anths. The City has approximately 3� miles of pub�ic streets
ir� our system. C�rrently, the three main pieces of snow remaval and de-icing equipment
are a 1997 Dump Truck, 1998 Dump Truck and a Front End Loader equipped w�th a
plow. Staff feels the City wau�d be rnuch better served by a fleet consisting af three
dependable dump trucks equipped with plows and de-icing eyuip�ent. A dum;p truck is
m�ch faster at snow removal than a front end loader, is more maneuverab�e. and can
distribute de-icing material at the same time it is removing snow_ In fac#, one of the t�ro
dump truck plows has to go over the front end laader plaw route to spread de-icin�
material.
City Councii Meetina
C:lUserslterry.nnaurerlDesktoplEquipmentC 1PMemo.doc
Pa�e 3 of 4
If,, during a snow faIl event, one of our dump trucks broke down it would be diffictalt to
complete snow removal and de-icing in a reasonabte amo�nt of time_ It would virtually
be impossibie to "borrow" a replacement vehicle since most other agencies wouId be
using their similar equiprrient at that same time. A breakdown would not only mean that
our one remazning durnp truck wouId have to p�ow half the City, assuming the front e�d
loader could keep up and plow the other half, but it wouId also have to spread de-iein�
material over the entire City. lf our snow removal/de-�cing �1 eei consisted of three duznp
trucks it would have mt�ch more redundancy and a breakdown would be mUch �nore
manageable.
Staff's recammendation is to add a th�ird dump tr�ek snow plow by acyuiring a used
vehicle from the Ramsey County fleet. T%e dump tr�ck acquired from Ramsey County
would 2ikely be three to four years newer than �ust keeping one of our old trucks when a
new one is purchased. The difference between the trade-in val�e of the City's dump
truck versus the cost of purchasing one from Ramsey County is like�y Iess than $10,000.
Also, the City would be able to select the best used tz-uck from the Ramsey County f�eet
before the rernaining used trucks are sold on the open market.
We have shown potentially replacing the used d�mp truck acquired from Ramsey County
by p�archasing another one from tiaem in 2015. Then in the it�ture the City could replace
the three Dump Trucks in the fleet on a three to five year rotating basis.
Council Action Requested
The City CounciI is requested to approve the Amended 20� 1-2015 Equipment Capital
Improvement Plan.
City CounciE Meetina
C:ltJserslter►y.maurerlDesktoplEquipEnentC I PMemo.doc
Page 4 of 4
� City of Ar�ien Hills, Mi�nesota
� Cap�tal Irnprovement Plan
2011 thru 2015
�
PROJECTS BY YEAR
� Pro�ect l�ia�ne Depart�ent Praject # Priarity Project Cost
2fl i #
�Skid Steer LoaderSnow Blower Equ�mer�Y T 1-Eqp-0b3 n!a 5(),fl{]0
ft�hace .letter and Vador �ruck witl� Cambo lulach3ne Equipment i}-Fq'PV-004 s1a 30U.Ob0
56a1T Tookat Wak Mar#�ine SummerAcoessories �quipmen[ 1 i-Eqp-xioc n1a 11.004
� Tota4 [or 24l l 361,Q00
1 �o za
�Brush Cfi�ipper EQutpmer�t 12-�qp--001 nla 5fi.i10�
ToaoGroundsmasterwBroam EquipmenE 12-EqPd102 nIa 38,fl00
Replace 1997 ioro Woriunan wlSprayer Equipment 72-�qp-004 n!a 28.Oa0
�Reptace .! Type �farnper Et�ipment !2-�qp OU5 nla $.OQ�
Replace 1996 Rollef Equipinenf 12-Eqp-0O& n!a ]O.ODO
RepEace 1997 0ump T�dc w1P1owlWing PiovdSander Equq>merit i2-EqpV-002 n!a 15Q.fl0C1
RepEace F250 Picicup Trudcwitl� Pbw Equipment i2-EqpV-0D3 n!a 35.U0�
� F-35U One Ton Truc[c WlDump & Plow Equipmeni 12-EqpVA09 nla 35 00�
Tota! for 2412 353.00�
� 20i3
Replaoe 2f1b2 Graundsmaster witli Snrnar Blower
Raplaoe i937 SL�eet Sweeper
�Reptace 2001 F450 CMe Ton aumplPlowlSander
Repiace irailer
� 20[4 �
Replace 2W2 F450 One-Tori wlflumplP�wlSander
�Replace 7uriSweeper
Replace Pidc up Trnck #2U�
� 2015
Replace 3993 Taro Tur( Aerator
�Replace �998 pump�uc�c wlPiawNVinglSander
Replace 2D00 Badchoe
Equipmenf
Equipment
Equipment
Equipmeni
Tolal for 2Q13
Equipment
Eq�tipmen!
Equ�ment
Tolal for20Cd
T3-Eqp UO3
13-Eqp-0D4
f3-EqpV-002
t3-EqpV-0f0
f4-FqpV-Oit i
14-EqpV-0�5
14-EqpV-4f0
n1a
nfd
n!a
n!a
nla
nIa
Na
39,000
130,000
fi0 ()00
1fl.000
239,0(1D
&�,0�0
18.f1fl6
35,OQ0
113.f100
GRAI�ID TOTAL
Eqaipment
Equipment
EQuiprrtent
�'otal for 20[5
f3-Eqp-0(31
13-�qFV-0(71
f �Eqp-003
n/a
n!a
o3d
�o.000
150.�[l�
85,0(}0
2A5 (f�fl
1.309,(i00
Produced Gsing the Plan-I! Ccr�ita! Planning Software 11"�llar.ulav ,�o��em6er 1 d, 10I �
74
City of Arden Hi�ls, Minnesota
Capital Imp��ovement Plan
2011 t�r� 2015
PR4JECTS SY YEAR
Projeet Name Department Project # Priority Projeet Cost
_..._........._ ._
2- ��
5kid Steer LaaQer-Snow Blower Equipment i i-�qp-005 nla 50>000
Add Used qump Truck with Plaw 8� De-icing Equipmeni Equipment 17-EqpV-000 Na 35,�06
5600F Toalca€ Work Niachine Summer Accessories Equipment i?-Eqp-xxx nla 1fi,000
Toro Groundsmaste► with Two "zero tum" �+lowers Equipment ?2-Eqp-002 nla 27,D00
F-35D One Ton Frudc WlDump & Plow Equipmeni 12-EqpU-009 nla 62,D00
Replace 1998 Dumpiruck wlPlowMlinglSander Equipment 13-EqpV-001 n!a 135,OOfl
"i'otal for 2011 325,fla0
2fl��
Replace Jetter and Vactor T.ruc& wit� Combo Mac3�ine
Replace 1997 Toro Workman wl5prayer
Replace F250 Pickup iruc3c with P[ow
2f��
Replace 1996 Roller
Replace 1997 bump T�rck wlPlowMling PIowlSander
Replace 2002 Groundsmaster with Snow Blower
Replace 20D1 F450 One Ton DumplPlowlSander
Repiace Trailer
Replace 2040 Backhoe
20��
Brush Chipper
Repiace 20fl2 F45D One-Tort wlDumplPfawlSander
Equipmeni
Equipment
Equipmeni
7�otal for 2f}12
Eqvipment
Equipmer�l
Equipment
Equipment
Equipment
Equipment
Totaf for20t3
Equipment
EquipmenE
"[�otal for2U1�
20�
Repface 1997 SVeet 5weeper Equipmeat
Replace 2001 Used �lump Fnrck with Used flump Truck Equipment
Total for 2Q15
GRAND TOTAL
Prodiired L'sir7g 1he Pfan-h CQpitad Platrnrng So�hrare
^'� '
i 1-FqpV-Q04 nIa
i2-�qp-p04 rt!a
12-EqpV-003 nla
12-Eqp-pOfi r�la
12-EqpV-Qa2 nla
i3-Eqp-003 n!a
f 3-EqpV-002 nla
13-EqpV-090 n!a
i5-Eqp-003 nla
T2-Eqp-OOf nla
14-EqpV-001 nla
13-Eqp-004 Na
i5-EqpV-000 n!a
275,QU0
26,500
33,5Q0
335,000
10,D00
T44,000
35,500
56,000
10,OOp
100,000
351,590
26,500
60,Q00
86,500
138,OD0
40,fl0�
178,400
�,27s,oao
77irrrsda��. :i�furclr I0, ?DI !
Capital Ymprovement Plan
Citty of Arden Hi�ls, Minnesota.
Project� 11-Eqp-005
Project Name �wd Steer Laader-Snow Blower
Description
Replace �quiprneni #] 04 - 1993 Case Skid Loader - snow blawer.
V1N #2AF0122633
Hours 1367
L)sed alE }�ear
#85I04
Justi�cation
Equipment u�ill be 18 years aId in ZO1 t
Repair costs for parts and [abor:
2006 - $72.40
2007 - $191.04
2008 - $312.52
2009 - $430.20
201€i - None
ZOI l fhru 201 S
Department Equipment
Contact 1'ub[ic Works Director
'I�ype �quipment
l?scfui Li% 15-17
Categorr Equipment: Public Works
Priaritv n/a
Tatal Proteet Cost: $SO,UOfi
to the 7ohn Deere tractor being repiaced with the ToolCat. this �nachine will be utiiized more frequently on rinks for heav�- snpws.
The Skid Steer LoacEer is a versitile piece af equipment in oar �3eet. It is used for Joading. grading, ]iftine and has the a6iEit�� to accept many
aEtachments. It is howe<<er_ a piece of equipment that wi[1 hecome outdated before it wears o�t. Bobcat offers a program �+�hich after initia]
purchase ofa ne��� s[tid steer allows for ihe parchase of a ne��� skid steer even year at a cost of $200Q-30Q0 plus trade in of Ehe one year o!d skid
steer
Expenditares 2011 2Q12 . 2013 2014 2015 Total
EquipNehicleslFurnishings 58,000 58,000
Estimaied Trade-In Value -8,400 -8,aQ0
Total sn,oao so,oUo
Funding 5ources 20� } 2012 2013 2U14 2015 Total
Equipment/Building Replacem 5U,0�0 50,000
Totai S�,OOq 5p,QDU
Budget impact/Other
:n�er inio the purchase ne�+ and trade for a new piece of equipmenf on a year[y basis at a lo��� ($200Q-30�0) annuaf cosi. 7'his ��ill �eep repair cost
ninimal while pro��iding a new piece of equipme�t annual�y.
Arodr�ced Using !he I�laft-I! Capltal Plunnrng Sofllt�are
Thxrsdu}'. :t9nrch !0, 2011
-2-
Capital Improv�ment P1an 20� � thru Zfl�S DepartmrnE Equipment
City of Arden Hi�ls, Minnesota Contact PubEic Works Director
Budget Items 20l l 20i2 2(113 2014 2D15 Total
�quipment and Vehicle repair -15D -150 -75q �gp
Total -150 -i50 -154 ��p
Prodraced Usrng 71�e Plan-h CaprtQ! Planrting Sofh��are
Tlnersday, :flurch 10. 20II
-3-
Capital Tmprovement Plan 2011 thru Z�YS bepartmcnt Eq�ripment
City of Arden Hills, Minnesota Contact Public Works Director
Project # 11-E[�pV-OOQ
rro�ecc name Add Used Dump Truck with Plow & De-icing Equipment
Type Equipmcnt
L1seFul Lifc 5
Category Equipment_ Public Works
Prioriq° n/a
D�SCI'iptlon � 'Fotal Project Cast: 535,4€f0
�dd a thirc� dump truck (used) witf� plow and de-icing eqiupment to be used as a primary vehicle in sno«� evenis. This truck would replace the use
rf the tront end }oader for snow e�ents. The vehicle wouid be purchased from Ramsey County vehide that are being replace in their fleeE. The
lump truck ��rould be a 2QOI.
Justification
Currently in a sno�v event the Ciry's 3i miles of streets are plowed by two dump tru�ks and a front end toader. The front end loader has limitatio�s
as a primar}� snow removai vehicEe. it is relatively slow mo�ing as compared to a dump truck and cannat distrihute de-icing maEerial so one of our
l�r�o durnp trucks must go over the front end loader plow route. ]t woufd be diffice�lE to dea! with a average sno�v e�ent if one our two dump trucks
hac! a major breakdown. Therefore addir�g a third dump trucic for plowing wilt add significant redundancy to our sno��� remova] fleet_
Expenditures 2011 20I2 2013 2014 2015 Total
EquipNehicleslFurnishings 35,D00 35,040
TotaI 35,000 35,OOU
Fu�ding Sources 2011 2412 2Q13 2fl14 2015 Total
CapitaE lmprovement Funds (PI 35,flOD 35,4a0
Total 3�=Qflfl 35,000
Budget Impact/OEher
Proderced Using llre C'lan-Jf Capttal Plantzing 5of i�•ure
7hursda3•. ;S4arch 1 Q. 201 T
-4-
Capi#al Improvement P1an
City of Arden Hills, Minneso�a.
2011 thru 2415
DeparEmeni Equipa�enE
Contact Public Works Director
Project # � 1-�(�p-XXX
project ?�ame g�ppT Taolcat Work Machine Summer Accessories
Type Equipment
Usefuf Life 15
Category Equipment: Public Works
Priarity nla
DBSCI'Ipt1Qri Total Project Cost: $16,p00
iummer Attachmeni Package fo�- the 5600 7'oalcat T3obcat Wortc Machine. This rnachine irill plo�v al! of our trails and ean salVsand the irails.
�1Uith the surrtmer accessory package, it �vill also have the capability ofmowing boulevards_ brnsh cutting_ spraying fertilizer and sweeping trails
�ncf parking lo[s.
cessories lnclucfe:
" Brushcat Rotary Curier
Gallon Sprayer wilh Boom Kit
nd and SaEt Spreader
Justification I
fhe �60DT - Toolcat Bobcat Work Ivlachine, the City wifl have the ability to mow alo�g the bQuEevards and spray fertikizer for all t�e parks. The
�it.� currently borrows a sprayer f�-om Mounds Vie�v School Districl. The Park Maintenance Plan recen€1y developed_ now calls for alk oithe
ertilizing ta be doRe in house versus a privaEe contracior. The summer accessory package tii�i1J help ihe City to be efficient in maintaining the
�arks and irails to the proper te�els_
Expenditures 2011 2U12 2013 2U14 2015 Tota[
EquipN2hiCEeslFurnishings 16,000 f6,000
TDt�I 16,000 16,OOfl
Funding Sources 2011 20I2 2013 20�4 2t1i5 Total
EquipmentlBuilding Replacem 16,ODD 16,000
Total 1 fi,000 16,OU0
Budget Impact/Other �
Time cfTiciencp resulting in labor savings.
Prodtrced t,'si�ag the Plan-1� Capttal Planning Soft�rare
-�-
T1Tt�rsdur. :1�arch 10. 20II
Cap�tal Improvement Plan 2011 r�ru 2015
Departmeni �quipmenl
City of Arden Hills, Minnesota. ContatE Aubtic Works Director
Budget ltems 2011 2012 2013 2{Tl4 20�5 Total
Il�ainfenance of Parics and 7rail 500 500
Total 5ou 500
Procluced L'si��g �lie Plan-1! Capilal Plnnning Softu�are
lhursda�•. tlarclr 10. 20l1
-s-
Cap�tal Improvemen� Plan Z�li lhru ���5 Departrnent Eq�ipment
City of Arden Hills, �]711eS0�, Contact PubEic Works Director
Pruject # 12--Eq�-002
ProjecE'�amc Toro Groundsmaster witlx Two "zero turn" Mowers
Descriptian
Rep[ace equipmcnt #407 - 2001 Toro Croundsmaster with cutting deck and broom.
V1N � 2i6D00302
I-1oi�rs 2_99i
Clsed in surrEmer for mo�i�ing and winter for rinks and trails.
Type Equipment
Useful Li�'e 1 U
Category £quipment: Public Wor�:s
Prinrity rt/a
Total Nrojeet Cost: �27,Qp0
Repiacemem ���ill be ���ith iwo "zero turn" mowers wiih 72" deck_ 'Fhe "zero turn" mower is faster for mowing turf, more maneuverable_ and
ereonomrcall� betier ior the operaior_ Tite cosE ofeach "zero turn" mower is substancaally iess than the Gro�ndmaster. With the remaining two
Graundmasters in the fleet wili be able to maintain ice rinks and use them less Tor summermowin thus exiening tE�eir life.
Justificatian
B�� adcied t�� o"zero turn" mowers to the Cit�� fleet the remaining two Groundmasters will not see as much use during the summer months_
thereforz. thev ma�� last ]o€�ger �vith primarily winter use.
Expenditures 2011 2012 2t113 2014 2U15 Total
�quipNehicleslFurnishings 30,000 3D,OQ�
Esiimated Trade-In Value -3,UOa -3,OOD
Total 27,400 27,OU0
Funding Soarces 201i 2012 2013 2014 2015 Total
Equipment/Building Replacem 27,000 27,OOfl
Total 27Aflp 27,44�
Budget ImpactlOther
teduced equipment re�air costs
Prudirted t: srtzg rhe Alan-�t ('ppilul Planning Sofltirare
7laursda}•. :L�arcH 10. ?011
-7-
Capitai Improvement Plan 2o i� rhru 201 s
Aepartment EquipmenE
Czty of Arden Hills, Minnesota Confact Public Works DiFector
Budget ltems 2011 2U12 2013 20I4 2415 Total
Equipment anci Vehicte repair -5D6 -1,Op0 -t,00D -2,50D
Tatat -50U •t,OUo -1,o0a 2,50D
Prodt{ced L'sing lire Plan-I! E'upitall'1an17ing Sofh��are
-$-
77rrersdap. A?arch IQ. 7011
Capital Imparov�ment Plan 2011 rhYu 2015
pepartroent Equipment
City of Arden Hi�ls, M11ll1�S0��. Contact Public Works Director
Project# 12-EygV-049
��°;ee� Na'"e F-350 One Ton Truek W/Dump & Plow
Descrzptian �
dehicle #464 - Ford F350 I ton dump truck {Z000) u ith plo�+�
JIT�i# 3FAWF37FX4��275p7
vlilea�e 48,55 i
E$5404
Typt Eqaipment
Elseiul Life 10-12
Cafegory Vehicles
Priority n/a
Total Projeet Cost: $62,QOD
Justification �
Jehicle «�i116e twelve vears ald_ ... .�._ "�
'arts and labor costs:
'006 - $t64.49
�a07 - $130.00
'OQ8 - $1.488.81
'.069 - $122622
'.OFO - $859A0
'O1 1 - None to date
Expenditures 2011 2012 2013 2014 2015 Total
EquipNehicleslFurnishings 67,000 67,000
Estimafed Trade-In Value -5,fl00 -5,D00
Tota] 62,000 62,OUa
Funding Sources 2011 2012 2013 2014 2015 Total
�quipmenVBuilding Replacem 62,fl00 62,000
Tota} 62,OOU 62,OOp
Badget Impact/Other
Reduce rnaintenance and repair costs
Prodirced Usnzg rlae Plan-I! Capital Plae7ning Sofnrpre
Thursda}'. :'19arch 1 f3. 2011
-9-
Capital Improvement Plan
2011 thru 2015
Uepartment Equiprtienf
City of Arden Hil�s, M1I1I1�50� Contact Public Works 17irector
Budget Items 201 l 2012 2013 2014 20] 5 Total
Equipment and Vehicle 2pair -1,D00 -t,000 -i,DDp -1,006 -4,QQU
Ta�,� -�,00a -�,000 -i,000 -�,000 -�,000
Produced Using �he f'Iun-It Capilal Plannrng 3oft�rare
Tirrersday. March 10, 20] 1
-'� �-
CapitalImprovementPlan Z�il ihru Za1S Department Equiprnent
C�ty of Arden Hills, Minnesota cont��, Pubiic Works Director
1Pra�ecs # 13-Eq�V-OOl
Project Nacne RepIace 1998 DumptrUrk w/PEaw/WinglSander
Description �
Vehicte #102, Fard F8513 Dump Truck ���ith P1ow/Wing/Sander
Vin # 1 FDY58QF3WVA4196
Miles 27.292
Hours 2862
#85�02
Justification
Jehicle will be ] 5 years old.
2epair costs:
?406 - $],046.05
?dfl7 - $2_98b.06
?008 - $]3_Ob3.23
?QU9 - $77132
>aio - � � o.aoo
!Ol ] - None to 17ate
Tr�pe Equip�nent
Lseful �.ife TO-lZ
Categor�� VehicEes
Priorih� n/a
Total Project Cust: 5135,U0(F
vehicle witl he I S years old. Due to ho�;� vitial on our d�mp lrucks are ii� sna�� e�-ents it is ir�Portant to have dcpendable vehicles in the fleet.
substantial investmenF �as made in the 3997 Dump'Truck in 2010_ therelore ii is recommended to replace the ]998 Dump Truck first.
Expenditures 2011 2012 2013 2014 2015 Total
�quipNehi�leslFurnishings 16a,000 160,OflQ
Estimated Trade-In Value -25,000 -25,flOD
Total 135,Q00 135,000
Funding Sources 2011 2{3l2 2013 2Q14 2015 Total
EquipmentlBuilding Replacem 135,000 135,OQ0
Total 135,000 135,440
Budget ImpactlOther
2ednced repair costs_
Produced G'srng the PIa17-l� Capital Pfanning Sof1u'are
Thursday�. March !Q. 201I
-'� '� -
Capital Improvement P�an 201 � thru 2�15 Departmcnt Equipment
City of Arden Hills, Minnesota Cootsct Public Works l7irector
Budget Items 2013 2412 2013 2014 2015 Total
Equipment and Vehicle repair -1,500 -1,50U -2,OOQ -2,500 -7,500
iOtal -1,500 -1,500 -2,000 -2,500 -7,590
Pradrrced Using the Plun-11 Cepital Pim2nalag Sofh��are
Thursday. :ilarch I0, �011
.� 2..
Capital Improvement Plan Zfl11 lhru ZQIS �epar�ment EquipmenE
City of Arden Hills, Minnesota Contact Public Works ilirector
Project # 1l-Eq�V-Da4
Project Name Replace Jetter and Vactor Truck with Combo Machine
Descr�ption
Zeplace Vehicle #304 - t987 Ford F800
JIN # ]FDXT84A9HVA58089
�IiEeage ] 7,309 (has nal worked for three ��ears).
�ours 202 - 2007, 463 - 2D08, 509 - 2009_ 678 - 2010
Type Eqaipment
Elseful Life 20
Calegory Vei�icies
Priorii�� n/a
Total Project Cost: 5275,p00
Llsed for cleaning and cutting roots in our sanitary sewer rr3ains, flushing catchbasins, and man[�oles.
ace Vehicle # 303 Vactor -] 998 5terling
HRJAASXAA46353
age: 20.800
-s: 759.6 {1-3r meter added a few yrs ago}
is used for grit chamber/sform sewer, catch basin and lift station wet we]E maintenance.
Justification
['he 7etter is 25 ��ears old and has significant rust and deteriaratian on the chassis and eompartment body.
Repair costs for parts and [abor:
2dd6 - $3.951.64
2007 - $57 ].db
2008 - $535.47
2004 - $4,595.03
2010 - $887.07
e Vaclar is 13 ��ears old and has had signicani t-t�s[ and dete�ioration oiEhe inside components. The corrEputer had to be cc�mpletel�� rep�aced in
I 0.
Repair costs for parts ancE labor:
2006-$] I.b42.14
2007-$432.1i
2008 - $337.] 1
2pD9 - $561.42
2010 - $I S_Sb9
201 ] - $357.00 To Date
A combination,jet/vac unit �+ill allo„ for one fieil tirr�e stafT'and one seasar�at to go out and do jetting and ��ac operations. Withn�at that capabi[ity,
it �ould be a minirrium of 3 f'ult time statito operate both veE�icles. `Che City wil[ see a signifieant labor and fuel sa�-ings and effieienc}� and speed
of service will in�rease. The size of�the vehicle �vas a concern but a�ter research. it was found that ihe eersion our Cit� nou[d purchase does
comfortab{y fit in thc ���arrn storage area.
Expenditures 2011 2012 2013 2f}i4 20I5 Total
EquipNehicfeslFurnishings 300,QOfl 340,OOU
EsEimated Trade-]n Vafue -25,Oa0 -25,OOD
Tpt7� 275,000 _ 275,UD�
Produced U'sing tlte P/mz-/t Capital Planning 5afnrare
Tlre�rsday. ;ilarch 10, 2011
-13-
Capital Improvement Plan 2�1 � thru ���.5 Departmer�r Equipment
City of Arden Hills, Minnesota Contact Public WorE:s Director
Funding SoUrces 2011 2012 2013 2019 2015 Totat
EquipmentlBuilding Fteplacem 275,000 275,000
TotaI 275,U00 275,000
Budget impact/Other j
Zeduceci equipment, veE�icle repair costs, ]abor cost, fuel costs.
Budget Items 20� I
Equipment and Vehicle repair
Total
Aroduced L'sing tl�e Plan-If C'apltal Plannrrrg Sofhrure
20i2
-i,004
•1,000
2013
-1,QOfl
-1,4U0
2014
-2,Q00
•2,OD0
2015
-z,000
-2,OOQ
Totai
�,000
•6,OU0
Thtrrsda�•. :llarch !0, 201I
-14-
Capital Improvement Plan 2011 thru 2015
Aepariment Equipment
City of Arden H�lls, Minnesota Contact PubEic WorE:s Director
�roject # 1Z-Eqp-004
Project Name Repla�e 1947 Toro Worizman w/Sprayer
Description I
RepEac� equipment #41d -] 997 Toro WorEcman, ba]] �e]d line spra}�er.
V]N �D7202-70317
Hours 1 _346
#$�410
]ustification
�quiPment «i!1 be 15 years old_
2epair costs for pans and Eabor:
'd06 - $317.09
'407 - $5�_89
'008 - $U
'.a09 - �253.12
!010 - $300.43
!�1 1 - None io date
Type �quipment
�lseful Life i3-t5
Category Equipmeni: PubEic Wor[:s
Priorit�� n/a
Total Project Cost: $26,SOD
is � ehicle ���i[i be monitored due to lo« hours and replacernent adjusted as needed.
Expenditures 20�1 24�2 20I3 2014 .'._ 2015 Total
EquipNehicleslFurnishings 2$000 28,000
Estimated Trade-In Value -1,5D0 -3,50D
Total 2fi,500 26,500
FnndingSources 201i 2012 2013 2014 20�5 Total
Equiprr�enilBr�ilding Replacem 26,590 26,500
Total 26,500 26,5(�0
Budget impact/Other
teduce repair costs.
Praduced Using tJse Plan-It C'upllul Planrriiag SoftiE�are
7hursda}�_ .S�arch 10, uDI7
-15-
Capita� Improvement Plan 2011 rhYu 2015
Departmcnt Equiprtrent
Ci�y of Arden Hills, M1Ilnf380� Contact Public Worics Director
Budget ltems 2011 2012 2013 2019 2(1�5 Total
Equipment and Vehicle repair -206 -2DQ -200 -660
Tot2t1 -20Q -20U -20U -64D
Prodeicecl t�'sing 1he Plon-It Capila! PIGnning Softs��ure
Theirsday, :'Llarclr 10. 201I
-16-
Capita.l Improvement Plan
City of Arden Hills, Minne�ota
2011 rhru 2015
Department Equipment
Contact Public Works Director
Project i� �2-Eqnv-oa3
Project Narne Re�Iace F25Q Pickup Truck with Plow
Description
VeF�icle #202 - 2002 Ford F250 3/4 ton picl:up and plo�i - diesel tank (aux}
VIN # 11=DXT84�19HVA58
Mileage $2.042
#55202
Justif cation
Vehicle �� ill be ten ;�ears old.
Repair �osts for par[s and [abor:
20D6 - $] _319.OD
2Q07 - $254_96
2008 - $5.68�.65
2049 - $2_2D9.89
2010 - $ I .283 _77
2�11 - $749.52
T}�pr �y�ipment
liseful Life 8-]0
Category VehicEes
Priorih� nla
Total Project Cost: �33 54D
vehicle is 2Q i-ears old. �+ellbe�ond is ezpected useful ]ife
Expenditures 2011 2012 20I3 2014 20I5 Total
EquipNehicleslFurnishings 35,oao 35,06�
Estirr�ated Trade-En Value -1,546 -1,500
'j'p�� 33,500 33,500
Funding So�rces 2011 2fi12 2013 2014 2€F15 Tatal
�quipmentl8uilding Replacem 33,500 33,500
Tota� 33,500 33,500
Budget Impact/Qther
2ecfuced maintenance cosfs.
Produced L'sing rlre Plan-!t Capilal Planning Soffirare
Tlrursdoy, March !0. ZQ!!
-17-
Capital �mprovement Plan 2011 rhYu 2015
Ac�rartment Equipment
City of .Arden Hills, M11111�50� Co�tact Public Works Director
Budget Items 2011 2012 2fl13 20�4 20�5 Total
Equiprrteni and Vehicle repair -5fl0 500 -1,OOp -2,440
Total -54U -500 -1,400 -2,040
Prpdr�ced Usfng t17e Plan-11 Caprla! PlarFslrng Softz+ure
I'hr�rsda}�, d9arch 10. Z01I
-18-
Capital Improvement Plan 2011 thru 201 S pcpartment Equipment
City of Arden Hills, Minnesota Contact Pub{ic Works Director
Nrojccl # IZ-�' E]�-O�fi
project name Replace i996 Roller
Description I
2eplace Equipment #} 06 - 1996 Wacker Rolier
�1N ## 6736�3994
3ours: 4G8,?
7�stificatian
Equipment �+iEl be i7 vears aid.
Repair costs for panti and ]abor:
2006 - $ ] 07.b9
2007 - $75.0(?
2008 - $0
2fl09 - $182.69
2010 - $0
201]
2Q12
hofder for c>ngoing rc��ie�+�. WiEI be pus
Expenditures
EquipNehideslFurnishings
Total
further oui if equipmf
2011 2012
Type �quipment
[Iseful Life I 5-17
Category �qoipmenC Public Works
Priorit}' r►la
Total Projcct Cost: $]0,!)00
condition is deemed reEiable.
2(lI3 2014
1fl,060
10,040
2015
Total
10,Q4(}
14,4D0
Funding Saurces 20l 1 2012 2013 2014 2U�5 Total
EquipmentlBuilding Replacern 10,000 10,OD0
Total 10,000 i o,000
Budget ImgactlOther
Red�ced equipment repair costs.
Prod¢rced U'sfrig 1$e 1'lan-It Capila! Plartning Sofhrare
�� ��
Thtrrsday, R9arclr 1�. ?pll
Capital Improvement Plan 2011 thru 2Q15
Deparimeni EquipEnen[
City of Arden Hills, Minnesota Contact Public Works Director
Budget ltems 201] 2012 2013 20I4 20�5 Total
Equipment and Vehicle repair -i50 -150 -15Q -450
Tot�I -150 -150 -950 -450
Prodzrced L'sirrg ihe Plafrl! C'apifal Plar7ning Sofhvare
Tlierrsdaf�. A9arclr ID. ZOII
�20-
Capital �nprovement Plan 2Q11 thru 2015
Department Equipment
City o� Arden Hills, Minnesota Contact Pubkic Works Director
Project # 12-EgpV-002
Pr�ject ]�ame Replace 1997 Durrt� TrucE� w/Plow/Wing PIowlSander
Description
Jehicle #l0} - 1997 Ford F-$513 damp truck �n�iih �[ow/��ir�g/sander.
d1T` # Ifd4580e9�va34S55
viileage 28_829
�ours 2.901
�85101
7ustification
Vehiele �vill be i4 vears old.
Repair coscs �or parts and fabor:
200b - $15021
2007 - $1.250.33
2008 - $6.808.66
2009 - $6_883.7b
201 Q - $21 _647
201 I - $14p.00 to daEe
Type Equipment
Usefut Life ] 6-12
Category Vehicles
Priority n!a
Tofal Project Cost: $14fl,OflD
This one of o�r t���o ]arge dump trucks are uscd primari�y for plo�ving and de-icing streets ���ill be stxteen years oEd. While the mileage on this
veliicle is relativel�� [ow due to the corrosi� eness of salt. the trame and bodies are beginning to deteriorate. The repair casts for this vehicle have
be�un to rise significantl�� Ehe Tast ihree vears. �4f ith on[y t��°o dump trucks in the snow plaw fleet it �s imperative ihat they be dependable during
snow events_
Expenditures 2011 2012 2013 2014 2015 Total
EquipNehideslFurnishings 1fi0,000 16a,000
Estimated Trade-In Value -2Q,600 -2�,000
Tatal 140,400 140,000
Fu�ding Sources 2011 ZOI2 2013 20I4 2015 Total
EquipmentlBuilding Replae��n 14U,000 i40,060
Total 140,flD0 140,Oa0
Budget ImpactlOther �
tedace repair and n3aintenar�ce costs and improve reliabi�ity of oar primary snow remo��al equipment
Proclrrc'ed Using tlre Plan-h Cupita! Planlar�7g Sofrirare
Thursday, :'lp'prch 10. ?0I1
.�'� �
Capi�al Improvement Plan
City of Arden Hills, Minnesota
2011 thru 2fl � $
Departmeni Equipment
Contact Pu61ic Works Director
Budget lterr�s 201I 2012 2013 2014 2015 Total Fuiure
Equipment and Vehicle repair -1,50D -1,500 -3,DDQ -2,ODD
Tota� -9,500 -�E,50U -3,000 Total
Prpdreced L'sing !he Plun-It CU�itcr! Planning Sofhrare
-��-
Thursday. March 10. 207I
Capital Improvement Plan 2�11 thru Z�IS pepartment Equipmen[
City of Arden Hills, Mi.rmesota Contact Public Works Director
rFo���t # 13-Eqp-003
proje�t Na'"e Rep�ace 2402 Groundsmaster with Snow Blower
Description
Replace equipmeni # 4fl9 - 2002 7oro Groundsmaster -«•ith blo�ier.
V11�1 # 220000338
I�ours 2257
Used in summer for mo�ving a�d ���inter!'or rinks and traiis.
JusYifcation
:quipEnent ���ilE be ten years p[d.
Zepair costs for parts and labor:
!006 - $1-119_75
!007 - $5.409.19
!008 - $849.70
!D09 - $225.10
!010 - $712.55
'0] 1
�a�2
'Fype Equipment
Useful Life 10-12
Categary Equipment: Pnbiic Works
Priority n/a
Totaf Pru,jcct Cost: 535,500
Our midsized n_rountlmaster t�•pc mo��ers have been adjusted lrom a 10 ��ear replacement to a 10-I2 year rep[acement. With ihe adcfition of the
]arge area mower in 2004 and "zero tum" rnor� exs in 2011 _�+e «�i13 monitor use ar�d repairs. as welf as ���hat type of machine �viil be best fQr the
replacemenl.
Expenditures 2411
�quipNet�icles�Furnishings
Estimated Trade-f� Value
Total
24I2 2013 2014
39,OOQ
-3,50Q
35,500
2015 Total
39,6p0
-3,500
35,SU0
Fund�ng Sources 2bl i 2U12 2013 2014 2015 Total
EquipmenUBui�ding Repfacem 35,5Q� 35,506
iotal 35,504 35,50Q
Budget Impact/Other �
2educed repair and maintenance costs_
Produced Using the 1'!un-h C`apila! Pla�vzrng Sofh��are
Thursdrry. March 1 Q 20I I
-23-
Capital �rnprovement Plan 2011 r�ru 2015
Departneent Equipment
City of Asden Hills, Minnesota Cantact Public Works Director
Badget Iterris 2011 2012 2(}I3 2014 2015 Tota[
EquipmenE and Vehicle repair -1,5�U -1,500 -3,000
TOt3I -9,50R -9,500 -3,000
Pradreced (�'sirag ilae Plarr-17 Capifa! Planning Sofifrure
Thitrsdcry-. :tlareh 1 D, ?011
_Y4_
Capital Improvement Plan 24 � 1 rh,•u 2015
Bepariment L-quipment
City of Arden Hi�ls, Minuesota Contact Public Works Direetor
Pro�ect # l 3-EqpV-042
Projeet Name REp��ce 2001 F450 One Ton De�mp/P1owlSander
Description �
Jehicle #f301 - 20a� Ford F450 1 ton dump truck with plo«� and sander
�IN # 1 FDXF47F61 EC92462
vlileage 48,072
Justification
Vehicle will be twelve years o]d.
Repair costs for parEs and labor:
2406 - $8t2.38
2fl07 - $I.544.89
2008 - $ ] .591.24
2009 - $1.539.67
2d10 - $ ] _371.00
Type Equipment
[iseful Life 10-12
Category Vehicles
Priorit�� Na
Total Prajcct Cost: $56,000
ehicle has been a�justed from a i0 year replacement to a I2 �ear replacemrnt. Currentl.� set as a placeho[dec Stall� wilE eontinue to monitor
;hicie condition and maintenance costs.
Expendit�res 20I1 20I2 2413 2014 2015 Toial
EquipNehicfes/Furnishings 65,OQ0 65,OOQ
Estimated Trade-in Value -9,DOfl -9,b0a
Tp�] 5fi,ROfl 56,U00
�'unding So€�rces 2011 2012 2013 2�14 2015 Total
Equipmenf/Suilding Replacem 56,000 56,a60
TotaI 56,ODD 5fi3OU0
Budget Impac�lOther �
teduce repair and maintenance expenses
Yroduced L'sing tlre Plan-It Capilal Pla�arxing Sofi�rare
Thr�rsdcry. d?arch Ib, ?011
,25.
Capital improvement P1an 201 � lh�-u 2�� 5 Dcpartment Equipment
C�ty of Asden Hills, Minnesota Contact Public Worl:s Directar
Budget lEems 20l 1 2Qt2 2Q13 2014 20I5 Total
Equipment and Vehicle repair -1,000 -1,000 -1,OOD -3,OOD
TOY�I -1,000 -f,000 -1,000 -3,40a
Produced Usfng lJre Pfaia-It Capital Alanniirg Safnvare
77nrrsday. ,'vlarch 10, 201I
-26-
Capital Improvement PIan 2�� 1 lhi-u 2Q� 5 Departmeat Eq�ipment
City of Arden Hills, Minnesota. Contarl Pubiie Works Direcror
PrajeeS # 13-EqpV-01U
rro�e�� �a�� Replace Trailer
Tvpe Equipment
Llseful Life IS-}7
Category Vehicles
Priorilr n!a
To[a[ Project Cost: 510,D00
1996 Redihaul Trailer #I08
VIN 4755122T2V}013037
Justification �
frailer wil[ be 17 years old. It is beginning to deteFiorate. 3'h� replacement ���ill be a muHi-use trailor ahle to be used to hau] the skid-steer
al Maintenance Costs
- $365.37
- $}20
- $0
- $161.38 to date
Expenditures 24i � 2012 20I3 2014 2€I15 Total
EquipNehicleslFumishings 10,000 10,OOp
Total io,000 �a,000
Funding Sources 2011 2012 2013 2014 2015 Total
EquipmenUBuiEding Replacem t�,0�6 10,Ofla
Total to,0oo 10,000
Budget Tmpact/Other
Reduced maintenance eosts.
Pro[hrced Usirrg 11�e Plarr-It CapiFa! Plunning Sofnrare
Thursday. March !0. Z071
-27-
Capital ImprovementPlan 2�11 thru Z�ts Departmen� Equipment
Gity of Arden Hills, Minnesota conta�t Public Worfcs Director
Budget Items 24l I 2012 20I3 2014 2fl15 Total
Equipmeni and Vehicle repair -560 -500 -t,000
Totai •�no -sao -�,000
Prodt�ced Using tlre Plart-fi CQpital Pla�rnrng Softirare
Thursda}'. !l'larch 1 D. 2011
-2$-
Capital �mprovement Plan
City of Arden Hills, Minnesota
Rroject # 15-Eqp-003
r�o��c� �va�,e RegIace 200Q Backhoe
Description �
Equipment #{ 204 - 2000 Case 590 Backi�oe.
V1N # 22642$5353
Hours 2,487,]
#$5204
7usti�cation
Equipment wi]I 6e ] 5 vears oEd_
Repair costs for paris and labor:
2006 - 24437
2007 - 415.45
200$ - $2_933.45
2009 - $250.24
zaio - $2.�».00
20 E]- None to date
2011 thru 2015
Departmeni Fquipment
Contact Puhlic Works I3irector
T}�pr Equipment
l�seful Life 15
Category £quipeneni: Fublic Works
Priorit� n/a
Tolaf ProjectCost: S]OO,EF00
uded in the purehase of the new bae[chae wauld be t�ti�o additon attachable tools; a Rapid-Ram for brea[:ing up i�ost and a!'late Compactor for
p�eEing treches. CurrentEy, the Citv has no equipment for breaking up frost so a contractor is hired for this «arl� at a cost of $3-4 40U per time.
Expenditures 2{l11 20I2 2Q13 201�{ 2015 Total
EquipNehicfesl�urnishings 115,fl00 115,U06
Estimated Trade-!n Vafue -15,000 -15,fl00
Total __ 1U0,000 10q44�
F�rnding Sources 20I I 2012 2013 2€FI9 2Q35 Tatal
Eq�ipment/Building Replacem 100,Q00 100,460
Tota� 1D0,004 100,Oa0
Budget ImpacfJOther
teduce maintenance and repair cosis.
Pr�odr�ced L,'sing tlte Plan-I1 Capilal Plunnrng Sofnrare
-29-
Thursday�. March 10. 2(11I
Capital Improvement P�an
2�11 thru 2Q15
Department Equipment
City of Arden Hills, Minnesota Contact Public works Birector
Budget Ite;ns 2011 2f}rt2 2013 2014 2015 Total
Equipment and Vehicle repair -1,04d -1,5Q0 -2,5Q0
T4t3} -'l,Q00 -1,500 -2,540
Produced C`sing the Plun-11 C'apital Plannr�tg Sofrn°arn
Thrrrsda�_ :'vlurch 10. 2011
-30-
Capital Improvement Plan 2011 th�u 2ols
Aepar[ment Equipment
City of Ard�;n Hills, Minneso#a Consact PubEic Works Director
Project # 12-Egp-001
Pro,�ert 1Vame grush Chipper
Description I
Replace equipr�ent # 426 - 1946 Vermeer Chipper
Vll�i # iVRKl�13-10000799
Hours 4b6.4
#8�426
7ustification
�quipment will be IS ��ears o]cE.
Repair costs for parts and labor:
200b - 1 �0.00
2007 - 142.61
2008 - $47b.63
2049 - $Q
aa�a-$o
zoii
2012
Type Equipment
iTsefull..ife 15-17
Category Equipment Pubiic Wor[:s
Priorih� r�la
Total Project Cosi: $26,SU0
piece of equipment will be 18 y°ears old. However this piec:e of equipmenf is not used often and is in good condition. Condition ��-i11 be
tered ar�d repEacemeni ���ill be adj€�sted xs deemed approiprate.
Expend�tures 2011 2012 2013 2014 2015 Total
EquipNehicleslFurnishings 30,000 30,dOQ
EstimatecE Trade-ln Velue -3,500 -3,5fl0
'Y'otal 26,594 2fi,506
Funding Sources 20] ]
Ec{uipmenUE3uiEding Fteplacem
Total
Budget Impac#/Other
Reduce repair costs.
Prodirced L'sing tJre Plan-1! Capital Pluluring 5ofnrare
2012 2013
2014
2fi,50D
zs,soo
2ai5
Total
26,500
2fi,SQ0
T{�ursda�: :1?arch 10. ?011
-31-
CapitalImp�-ovementPlan z�X1 thru ZQis nepartment Equipmer�t
City of Arden Hi�is, M1E1i1�80�. Contaet PubEic Works Dimctor
Budget Iterr�s 201I 2012 20i3 2014 2015 Totaf
Equipment and Vehicle repatr -20U -200
Total -200 -200
I'rodriced Using 1he Plar�-It Capilul Plannirrg Sofnnare
7l�ursdQ��. d�arcl� 10. 20I1
-32-
Capital Improvemen� Plan �fl� 1 thru zfl� $ De�artmem Equipment
City of Arden Hills, M]IuleSO�. Contact PubEic Works Director
IProject tt 14-EqpV-OOX
Project �a�ne Replace 2002 F450 One-Ton w/Dump/PIow/Sanc�er
Description
Reglace Unit #302 - 2002 Ford P-450
VIN # ]FpXF47F92EC89315
Mileage 45,526
#85302
Justif cation
vfiEeage is 32,951
Jehicie �vill be twe]ve years old.
'ans and Labor repair costs:
'006 - $2.221.02
'.607 - ],691.52
A08 - $2.653.47
:009 - $796.58
!O10 - $2,228.00
!Oi 1 - None to date
!OI2
:OI3
Type Equipment
l'seful Lifc 1�-12
Cafegor}� Vehictes
Priorit�� nla
Total Projcct Cost: �60,000
Vehicte has been adjusted frorn a 70 year replacemenl to a 12 year replacement. Currentl�� sei as a placeholder_ Stai7��e ill continue to monitor
vehicle condition and maintenance eosts.
Expe�ditures 2(11 � 2012 2013 2Q] 4 201 S Total
EquipNehiclesl�urnishirtgs 70,QQfl 7p,000
Estimated Trade-fn Vafue -1d,400 -1p,00�
'�'p�j 60,ao-o 6U,OOD
Funding 5ources 2011 2012 2013 2fl14 2015 Total
EquipmentlBuilding Repfacem 60,000 60,060
T'p{�� 6D,000 60,OQ0
Budget Impac�/Other �
Zeplacing vehicle ���ill reduce repair costs.
Produced Using fhe Alan-1! Cupilal Planning Soflzrare
Thtrrsday. h9arclr 10, ?Ol1
.��_
Capital Improvement Plan 2011 t�,�u 2015
Deparl�nent Equipment
City of Arden Hills, Minnesota Contact Public V��orks Director
Budget ltems 2011 2fl�2 2013 2014 2015 Total
Equi�ment and Vehicle repair -1,000 -1,OOQ
Total -1,DDU -'i,000
Produced Using 11�e Alan-11 Capital Planning Sofl�rare
TFaairsda�•. :'vlarch 10. 20I1
-34-
Capita.l Improvement Plan �01 � thpu 2015 pepartment Equip€nent
City of Arden Hills, Minnesota Contact P¢blic Works Director
Project # 13-Eqp-004
rroject �vame Replace 1997 Street Sweeper
Description �
�quipment # ] OS - 1997 �lgin SEreet S�i�eeper.
JIN # 585165
3oe�rs ],93I.7
vlileage 9_bl p.b
!85105
Justi�cation
Equipmertt wi11 be 18 years o[d.
Repair cosis for parts and labor:
20U6 - $b34.96
2QU7 - $764.53
20a8 - $657_95
zoas - $�.�z�.�z
Za�o - �3sz.�o
Type Equipment
Useful Life 15
Categorp Equipment: Pu61ic Works
Priority n/a
Totxl Project Cast_ �13S,D00
is relaEively good condition and recieves }imited ues �i hich allou s replacement to be p�ashed out to 20I5
his vehicle will be monitored �or hours and repairs and adjusted as needed. Previous sieeper increased maintenance costs substantially aRer
ear I 5.
Expenditures 2Q11 2012 2013 2414 2UI5 Total
EquipNehic]eslF�mishings 150,Ofl0 150,a0fl
Estimated Trade-In VaEue -12,000 -12,400
Total 138,QD0 13$,OaO
Funding Sources 2011 2412 2013 2014 2015 Total
EquiprrtentlB�ailding Replacem 138,fl00 138,OOQ
Total 138,000 138,44U
Budget ImpactlOther
Reduce repair and maintenance casts.
Prodirced L'srng !he Plan-1! Capita! Pla�ani�sg Soflirare
-�rJ-
Tlrrersda�: Marcli 1(1, 20I1
Capital Improvement Plan
City of Arden Hills, Minnesota
Prod:rced L'sing the I'lvn-!t [`aprtal Plannrng 3ofnr�are
2Q11 �hru 2015
Department Equipment
Contact Public Works Director
Tl�ursday. .�larch I0. ?011
-36-
Capit� �rnprovement Plan �� 1� thYu 24 � 5 Department Fquipknem
City of Arden Hills, Minnesota Contact Puhlic Works Director
prolect ft 15-E[�pV-000
Pro�ert Name Replace 2001 Used Dump Truck with Used Durr�p Truck
T��pe Fquipmcnt
t�seful Lifc �
Categnry� Equipment: Public Works
Priorih �!a
DescripEion I Tota1 Project Cost: 540,OOU
In 20} 1 a ased dump trjactc tvith pEow and de-icing eqaipment was addeti to the fleei by purchasing one of Kamse�� Count�'s 10 �•car old vehicles.
In 2015 the 20D1 used dump truck wiEl be replaced the same way with a 2005 ��ehicle fpurchased from Ramsey County.
Justification I
fhe 20D] cl�mp truck wil[ be 14 years olcf. A IO year old used dump tre�ck can be purchased from the Ramsev Count�� �leet.
�xpenditures 2011 2012 2013 2014 2015 Total
EquipNehicleslFurnishings 40,000 40,000
Total 4U,000 a0,000
F�nding Sources 2011 2412 2013 2014 20.15 Total
Capita4 Improvement Funds Ep� 35,000 35,fl00
TOt� 35,OpU 35,UD0
Budget ImpactlOther
Produced Usii�g rhe PIar7-It Capi7al Planni��g 5offlrase
-37-