Loading...
HomeMy WebLinkAbout7F, Consider Purchase of New Water Meter Readers� EN HILLS Request for Council Action Prepared By: Terry Maurer, Council Meeting Date: March 28, 201 I Public Works Director Consider Parchase of New Water Mefer Readers Budgeted Amount: Actual Amount: Funding �o�zrce: $6U,000 $60,000 Water Utility Fund Recommendation: Authorize the expendztuxe o� up to $60,000 ta start tk�e conversion of watex meter readers to the Badger Galaxy System. Supportin� Docuinents: 1. Memorandutn dated March 28, 2011, from Terry Maurer, Public Works Director. . 2. CIP far Water Meter Upgrades. � EN HILLS MEM4RANDUM DATE: March 28, 201� TO: Honorable Mayor and City Councilmembers -' J Patrick Klaers, City Ad�nniuistrator �;��'`� . � � FROM. Terry Mau.rer, Public Werks Director � SUB,IECT: Coa�sider Purchase of New Water Meter Readers Ba _ckground The City's commercial/industrial water meters and readers were replaced in 1997/1998 and the residentiai water meters and readers were replaced in 2Q01. The �neter readers were e�pec#ed to have a 10-11 year life which is currently at its end. The batteries are starting to fail and �echnalagy has changed so much it is hard to g�t replacemex�t batteries or parts. The current system is a remote reading systern whereby a Public Works staff memb�r simply d�ves the street wiih an electronic handheld reader which remotely reads the meters. The City system has approxima#eIy 230 comrnercial/industrial meters and 2,422 residential meters. The Capital Improvemer�t Plarz (CIP} has an item starting in 2011 and running through 2014 to replace all meter readers (a copy of the CIP sheet is attached}. Staff wer�t through a review process to look at sys#ems that are compatible witk� our current meters which should have 15-20 years of life l�ft. The staff recomme�ded system is a Badger Galaxy System ihat allows remot� reading from a camputer screen. When ihe change out af ineter readers is complete, meters will be read from a computer in the Finance Department. There will no longer be a need for a Public Works staff to spend 2-3 days a month reading meters. In the 2011 CIP ti�ere is $64,000 prograrr�ed tio begin this co�version process. With $60,000, staff is recommending purchase af the Badgex Galaxy Fixed Network Collector Package which consists of an antenna lacated on the water tower, computer software and installation, technical support, ce�lu�ar backhaul (device that senc�s the meter reading frorn t�ie antenna to the computer), and 50 meter readers. In addit�on sta£f recomrr�ends purchase of enough comrnerciallindustrial meier readers to change out all of those in 2011 with City staf£ With the remaining funds staff would purchase approximately 50 residential meter readers. These rnrould be used to change out any failed meter readers and/or combine sutnp pump inspections wzt� zx�eter reader change outs. P:lAdminlCouncillAgendas & Packet Iniarmation1201 i13-28-11 Iteg�larlPacket Informationl3-28-11 Water Meter Memo.doc Page 1 of 2 _ ____ _ We are proposing to replace fihe commerciallindustrial rixeter readexs using City staff as they have direci kr�owledge of ineter locations, number of ineters in the bigger accounts, and have established relationshi�s with personnel at our Iarger businesses in ordex to gain acc�ss. In futUre years, staff will likely propose the use of a contractor to change out the residential meter readers to sav� staff time while expediiing ihe conversion. This system does have an annual fee of $2,450 for technical support, software updates, and maintenance of th� cellular backhaul. Thi� annual fee begins the year after the initial purchase o� the system. This annual fee will be included in fixture operating budgets for the Water Utility. Council Ac�ion Requested �t zs �recommended that the City Council authorize the expenditure of up to $60,000 to start the conversion of water inefer read�rs to #he Badger Galaxy System. The 2011 expenditure would be used for tlie Fix�d Network Collector Package, commerciallindustrial meter readers for all 230 custamers and a f�w r�sidential meter readers. The Director of Finance and Adminisirative Services has indicated that there are sufficient reserves in the Watez Uti��ty Fund for the 2011 expenditure and fiiture years. P:lAdminlCauncillAgendas & Packet Information1201113-28-11 RegularlPacket Informationl3-28-11 Water Meter Menao.doc �age 2 of 2 Capita.i Improvement Plan City of Arden Hitis, Minnesota �fojecc # � 1-W-003 PrajecS l�ame Wa�Qr Meter Upgrades 1'ype Improvement iJsefu! Life Categary Utiliry fmprovements 2011 thru 2Q � 5 De�artmeat Waier Depactcnent ConYaet Pubiic Works Director Priority nla De5C�1�tLOII I'otal Pro3ect Cost: $44a,000 � �'hi e Badger Water Meters need to be upgraded for ali commerciai {approximateiy 230) and residential (approximately 2,422}. "f'tie current ; systeEn is obsoleta and batteries are 6eginning to fail. �"ttere are two systems - each witi� differcnt advantages_ Staff wiii be rer+iewing each system and presenting options to Council. Justification fiie cu�rent water me#er system is obsolete and ihey are not making this type of battery any longer. The current water meter bat#eries are >eginning to Paii. Once their sfock �s out, thcre wili be no batceries avaiEahle to cep�ace_ The recommendatian wil! be to incorparate the upgrade n a 3-4 year cycle. The estimate is based on the upfront star[ up costs and commerciat being done in the firsE year_ �xpenditures 2011 �012 2flI3 2fli4 Z015 Totat Other 60,d0U i15,600 315,t3fl0 395,OOa 4{15,OOfl �['p�� fiU,UUO '175,UU0 395,000 315,004 41iS,fl00 Fanding Sources 201i 2012 2013 2014 2015 Total WaterUtilityFunds 60,006 ti5,000 135,00I3 135,000 405,DU4 Total �.�0 115,000 195,U00 195,OU6 d05,664 B�dget ImpactlQther �-4 year implementation plan. ihe two different systems will ha�e various cost savings on stak� time. �'his will be presented with the Produced Using !he Plan-Ct Capita! Plannrng Safhrare ii'ednesdav, t�overnber I0. 2010 73