HomeMy WebLinkAbout04-06-11-PCChair
Clayton Larson
Commissioners
Andrew Holewa
Liz Modesette
Daniel Reiff
Samuel Scott
Roberta Thompson
Clayton Zimmerman
Angela Names (Alternate)
�RZEN HILLS
Arden Hills
Planning Commission
Aril 6 2011
p s
1245 W. Highway 96
Arden Hills, MN 55112
651.792.7800
Www•ci.arden- hiUs.mn.us
City Vision
A strong community that values our unique environment, our fiscal soundness,
and our tradition as a desirable city in which to live, work, and play.
Agenda
Regular Planning Commission Convenes 6:30 PM
Call to Order — Role Call
OATH OF OFFICE: Commissioner Thompson and Commissioner Scott
1. APPROVAL OF THE AGENDA
2. MINUTES
A. March 9, 2011, regular meeting
3. PLANNING CASES
A. Planning Case 11 -005; Preliminary and Final Plat, and Master and Final PUD; Trinity Lutheran Church and
the City of Arden Hills; 3245 New Brighton Road — Public Hearing
B. Planning Case 11 -006; Preliminary Plat and Comprehensive Plan Amendment; PulteGroup and Alliant
Engineering; 4500 Snelling Avenue North — Public Hearing
4. UNFINISHED AND NEW BUSINESS
5. REPORTS
A. Report from the City Council
B. Planning Commission Comments
6. ADJOURNMENT
A quorum of the City Council may be present at this meeting.
Planning Cases are available online at:
http: / /www.ci. arden- hills.mn.us /planningcases
April 6, 2011
Planning Case Map
Planning Case 11-006
Preliminary Plat and
Comprehensive Plan Amendment
PulteGroLip
4500 Snelling Avenue North
' 11101a1PUIP,,,
igallilli dila
AN-wW4v...ipit Ir Ilfr
%11,h, w4re
41,
II
ma LIS mg 1/4
..
Nmam.11111111111111111111111111011111
41%
F41.34,
.... MN Rommons Pri■ 4*
V Illuil magailielial
lanefflos 001404,4
vs
haw moans ILA
AM oammmeno.
0 -
r- ..
:,,,,,,,
11111=
1111111111
iger111111111,
eP
4* 410
10. gOrti
hiENIMMEEN
111111111111111111
1111M1111111117‘11111111111112,
issomasorwAk4
44' w#111111
4ort,
rip
Planning Case 11-005
Preliminary and Final PIat and
Master and Final PUD
Trinity Lutheran Church
3245 New Brighton Road
11111111011111
1111111111111111
111111111111110
11111111111111111110
Created March 29, 2011
by the Arden Hills Planning Department
•
e
- R EEN,HILLS
Approved:
CITY OF ARDEN HILLS,MINNESOTA
PLANNING COMMISSION
WEDNESDAY,MARCH 9,201 l
6:30 P.M. -ARDEN HILLS CITY HALL
CALL TO ORDER/ROLL CALL
Pursuant to due call and notice thereof, Chair Clayton Larson called to order the regular
Planning Commission meeting at 6:34 p.m.
ROLL CALL
Present were: Chair Clayton Larson, Commissioners Roberta Thompson. Andy Holewa.
Elizabeth Modesette, Samuel Scott and Angela Hames(alternate).
Absent: Commissioner Clayton Zimmerman (excused). Commissioner Daniel Reiff
® (excused).
Also present were: City Planner Meagan Beekman; Councilmember Fran Holmes:
Community Development Director Jill Hutmacher; Community_ Development Intern Me]-
Ling Anderson; and Recording Secretary, Tina Borg.
APPROVAL OF AGENDA—March 9,2011
The Agenda was approved as presented.
APPROVAL OF MINUTES
A. January 5,2011 —Planning Commission Regular Meeting
Commissioner Holewa moved, seconded by Commissioner Thompson, to approve
the January 5, 2011, Planning Commission Regular Meeting as presented. The
motion carried unanimously (6-0).
PLANNING CASES
A. Planning Case 11-004; Concept Plan Review; Pulte Development Group; 4500
Snelling Avenue North —Not a Public Hearing
City Planner Meagan Beekman stated the applicant is seeking review and feedback of
their preliminary plat and Comprehensive Plan Amendment (CPA)development plan to
ARDEN HILLS PLANNING COMMISSION—March 9, 201 l 2
3.A. Planning Case 11-004; Concept Plan Review; Pulte Development Group: 4500.Snelling
Avenue North—Not a Public Hearing(continued)
subdivide the property located at 4500 Snelling Avenue North into 39 single-family lots.
Staff is requesting direction from the Planning Commission on whether a PUD
application that includes wetland setbacks in exchange for reduced front yard setbacks
would be something Staff should request the applicant to submit. She provided
additional background information.
City Planner Beekman stated when there is a conflict between a city's comprehensive
plan and a zoning code, the city is required to amend the zoning code to comply with the
comprehensive plan, unless the city approves an amendment to the comprehensive plan.
The Metropolitan Council must approve all comprehensive plan amendments. Staff has
been in communication with the City's Sector Representative at the Metropolitan Council
regarding this property. The Sector Representative has indicated that the Metropolitan
Council could be supportive of a Comprehensive Plan Amendment that would allow the
City to reduce the minimum density required on property guided for Low Density
Residential given the higher density that is anticipated on the TCAAP property.
Chair Larson opened the floor to Commissioner comments.
Chair Larson asked what would be considered the normal wetland buffer in the Cite.
City Planner Beekman stated the city does not have established wetland setbacks. The .
City may be interested in negotiating with the developer for greater wetland setbacks in
exchange for reduced front yard setbacks and reduced right-of-way width. This would
allow the developer to build homes closer to the road and move the homes further away
from the wetlands. The City could then extend its easement area over these areas to
create wetland buffers. Other benefits that are created by this sort of flexibility would
include additional tree preservation since trees in rear yards are more likely to be
preserved than trees in front yards. This would create Iots with larger back yards and
smaller front yards. Moving the homes closer to the road would create an average of a
20-foot wetland buffer versus no buffer which would exist under the current plan.
Mr. Mary McDaris. Division President for Pulte Group. stated Pulte Group supports the
proposal being presented to the Planning Commission at this time. In order to meet the
Comprehensive Plan a higher density would have been required but this would not have
met the code requirements of the City. The current plan meets all of the City's code
requirements and Pulte would make every effort to save as many trees as possible. The
plan does allow for additional trees to be planted, replacing the trees that would need to
be removed. The current proposal allows for a 20-foot structure setback from the
wetlands but Pulte is willing to look at this if that is the direction give by the Planning
Commission. He requested additional feedback from the Council regarding the road
connection at Keithson Drive.
ARDEN HILLS PLANNING COMMISSION—March 9,201 l 3
3.A. Planning Case 11-004; Concept Plan Review; Pulte Development Group: 4500 .Snelling
• Avenue North—Not a Public Hearing(continued)
Commissioner Hames asked what changes were made on the corner of Keithson Drive
since the community meeting. She also asked if this development would require a park
dedication fee.
Mr. McDaris stated the street was rounded out but he could not say if extra boulevard had
been added.
City Planner Beekman explained all subdivisions within the City require a park
dedication. This component could be 10 percent of the value of the project_ 10 percent of
the land, or a combination of these. There are set rules the City must follow regarding the
use of these funds. The funds can only be used to expand or maintain the City's Parks.
The City has not finalized the park dedication component with the applicant and the Parks
and Recreation Committee will be discussing this at the next meeting.
Mr. McDaris stated Rice Creek Watershed would need to review the drainage on the
property. Rice Creek Watershed has received the preliminary plans and they should have
feedback regarding the plan by the April 6 Planning Commission meeting.
Commissioner Scott stated it would be worth looking into increasing the setbacks for the
wetland areas.
• Commissioner Haines asked what other restrictions could be put on the applicant if the
process was moved to a PUD. She also asked if the size of home that could be built on
the property would be different if the front _yard setbacks were moved toward the street.
City Planner Beekman explained a new set of plans would need to be done. With the
PUD process the City would have the flexibility to grant the setbacks that would increase
the wetland buffer and the City's easement.
Mr. McDaris stated he would not be able to determine if the size of home would be
different at this time. Pulte Group would like to move forward with the plans being
presented at this time and not go through the PUD process. He explained Pulte Group
would be willing to work with the City regarding the wetland buffer and not have to go
through the PUD process. He explained moving the homes closer to the street would
change the feel of the neighborhood. The plan being proposed meets all the City_ 's
requirements and should be able to move forward.
Commissioner Thompson stated she would like to know what the Rice Creek Watershed
District has established for wetland setbacks. She also expressed concerns about the
drainage of the property from lot to lot.
Commissioner Modesette asked for clarification regarding the wetland protections for
delineated and non-delineated wetlands.
ARDEN HILLS PLANNING COMMISSION—March 9,201 l 4
3.A. Planning Case 11-004; Concept Plan Review; Pulte Development Group; 4500 Snelling
Avenue North—Not a Public Hearing(continued) •
City Planner Beekman stated the delineated wetlands are protected. The wetlands are
delineated by vegetation. The City could choose to protect the wetlands beyond the point
of delineation. Under the current proposal there is no buffer between the delineated line
and where the grading and construction will take place
Commissioner Modesette asked if the community would understand that the wetlands
would need to remain in its natural state and could not be altered. She suggested the City
consider doing something more than placing temporary stakes in the ground to show
property owners the starting points of the wetlands.
City Planner Beekman stated once the plat was approved the City would not issue any
building permits for the wetland areas. This would ensure no sheds or other structures
would be constructed in the wetlands. She also explained there are several ways the City
could communicate to the residents about not disturbing the wetlands and where this area
is.
Chair Larson suggested Mr. McDaris provide sample building materials for the Planning
Commission to review at the April 6, 2011, meeting. He also stated he would like to
know the average valuation for the surrounding neighborhoods so that the $400.000
valuation for this neighborhood can be compared to the surrounding area.
Chair Larson asked for clarification regarding the lot layout for lot 10.
City Planner Beekman stated that as the original owner sold off parcels of land there were
several odd shaped parcels remaining. The exact reason for this particular parcel is not
known. The shape suggests the original owner may have thought this area may be needed
for a road or trail.
Commissioner Scott asked if a small structure could be built on the section of lot 10 that
is in between the neighboring properties.
City Planner Beekman stated that the size of this section of property does allow for a
structure to be built there.
Commissioner Scott suggested Pulte Group look at redefining the properties and
removing the section of land that is between the neighboring two lots and splitting this
between these two properties. This way the owner of lot 10 would not be able to
construct a building in between two homes.
Commissioner Thompson asked if there had been any discussions regarding an area the
City could use for park or green space.
City Planner Beekman stated there is not a strong interest for the City to take on
additional park land at this time. The Parks Department is more interested in trails to
connect the existing parks so the current parks are used more.
ARDEN HILLS PLANNING COMMISSION—March 9, 2011 5
3.A. Planning Case 11-004; Concept Plan Review; Pulte Development Group; 4500 Snelling
Avenue North—Not a Public Hearing (continued)
Commissioner Holewa clarified the PUD process would provide the most protection to
the wetlands.
City Planner Beekman stated this was correct.
Commissioner Modesette explained she would like to know what Rice Creek Watershed
has to say about the wetlands and the current proposal before she supports increasing the
buffer area.
Chair Larson explained the 20-foot setback and using signs to identify the wetland areas
should be adequate for protecting them. He expressed concerns about having the homes
closer to the road and how this would look when compared to the surrounding
neighborhoods.
City Planner Beekman stated the last couple of developments the City has approved have
had reductions in front yard setbacks. The reduced setbacks do give the neighborhood a
different look but the City has not seen any adverse effects of this.
Commissioner Holewa pointed out the homes on the other side of the street from the
proposed development would have the standard 40-foot setbacks.
• Commissioner Modesette stated it would be helpful to have a better understanding of how
the hydrologic drainage pattern and how this is accommodated in the future for the April
6, 2011 meeting.
Commissioner Hames requested Staff to discuss with the applicant the possibility of
increasing the rear setbacks so that the project would not have to through the PUD
process. This would maintain the 40-foot front yard setbacks and protect the wetlands in
the back. A 40-foot setback does allow residents to construct a front porch_ which is
something the City would like to encourage.
Chair Larson closed the floor to Commissioner comments.
City Planner Beekman clarified the Planning Commission would be interested in a buffer
for the wetlands while maintaining the 40-foot front yard setbacks.
B. Planning -1
Case 'c1 005Tr-eliminary and T.• l Plitt, d--Manic,--and Final PUD-;
Trinity Luther-on Chureh; 3245 New Brighton Road—TABLED to April 6, 2011
Commissioner Holewa moved and Commissioner Thompson seconded a motion to
Table Planning Case 11-005; Preliminary and Final Plat, and Master and Final
PUD; Trinity Lutheran Church; 3245 New Brighton Road to the April 6, 2011,
Planning Commission Meeting. The motion carried unanimously (6-0).
UNFINISHED AND NEW BUSINESS
ARDEN HILLS PLANNING COMMISSION—March 9,2011 6
A. Year-End Review '
City Planner Beekman stated the Community Development Department is responsible for a
variety of services, including planning and zoning economic development,protective inspections.
code enforcement, and residential recycling services. She reviewed the following
accomplishments for the Community Development Department for 2010:
1. Processed twelve planning cases incorporating 23 land use requests
2. Completed three planning cases carried over from 2009
3. Reviewed and approved six code amendments
4. Adopted zoning classifications, regulations, and a Master and Final PUD process for the
TCAAP property
5. Processed a tax increment financing application from Presbyterian Homes
6. Transitioned to a new Community Development Director
7. Extended the Eureka Recycling curbside recycling service contract for an additional two
years
8. Issued building permits for five new single family homes
9. Processed 1,075 permits with a total valuation of$15,676,327
10. Reviewed 277 code enforcement cases and closed 258 cases
11. Completed Zone 2 and all commercial building sump pump inspections
12. Completed abatement of hazardous structure
City Planner Beekman explained the International Property Maintenance Code has been
helpful with the abatements the City has done. There is an opportunity for the City to do
more in this area. •
Commissioner Thompson asked if the City has seen any benefits from the rental registrations.
City Planner Beekman stated the information has helped the City in identifying the
responsible party for the property. There were fewer registrations in 2010 than there were
2009 and this may be due in part to the transition in internal Staff but Staff will be focusing
on this in 2011.
REPORTS
A. Report from the City Council
Council Member Holmes updated the Commission on recent City Council actions
including the approval of Planning Case 10-011, Planning Case 11-003. Planning Case
H-002. and Planning Case l 1-001. The Council unanimously voted to appoint Nicholas
Tamble to the City Council and the City Council voted to pass a resolution directing Staff
to work with Ramsey County as needed to support the due diligence being done in
regards to a possible multi-use stadium on the TCAAP property. She stated several of the
Councilmember had been present at the American Red Cross ribbon cutting. The City is
still working with MN/Dot regarding the 1694 project. The City had denied Municipal
Consent regarding this project. Construction is expected to begin in 2011 for the 1694
project and 2012 for the Highway 10/County Road 96 project.
ARDEN HILLS PLANNING COMMISSION—.March 9, 201 l 7
B. Planning Commission Comments and Requests
City Planner Beekman reminded Commissioners they had received an online password to
participate in a Land Use online course. She encouraged the Commissioners to
participate in this.
City Planner Beekman stated there was a work session scheduled for March 28. It will be
held with the City Council prior to the City Council meeting.
ADJOURN
Commissioner Holewa moved, seconded by Commissioner Thompson, to adjourn
the March 9, 2011, Planninp_ Commission Meeting at 8:01 p.m. The motion carried
unanimously (6-0).
i
•
� DI�EN HILLS
MEMORANDUM
DATE: April 6, 201 I PC Agenda Item 3.A
p � g
TO: Planning Commission
FROM: Mei -Ling Anderson, Community Development Intern
Meagan Beekman, City Planner
SUBJECT: Planning Case #11 -005 - This application requires a PUBLIC HEARING
Applicant: Trinity Lutheran of Lake Johanna and City of Arden Hills
Property Location: 3245 New Brighton Road
Request: Preliminary and Final Plat, Master and Final Planned Unit Development
Requested Action
The applicant, together with the City of Arden Hills, has requested a Preliminary and Final Plat
and Master and Final Planned Unit Development (PUD) to allow for the subdivision of the
property located at 3245 New Brighton Road. The City is currently negotiating with the
applicant to purchase the subdivided parcel and permanently consolidate it with Hazelnut Park.
Background
1. Overview of Request:
Trinity Lutheran Church is located at 3245 New Brighton Road. The property is a four and a
half acre parcel surrounded on two sides by Hazelnut Park. a City -owned park property. The
Church property is zoned R -2. Trinity Lutheran Church and the City of Arden Hills are in
the process of negotiating a purchase agreement for the sale of a 71,474 square -foot section
of land that would be subdivided from the Church's existing property. This subdivided
parcel would be consolidated with Hazelnut Park and maintained as parkland for the public
(Lot 2). The eastern portion, consisting of 127.614 square feet, would remain under the
Church's ownership (Lot 1).
Located within the parcel currently owned by Trinity Lutheran Church is a congregation hall,
parking lot, soccer field, identification sign for Hazelnut Park. and trail entrance to the park.
Hazelnut Park contains a large variety of recreational facilities and is a heavily used park.
The City has a contract with the Church for the shared use of the parking lot, which acts as
City of Arden Hills
Planning Commission Meeting. for April 6, 2011
Page 1 of 7
the only designated parking area for Hazelnut Park, in exchange for $1 ,000 per year in shared
snow plowing expenses. In addition, the City restripes the parking lot after it has been seal
coated as well as provides sporadic repairs as has been needed from time to time. No other
agreements currently exist that formalize the City's use of any other aspects of the Church's
property. In the past, the City has used the soccer field for programming; however, in recent
years the condition of the field has made it undesirable for scheduled events. Because the
City does not own the field, it has not been invested in with regular maintenance, irrigation,
or fertilization, as would be done with a City -owned field.
In 2009, the Church approached the City to discuss the sale of a portion of their property.
The Church does not get frequent use out of the portion currently used by the City and is
interested in selling the parcel in order to raise capital for renovations on the Church site.
The land area proposed to be sold would include the trail entrance to the park, soccer field,
and identification sign to the park. By purchasing the land and incorporating it into Hazelnut
Park, the City can ensure that the use of that park remains intact in perpetuity. In addition to
the sale of the land, the Church has agreed to formalize a shared parking agreement, which
will be recorded against the property, ensuring designated parking for the park into the
future.
The City Council reviewed this proposal at two work sessions in 2010. In addition, the
City's Financial Planning and Analysis Committee (FPAC) discussed this proposal at their
June 8 meeting. At that meeting the committee indicated that the purchase of additional
parkland made good long -term sense for the future of this park: however. they acknowledged
that the price of the land should weigh into the decision. The PTRC has also discussed this
proposal and supported the City purchasing additional parkland if it was found to be
financially feasible. At their September 20, 2010, work session, the City Council directed
staff to move forward with the purchase of approximately 70.000 square feet of land at a
purchase price of three dollars per square foot.
2. Project Description
The application consists of four components; a Preliminary Plat. Final Plat, Master PUD and
Final PUD. The Preliminary and Final Plat is necessary to subdivide the property and file the
subdivision with the County recorder. Subdividing the current parcel into the two proposed
lots would cause the Church's remaining property to become non - conforming within the R -2
District since it would reduce the required amount of landscaped coverage on their parcel.
Therefore, the applicant must receive a Planned Unit Development (PUD) in order to proceed
with the subdivision and allow for the reduction of landscaped coverage. The City's 2030
Comprehensive Plan does not reflect a change in the zoning or land use designation of this
parcel.
Subject to the successful signing of a purchase agreement and closing, the City and the
Church will also enter into formal agreements regarding the use and maintenance of the
Church parking lot. The current conditions of the potential agreement state that the City
City of Arden Hills
Planning Commission Meeting for April 6, 2011
Page 2 of 7
would have full access to the parking lot in perpetuity. In return. the City will continue to
pay Si ,000 per year for snow removal and repairs. Because the maintenance agreement is
not recorded with the County it will be able to be amended from time to time as necessary.
The applicant has submitted an application and Preliminary Plat illustrating the proposed
subdivision of land (Attachment A)
2. Planned Unit Development (PUD) Process
The PUD process is a tool that provides additional flexibility for developments that could not
otherwise be developed in the manner allowed in the underlying zoning regulations. For
example, a PUD may change the setbacks, lot coverage, lot sizes, parking requirements,
signage, building height, building materials, landscaping requirements. etc. The process is
meant to create a better development than the standard regulations may otherwise allow. The
PUD process allows the City to negotiate certain aspects of the development; however, any
conditions imposed on the PUD must have a rational basis related to the impacts of the
development. While each PUD process is unique, it is a common process used by many
cities. The PUD process cannot be used to permit uses that would not otherwise be permitted
in the underlying zone.
3. Surrounding Area:
Direction
Future an Use Plan Zoning Existing Land Use
North
Park and Open Space; Low
Density Residential
R -2 Single and Two Family
Residential District
Park and Open Space; Low
Density Residential
South
Low Density Residential
R -2 Single and Two Family
Residential District
Low Density Residential
East
Low Density Residential
R -2 Single and Two Family
Residential District
Law Density Residential
West
Park and Open Space; Low
Density Residential
R -2 Single and Two Family
Residential District
Park and Open Space; Low
Density Residential
4. Site Data:
Future Land Use Plan:
Existing Land Use:
Lot Size:
Topography:
Public and Institutional; Park and Open Space
Neighborhood Business; Park and Open Space
R -2 Single and Two Family Residential District
4.5704 acres ( 199,088 square feet)
The parcel is generally flat
City of Arden Hills
Planning Commission Meeting for April 6, 2011
Page 3 of 7
Plan Evaluation
1. Zoning Regulations
This application is unique because the request is regarding the use of a building and site that
is already developed. The proposed plat meets all Zoning Code requirements except that the
subdivision would violate the coverage requirements outlined for the R -2 district.
Chapter 11— Subdivision Ordinance — Meets Requirements
The Proposed preliminary plat meets all requirements of the City's subdivision
requirements.
A. Easements — Section 1130.05 Subd. 5
An 11 -foot wide pedestrian pathway has been incorporated into Lot 2 of the preliminary
plat, which would connect the parking lot of the Trinity Lutheran property to Hazelnut
Park. This exceeds the 10 -foot width recommendation for pedestrian easements under
the Subdivision Ordinance.
B. Public Use Dedications — Section 1130.08, Subd. 2
The subdivision of the existing property would exceed the requirement to dedicate public
land for recreation or conservation, as Lot 2 would be combined with Hazelnut Park.
Section 1320.03 — Allowable Uses — Meets Requirements
Trinity of Lake Johanna will continue its conditional use as a house of worship in the R -2
district.
Section 1320.06 — District Requirements Chart — PUD Required
A. Lot Size, Building Coverage, and Landscaping:
Lot 1 of the proposed plat does not comply with the minimum landscaping requirements
outlined in Section 1320.06. Lot 1 would have 43.9 percent landscaped coverage when
65 percent is required by Code. Lot 2 complies with both coverage requirements. The
reduction in landscape lot coverage for Lot 1 is necessary in order to transfer Lot 2 to the
City for the purpose of additional parkland and open space to be held in perpetuity. The
overall impervious surface on the properties would not increase because of this
application.
City of Arden Hills
Planning Commission Meeting for April 6, 2011
Page 4 of 7
B. Setbacks:
Setbacks are not being impacted by the proposed plat.
Section 1325 — General Regulations
A. Accessory Structures — Section 1325.01 Subd. 3 and Subd. 4
The two garages located in the rear yard of Lot 1 are in compliance with the required
location and size of accessory structures in the R -2 district.
B. Parking — Section 1325.06 — Meets Requirements
The subdivision will not impact off - street parking requirements in the Church's lot. The
Code requirement that specifies a 5 foot setback between the parking area and the side
yard lot line is reflected in the proposed plat.
Findings of Fact
The Planning Commission must make a finding as to whether or not the proposed application
meets the requirements of the Zoning Code, advances the goals and principles within the 2030
Comprehensive Plan, and would adversely affect the surrounding neighborhood or the
community as a whole. Staff offers the following ten findings for consideration:
General Findings:
1. Parks are a permitted use in the R -2 District
2. The proposal is not anticipated to adversely impact nearby properties through nuisance.
noise, dust, glare, or unsightliness, and will not otherwise adversely impact the health,
safety, and welfare of the community. No construction activity is anticipated as a result
of this application, and the sale of the property to the City will increase the City's
parkland and open space area.
3. The proposal would not increase parking and traffic on the site compared to existing
conditions. In addition, the City will continue to provide maintenance and snow removal
for the parking area subject to a successful signing of a purchase agreement and closing.
4. The proposal is in keeping with many of the principles listed in the 2030 Comprehensive
Plan to develop and encourage use of park space.
5. There are no delinquent property taxes, special assessments, interest, or City utility fees
due upon the subject parcel.
City of Arden Hills
Planning Commission Meeting for April 6, 2011
Page5of7
Lot Size
Building
Coverage (sf)
% Building
Coverage
Landscaping
Coverage (sf)
yo
Landscaping
Lot 1 - Trinity Lutheran
127,614
9,441
7.40%
55,995
43.88%
Requirement
11,000 or more
25% or less
65% or more
B. Setbacks:
Setbacks are not being impacted by the proposed plat.
Section 1325 — General Regulations
A. Accessory Structures — Section 1325.01 Subd. 3 and Subd. 4
The two garages located in the rear yard of Lot 1 are in compliance with the required
location and size of accessory structures in the R -2 district.
B. Parking — Section 1325.06 — Meets Requirements
The subdivision will not impact off - street parking requirements in the Church's lot. The
Code requirement that specifies a 5 foot setback between the parking area and the side
yard lot line is reflected in the proposed plat.
Findings of Fact
The Planning Commission must make a finding as to whether or not the proposed application
meets the requirements of the Zoning Code, advances the goals and principles within the 2030
Comprehensive Plan, and would adversely affect the surrounding neighborhood or the
community as a whole. Staff offers the following ten findings for consideration:
General Findings:
1. Parks are a permitted use in the R -2 District
2. The proposal is not anticipated to adversely impact nearby properties through nuisance.
noise, dust, glare, or unsightliness, and will not otherwise adversely impact the health,
safety, and welfare of the community. No construction activity is anticipated as a result
of this application, and the sale of the property to the City will increase the City's
parkland and open space area.
3. The proposal would not increase parking and traffic on the site compared to existing
conditions. In addition, the City will continue to provide maintenance and snow removal
for the parking area subject to a successful signing of a purchase agreement and closing.
4. The proposal is in keeping with many of the principles listed in the 2030 Comprehensive
Plan to develop and encourage use of park space.
5. There are no delinquent property taxes, special assessments, interest, or City utility fees
due upon the subject parcel.
City of Arden Hills
Planning Commission Meeting for April 6, 2011
Page5of7
6. The utility, sewage, and pedestrian easement requirements are met by the proposed plan.
Planned Unit Development Review Findings:
1. The Master and Final PUD process allows flexibility with the implementation of the
City's subdivision and zoning regulations.
2. All Zoning requirements are met by the proposed plans with the exception of landscaped
lot coverage for Lot 1.
3. The land to be transferred to the City will remain as parkland and open space in
perpetuity.
4. No additional impervious surface will be constructed as a result of this application.
Staff Recommendation
Staff recommends approval of Planning Case #11-005 for a Preliminary and Final Plat, and
Master and Final PUD at 3245 New Brighton Road subject to the following conditions:
1. The approval of the purchase agreement by the City Council.
2. The applicant shall file the Final Plat with Ramsey County within 180 days of City
approval, or the approval for the Final Plat shall expire, unless extended by the City
Council prior to the approval's expiration. Extension requests must be submitted in
writing to the City at least 45 days prior to the expiration date.
3. A shared parking lot agreement shall be signed by the property owners and the City
granting the City perpetual use of the Church's parking lot for Hazelnut Park users,
and recorded with the County
4. A parking lot maintenance agreement shall be signed by the property owners and the
City, and filed at the City.
Options & Proposed Motion Language
1. Recommend Approval with Conditions: Motion to recommend approval of Planning Case
11 -005 for a Preliminary and Final Plat, and Master and Final PUD at 3245 New Brighton
Road based on the findings of fact and the submitted plans as amended by the conditions in
the April 6, 2011, planning case report.
2. Recommend Denial: Motion to recommend denial of Planning Case 11 -005 for a
Preliminary and Final Plat, and Master and Final PUD at 3245 New Brighton Road based on
the following findings: findings to deny should specifically reference the reasons for denial
and why those reasons cannot be mitigated.
3. Table: Motion to table Planning Case 11 -005 for a Preliminary and Final Plat, and Master
and Final PUD at 3245 New Brighton Road: a specific reason and information request
should be included with a motion to table.
City of Arden Hills
Planning Commission Meeting for April 6, 2011
Page 6 of 7
Notice
Notice was published in the Arden Hills /Shoreview Bulletin and notice was prepared by the City
and mailed to residents within three - hundred fifty (500) feet of the subject property.
Public Comments
The City has not received any public comments as of the writing of this memo.
Deadline for Agency Actions
The City of Arden Hills received the completed application for this request on February 7. 2011.
Pursuant to Minnesota State Statute, the City extended its review deadline an additional 60 days.
The City must act on this request by June 7, 2011 (120 days). The City may extend the review
period beyond the initial 120 days, with the consent of the applicant.
Attachments
A. Application and Preliminary Plat
City of Arden HJlls
Planning Commission Meeting for April 6, 2011
Page 7 of 7
Attachment A
Application and Preliminary Plat
-`i�EN. HILLS
April 6, 2011. Planning Commission Meeting
,1'ri■jeds,10231,10230.th■g, 01117,2011 01:10:32 1,1
SECTION 33, T3ON, R23W
DRAINAGE AND U TILI TY EASEMENTS
ARE SHOWN THUS:
BEING 12 FEET IN WIDTH AND ADJOINING
STREET UNES AND .6 FEET IN W/DThl AND
ADJOINING LOT LINES, UNLESS OTHERWISE
SHOWN HEREON
PREPARED FOR:
PAT NYGAARD
TRINITY LUTHERAN OF LAKE JOHANNA
3245 NEW BRIGHTON ROAD
ARDEN HILLS, MINNESOTA 55112
651-633-3698
TLIMi?4FOUS
FN.°.
PRELIMINARY PLAT OF
TRINITY LLITHEKAN OF LAKE JOHANNA ADDITION
CITY OF ARDEN HILLS, RAMSEY COUNTY, MINNESOTA
, •
0,o0.o60 66
vcr,
VICINITY MAP
(NO SCALE)
ZONING REQUIREMENTS
stlik \
coet \
TRINITY 1050ERAN OF LAKE JOHANNA
3245 NEW BRIGHTON ROAD
ZONED R-2 - SINGLE No-FAmiLy -RESIDENTIAL DISTRICT
HouSE OF AORSHIP IS A CONDIT.. uSE
urN8.14 LOT AREA - 11,00 SO. FT.
Amman/ LOT vADT14 - NONE
MINIUM( LOT DEPTH - NONE
MAXIMUM a0OR AREA RATIo - 0.3
imam.* LOT coy.", BY SiRuCNRE - 252
MINIMUM LANDSCAPE LOT AREA - 65X
MAXIMUM HOGHT - 35 FEET
BUILDING SETBACKS:
FRONT - FEET
REAR - 30 FEET
AcCESSORT STRUCTURES,
ACCESSORY STRUCTURES SHALL NOT EXCEED
1STRIVE4 OTIES HAD GHTSOIT.TIIPal -IMRPAL
rS LOKR
ZREESrOTES=TUTWAN'Illi 1F=ARD
SETBACK uNE FOR RC PRINOPAL STRUCTURE TO
MHICH IT iS ACCESSCRY
143CEITOR,:rf. SiNTRU,CTURES StA4ALL NOT EXCEED
THE TOTAL FLOOR AREA OF ACCESSCRY STRUCTURES
LOCATED tN THE REAR OF A PRINOP. STRUCTURE
ELITFPRIZZE4 14,9" ls'IRRAPP
moREi oirmoNor.o io:g.:zssoRY STRUCTURES SHALL
SIDE SETBACK - 10 FEET
REAR SETBACK - TO FEET
PARKING REOUREMENTS:
No oFF-sTREET SPACE. Vd. THE
EdGEPTION or .E DRIVEWAYS. SHALL . VARON
20 FEET OF THE RIGHT-OF-WAY UNE Of ANY
PUBUC STREET
IN NO CASE SHALL OFF-STREET PARKING AREAS
Tr.1:11V Act= Tat.olUrssER
PARKING REOUREMENTS,
I SPACE FOR EVERY 3 SEATS (BASED ON DESIGN
CAPACITY)
(AS RER ow or ART. HILLS ZONING COM
LEGEND
pp° POwER POLE
fu CA FIRE AnDRANT
tr. UGHT POLE
GAS vETEIII
AIR CONDITIONER
sOni
we CI uut. Box
- OH - OvERHEAD uNES
- SS - SANITARY SEMER
- W - wAtEe umn/sEevicE
- G - GAS MAIN/SERVICE
DENOTES DIMENSION
OA) MEASURED DURING THE
COuRSE OF THIS SURvEY
DENOTES RECORD
DRAENSION AS PER PLATS
(R) OF AUD. SUBD. NO. 80 de
ULKE JOHANNA PARK AND
LEGAL DESCRIPTIONS
DENOTES SET SURVEY
/
OTLAANOUS PATHWAY
S 88-37'26°
6.13
EXISTING LEGAL DESCRIPTION
ril"." 15 30
1 INCH EQUALS 30 FEET
3.5 FOR BEARINGS
RAMSEY COUNTY
COORDINATE SYSTEM
grAt'REPA' Z2 or,
rLIV=ENJEL`,R1=
ITreSPOITITON
MORTGAGE DEED DOCUMENT NO. 2505562
Parcel A:
That part of Lot 33. Auditor's Subdivision No. 80, lying East of the Vie. 190
feet thereof, and lying North of the South 1320 feet of the Southwest % of
Section 33, Township 30, Range 23 and lying Southerly of a line described as
follows:
Beginning at a point on the center line of New Brighton Road distant 1947 feet
Northerly from said South line of Southwe. 14. measured on said center line;
thence running Southwest at right angles to said tenter line 118 feet; thence
deflecting on a curve to the right. radius 554.67 feet for a distance of 143.65
feet more or less to the intersection with the East line of said West 190 feet
of Lot 33; said center line of New Brighton Road being a line running
Northwesterly at an angle of 63 degrees 379 to said South line of Southwest 'A
from a point thereon distant 30.4 feet West of the Southeast corner thereof,
subject to New Brighton Road.
7,3
LOT 2 I
NOTE: PROPOSED LSa0T-. 2F3.T006BE "
.60:1.140A: NcAPRESPrER:331.1
EAST "NE 1 I
1E: I
COMBINED WITH TY 0
IN T PARK
5
Parcel 8:
That part of Lot 33. Auditor's Subdivision No. 80. Ramsey County. Minnesota,
lying within the Southwest 8, Section 33, Township 30, Range 23, Ramsey County.
Minnesota described as follow.
Beginning at a point on the center line of New Brighton Road, distant 1947.0
feet Northerly from the South line of said Southwest 3C, measured on said center
line. sold center line of New Brighton Road. being a line run Northwesterly at
an angle of 63 degrees 3731' to said south line of Southwest A from a point
thereon, distant 30.4 feet West of the Southeast comer thereof; thence running
Southwesterly at right angles to said center line. a distance of 118.0 feet;
thence deflecting on a curve to the right, radius 554.67 feet, a distance of
143.65 feet, more or less, to an intersection with the East line of the West
190.0 feet of said Lot 33; thence running South along said East line of the West
190.0 feet of Lot 33. a distance of 325.42 feet, more or less. to a point on the
North line of Block 1. Lake Johanna Park. as platted; thence running West along
said North line of Block 1, Lake Johanna Park, as plotted. a distance of 150.0
feet, to the East line of Prior Avenue. as platted; thence running North along
the East line of Prior Avenue. produced North a distance of 173.85 feet; thence
running on a curve to the right, having a central angle of 24 degrees. 55, and
a radius of 158.42 feet, a distance of 68.89 feet; thence nmning Northeasterly
on a tangent to curve last described. a distance of 184.42 feet; thence running
on o curve to the right, having a central angle of 38 degrees 54', and a radius
of 99.11 feet, a distance of 67.29 feet; thence running Northeasterly on a
tangent to curve last described, a distance of 213.0 feet, to an intersection
with the center line of New Brighton Rood. at a point. distant 2087.0 feet
Northerly from the South line of said Southwest N. Measured on said center line,
said center line of New Brighton Road being a line run Northwesterly ot an angle
of 63 degrees 37W to said South line of Southwest A from a point thereon
distance 30.4 feet West of the Southeost comer thereof: thence running
Southeasterly, with said center line of New Brighton Rood, a distance of 140.0
feet, to the point of beginning.
25f.'
AREA SUMMARY
DOSTING PROPERTY AREA e. 1:943:84 SO. FT. OR
CHURCH FOOTPRINT = .620 SQ. FT.
GARAGE FOOTPRINTS = 821 . FT.
BITUMINOUS PARKING LOT = 61,567 SO. FT.
CONCRETE GARAGE N.ITON 231 SCL
CONCRETE WALKS de STOOPS = 3.489 SO. Ff.
BRIM PATIOS = 325 SO. TT.
BITUMINOUS PATHWAY = 1,165 SQ. Fr.
TOTC1.831.PE56,RgeSEIRJR4AZEZNERAGE 76.218 S. FT.
PROPOSED LOT 1 = 127.614 FT. OR 2.9296 ACRES
PROPOSED LOT 2 = 7,474 SO. , OR 1.5408 ACRES
NORTHERLY DOENSION
410ZEA'SjIEUNE "
UES WHIN FLOOD ZONE r (AREAS DETERMINED TG BE OUTSIDE
THE 0.2X ANNUAL CHANCE FLOODPLAIN) ACCORDING TO THE FEDERAL EMERGENCY
.21:1T3tNO'ClI16 rilNAILCLC") VrA31:.1ARA" tt:Jt4=17NlYS:Tra "1"*ER
15•
u TiUTY EASEMENT
KEMPER & ASSOCIATES INC. -
PROFESSIONAL LAND SURVEYORS
721 OLD HIGHWAY 8 N.W.
NEW BRIGHTON, MINNESOTA 55112
651-631-0351
FAX 651-631-8805
email; kemper@pro-ns.net
www.kempersurveys.com
43'
490;49-*
1. •'" vcsr uta n4E
SOUTHEAST QUARTER OF
THE SOUTHWEST GUARTER
OF SEC. 33, T3ON. R23W
CERTIFICATE OF SURVEY
(1.30.0.) 0.13. TODD NOLEN
IRON PIPE
rutZgest`L,,T...03:No.
NOTE: THE PLAT OF LAKE
JOHANNA PARK OVERLAPS
AUDITOR'S SUBDIVISION NO. 80
BETWEEN 9.58 AND .28 FEET
15. SEVER EASEMENT
(DM. N. 1563050)
SS - CrLIEUIEOHtdtt 50R1K
SOU. UNE OF
GOVERNMENT LOT 4 OF
SEC. 33. T3ON. R23W
PROPOSED
6• DRAINAGE &
U r LITY EASEMENT
457..
VTGEUAZOUS
.44
DOA
144:CE
01. `,,u8U44:tja%1/41.P 4"(
D's
--FOU50-1AZ
IRON PIPE - - -
00S5) -
CHAIN
01 6.,491°Cf4a, ;."16(
lot
"
4.-3*-24;
FOUND 1/2.
P1NOAED
--RON
LOT 5.,„stAaL°Q(1■:A"."(
tOtE
pS1;,6
030 11:C350;PC" *COO
‘ENCE ,E1YCE
-S 895625*
Lil4 131-° i3ARK
E .JOH,'""A 1
eff,
oww,,
• 395E25' E 1319.61
-
NCE
I 01 8")CKALPW'
jovoNt4 o02.2
1*P
potimb,s,
usr 1. 130°' 1. PAK
LAKE XSAWA
CERTIFICATION
101=01;rPrEAPLEVS13Ari PLAN.
1,1NDER MY DIRECT SUPERVISION AND .AT
SUIVEAY &CUL DER TrE LA. OF ZEAL-STATE
OF laNNESOTA.
uARK D. KIDAPER, PLS 18407
DATED INIS DAY OF 2010
KEMPER & AssociarEs.
AM 1 01:22:05 PNI
TRINITY LUTHERAN OF LAKE JOHANNA ADDITION
KNOW ALL MEN BY THESE PRESENTS: That Trinity Lutheran of Lake Johanna, a Minnesota corporation, owner of the following described property situated in City of Arden Hills
the City of Arden Hills, County of Ramsey, State of Minnesota:
Parcel A:
We do hereby certify that on the day of , 20 . the City Council of the City of Arden Hills, Minnesota, approved this plat.
That part of Lot 33, Auditor's Subdivision No. 80, lying East of the West 190 feet thereof, and tying North of the South 1320 feet of the Also, the conditions of Minnesota Statutes, Section 505.03, Subd. 2, have been fulfilled.
Southwest % of Section 33, Township 30, Range 23 and lying Southerly of a line described as follows:
Beginning at a point on the center line of New Brighton Road distant 1947 feet Northerly from said South line of Southwest %, measured on said
center line; thence running Southwest at right angles to said center Inc i 118 feet; thence deflecting on o curve to the right, radius 554.67 feet for
a distance of 143.65 feet more or less to the intersection with the East line of said West 190 feet of Lot 33; said center Inc i of New Brighton
Road being, a line running Northwesterly of an angle of 63 degrees 37W to said South line of Southwest ) from a point thereon distant 30.4 feet Mayor , City Administrator
West of the Southeast corner thereof, subject to New Brighton Road.
Parcel B:
That part of Lot 33, Auditor's Subdivision No. 80, Ramsey County, Minnesota, lying within the Southwest %, Section 33, Township 30, Range 23,
Ramsey County, Minnesota described as follows:
Beginning at a point on the center line of New Brighton Road, distant 1947.0 feet Northerly from the South line of said Southwest X, measured
on said center line, said center line of New Brighton Road, being a line run Northwesterly at an angle of 63 degrees 371h' to said South line of
Southwest X from a point thereon, distant 30.4 feet West of the Southeast corner thereof; thence running Southwesterly at right angles to said
center line, a distance of 118.0 feet; thence deflecting on a curve to the right, radius 554.67 feet, a distance of 143.65 feet, more or less, to
an intersection with the East line of the West 190.0 feet of said Lot 33; thence running South along said East line of the West 190.0 feet of
Lot 33, a distance of 325.42 feet, more or less, to a point on the North line of Block 1, Lake Johanna Park, as platted: thence running West
along said North line of Block 1, Lake Johanna Park, as platted, a distance of 150.0 feet, to the East line of Prior Avenue, as platted: thence
running North along the East line of Prior Avenue, produced North a distance of 173.85 feet; thence running on o curve to the right, having a
central angle of 24 degrees, 55', and a radius of 158.42 feet, a distance of 68.89 feet; thence running Northeasterly on a tangent to curve last
described, a distance of 184.42 feet; thence running on a curve to the right, having a central angle of 38 degrees 54', and a radius of 99.11
feet, a distance of 67.29 feet; thence running Northeasterly on a tangent to curve last described, o distance of 213.0 feet, to an intersection
with the center line of New Brighton Road, at o point, distant 2087.0 feet Northerly from the South line of said Southwest 4, measured on said
center line, said center line of New Brighton Road being a line run Northwesterly at an angle of 63 degrees 3711' to said South line of
Southwest X from a point thereon distance 30.4 feet West of the Southeast corner thereof; thence running Southeasterly, with said center line
of New Brighton Road, a distance of 140.0 feet, to the point of beginning_
Has caused the some to be surveyed and platted as TRINITY LUTHERAN OF LAKE JOHANNA ADDITION, and does hereby dedicate or donate to the public
for public use forever the utility easement and drainage and utility easements as shown on this plat.
In witness whereof said Trinity Lutheran of Lake Johanna, a Minnesota corporation, has caused these presents to be signed by its proper officers this
day of , 20
Signed: Trinity Lutheran of Lake Johanna
Jeffrey Bender, President Howard Dyvig, Financial Secretary
STATE OF MINNESOTA
COUNTY OF
David Grant Patrick Klaers
Department of Property Records and Revenue
Pursuant to Minnesota Statutes, Section 505.021, Subd. 9, taxes payable in the year on the land hereinbefore described have been paid. Also,
pursuant to Minnesota Statutes, Section 272.12, there are no delinquent taxes and transfer entered this day of 20
, Director
Department of Property Records and Revenue
By Deputy
County Surveyor
I hereby certify that this plat complies with the requirements of Minnesota Statutes, Section 505.021, and is approved pursuant to Minnesota Statutes,
Section 383A.42, this day of 20
The foregoing instrument was acknowledged before me this day of 20 , by Jeffrey Bender, President, and by
Howard Dyvig, Financial Secretary, of Trinity Lutheran of Lake Johanna, a Minnesota corporation, on behalf of the corporation. Michael Fiebiger, P.L.S.
Notary Public, County, Minnesota
My Commission Expires
1, Mark D. Kemper, Professional Land Surveyor, do hereby certify that 1 have surveyed or directly supervised the survey of the property described on this
plat; prepared this plat or directly supervised the preparation of this plat; that this plat is a correct representation of the boundary survey, that all
mathematical data and labels are correctly designated on this plat; that all monuments depicted on this plat have been correctly set; that all water
boundaries and wet lands, as defined in Minnesota Statutes Section 505.01, Subd. 3, as of the date of the surveyor's certification are shown and
labeled on this plat; and all public ways are shown and labeled on this plat.
Dated this day of , 20
Mark D. Kemper, Professional Land Surveyor
Minnesota License No. 18407
STATE OF MINNESOTA
COUNTY OF
The foregoing Surveyors Certificate was acknowledged before me this day of 20 . by Mark D. Kemper, a Licensed
Professional Land Surveyor.
Susan R. Kemper
Notary Public, Minnesota
My Commission Expires
County Recorder, County of Ramsey, State of Minnesota
Ramsey County Surveyor
I hereby certify that this plat of TRINITY LUTHERAN OF LAKE JOHANNA ADDITION was filed in the office of the County Recorder for public record on this
day of , 20 at o'clock .M. and was duly filed in Book of Plats, Pages and . as Document
Number
Deputy County Recorder
KEMPER & ASSOCIATES INC_
SHEET 1 OF 2 SHEETS
NW
SECTION 33, T3ON, R23W
1/4
▪ SITE
SW 1/4
COUNTY ROAD D
TRINITY LUTHERAN OF LAKE JOHANNA ADDITION
WEST QUARTER CORNER OF s_____
SECTION 33, 1-30N, 023W
S 89' 41'34" W 1313.27
NE 1/4
LAKE
JOHANNA
SE 1/4 1
VICINITY MAP
NOT TO SCALE
T
6b
,f ib�K3 \� -NOT
TANGENT 2Oc �/ / / \ \ < /
" F / \ _ POINT OF BEGINNpVG OF LINE
GOVERNMENT LOT 4 OF D
611.6 ',�� \ - - - DESCRI$ED IN PARCELS A AND 8
, • • E,' . \ \ .. N /
. / / , \$ Oo
L:11),; r �,� , ' °� / / 763 \ \
�' ° � N 88° 37'26"
dry °�\o 6\ , 8.00 \
/ ' \
\
0 0 S 88° 37' is '10 \ cT:^
Z Nj 26" E N o
aB 6.13 N , V.
)1ofto 1 —i.•, �,'. -. i \ Qs -��,� J� i
, \
� '.
190.00 '� ' �` `'
zl 1 \ IS '`.;
EAST UNE OF THE O , '" :jJ
WEST 190 FEET OF °1
\%\?,-
r LOT 33, AUDITOR'S , p 1
SUBOIV 5108 NO. 80 v \
.,„„
„N
,„
BLOCK Nl 1
Q M No 1 1 EAST UNE OF /
1 LOT 33, AUDITOR'S
M i SUBDIVISION NO. $0
w j \
Z��yF
1 1 \ m y
to N 1 \ iy
o a.�
r �66t \ o
1
- WEST LINE OF
SEC. 33, T3ON, R23W
4J a
-ry�i
O '/ /1
z
�� /°
1/2 -INCH 15 -FOOT 'JT1UTY .�'� j SOUTH LINE OF SOUTH LINE OF
PINCHED EASEMENT GOVERNMENT LOT 4 OF LOT 33, AUDITOR'S
IRON PIPE % 185.00 / SEC. 33, T3ON. R23W
_� _ SUBDIVISION NO. 80
105.71150 -00 /s s 1 -! - - - -- - -- 457.63 /
\
\
\
\
ti
\
NORTH UNE OF
BLOCK 1 OF LAKE
JOHANNA PARK
AS PLATTED
S 89° 56'25" W 563.34
Y
N 89° 56'25" £ 1319.61
NORTH LINE OF THE
SOUTH 1320 FEET OF
THE SOUTHWEST QUARTER
OF SEC. 33, 030N, R23W
SOUTH LINE OF THE
SOUTHWEST QUARTER
OF SEC. 33, T3ON, R23w
04
SCALE: 1 INCH = 40 FEET
40 0 20 40 80
SCALE IN FEET
BEARINGS ARE BASED ON THE RAMSEY
COUNTY COORDINATE SYSTEM,
NAD 83, 1996 ADJUSTMENT
LEGEND
• DENOTES FOUND IRON MONUMENT
O
INDICATES 5/8 INCH X 18 INCH STEEL ROD
SET WITH CAP MARKED "KEMPER 18407"
DENOTES RAMSEY COUNTY
CAST IRON MONUMENT
DRAINAGE AND U11UTY EASEMENTS
ARE SHOWN THUS:
6--1
BEING 12 FEET IN WIDTH AND ADJOINING
STREET LINES AND 6 FEET IN WIDTH AND
ADJOINING LOT LINES, UNLESS OTHERWISE
INDICATED ON THIS PLAT.
30 40 SOUTHEAST CORNER OF THE
SOUTHWEST QUARTER OF
SECTION 33. T3ON, R23W
KEMPER & ASSOCIATES INC.
SHEET 2 OF 2 SHEETS
AIWINHILLS
MEMORANDUM
DATE: April 6, 2011
TO: Planning Commission
FROM: Meagan Beekman, City Planner
SUBJECT: Report from the City Council
PC Agenda Item 5.A
March 16, 2011, City Council Work Session
The City Council held a goal setting work session and identified priority areas for City Staff.
March 21, 2011, City Council Work Session
The Council met with the Parks, Trails, and Recreation Committee in a joint work session to
discuss goals and a 2011 work plan.
March 28, 2011, City Council Meeting
The City Council failed to approve a motion granting municipal consent for the I694 /TH 51
MnDOT reconstruction project. The issue will now go to an appeal board made of three
members in accordance with State Statute. The appeal board will hear testimony and make a
recommendation to the City and the Commissioner of Transportation.
City of Arlen Hills
Planning Commission Meeting for April 6, 2011
\\Metro-inetus\ardenhills\Planning\Planning Commission \CC Reports \03 -09 -11 - PC report - CC report.doc
Page 1 of 1