HomeMy WebLinkAbout04-20-11 EDC PacketChair
Ed von Holtum
Committee Members
Rob Davidson
Dan Erickson
James Huninghake
Vacant
Vacant
Vacant
Vacant
Vacant
Council Liaison
Brenda Holden
.!e--
AIWNHILLS
Arden Hills
Economic Development
Commission
April 20, 2011
8:00 am to 9:30 am
1245 W. Highway 96
Arden Hills, MN 55112
651.792.7800
www.ci.arden- hills.mn.us
City Vision
Arden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods,
vital business community, well - maintained infrastructure, fiscal soundness, and our long - standing tradition
as a desirable City in which to live, work, and play.
Agenda
Call to Order
1. APPROVAL OF THE AGENDA
2. MINUTES
A. January 12, 2011
3. UNFINISHED AND NEW BUSINESS
A. EDC Goals and Work Plan
B. B2 District
C. Tax Increment Financing Draft White Paper
D. Gateway Signage
4. UPDATES
A. TCAAP & Other Projects
B. Commission Members
C. Council Liaison
5. ADJOURNMENT
A quorum of the City Council may be present at this meeting.
EN /7kIHILLS
CITY OF ARDEN HILLS, MINNESOTA
ECONOMIC DEVELOPMENT COMMISSION
JANUARY 12, 2011 8:00 AM
CITY HALL - -1245 WEST HIGHWAY 96
CALL MEETING TO ORDER
Chair von Holtum called the meeting to order at 8:03 a.m.
ROLL CALL
Present: Chair Ed von Holtum, Committee Members Rob Davidson, James Huninghake,
and Dan Erickson.
Also Present: Council Liaison Brenda Holden, City Administrator Pat Klaers, and Community
Development Director Jill Hutmacher.
Absent: None.
1. APPROVAL OF AGENDA
It was the consensus of the EDC to accept the agenda as presented.
2. APPROVAL OF MINUTES
MOTION: Committee Member Davidson moved and Committee Member Huninghake
seconded a motion to approve the March 17, 2010 and the April 21, 2010
EDC minutes as presented. The motion carried unanimously (4 -0).
3. UNFINISHED AND NEW BUSINESS
A. Introductions
Introductions were made as the City Administrator and Community Development Director are
both new to the City and have not met the EDC. Staff, the Council Liaison, and the EDC
members all offered comments on their background and experience.
B. Discussion of History, Role, and Purpose of EDC
Chair von Holtum led the discussion on the history of the EDC and recent activities /projects of
the EDC. It was noted that for a variety of reasons, the EDC has not been very active in the last
EDC Minutes
January 12, 2011
Page 2 of 2
12 months and that the EDC, in general, has been lacking direction from the City Council on a
work program and goals. The City Administrator stated that the City Council will discuss
Economic Development and Finance Committees and Commissions at their goal setting meeting
next month. The possibility of combining FPAC, EDC and /or the EDA was briefly discussed.
The EDC discussed the Business Contact Program that was worked on in 2008 -2010; the
Guiding Plan for the B2 District; and what work is needed by the City to help improve the Red
Fox /Grey Fox area.
C. Draft Strengths, Weaknesses, Opportunities, and Threats (SWOT) Analysis
Community Development Director Hutmacher reviewed a first draft of a community
development SWOT analysis.
4. UPDATES
A. TCAAP & Other Projects
B. Commission Members
B. Council Liaison
Due to the time, these items were not discussed.
Chair von Holtum stated that the EDC has gone to a quarterly meeting schedule. The next
meeting of the EDC will be in April.
ADJOURNMENT
The meeting adjourned at 9:50 a.m.
Minutes approved by:
Ed von Holtum, Chair Jill Hutmacher
Community Development Director
--ARZENHILLS
MEMORANDUM
DATE: April 20, 2011 EDC Agenda Item 3.A
TO: Economic Development Commission Chair and Commissioners
FROM: Jill Hutmacher, Community Development Director -314
SUBJECT: Economic Development Commission Goals and Work Plan
The City Council is currently working with staff and a public management consultant on creating
goals and a work plan for the next one to three years. Two meetings have been held, and a third
meeting is scheduled for May 2, 2011. Although Council priorities have not been established,
preliminary goals include the following:
Development Coordination
Goal: Establish goals and work plans for committees and commissions.
Example action items:
• Evaluate how the EDC and FPAC can work more closely together.
• Create a process to evaluate development issues.
• Create a long -term development vision and goals.
• Align resources to development vision.
Community Identity
Goal: Foster a community identity of a well-managed, prosperous, and forward - looking city.
Example action items:
• Install gateway signs.
• Update City website and consider options for electronic information distribution
and social networking.
• Implement B2 Plan with streetscape improvements.
• Complete a long-term planning study including design standards for Red
Fox/Grey Fox.
City of Arden Hills
Economic Development Commission April 20, 2011
Page 1 of 2
Business Outreach
Goal: Promote a business - friendly environment.
Example action items:
• Create a business page on the City website.
• Establish a forum for regular communication with the business community.
• Update the business marketing packet and determine how it should be distributed.
B2 District Plan
Goal: Establish a plan for the redevelopment of the B2 District.
Example action items:
• Determine a process for the selection of a consultant for the B2 Implementation
Plan.
• Work with property owners on development and redevelopment proposals.
• Align resources to the vision and goals for the B2 district.
Staff would appreciate Commissioner feedback on the draft preliminary goals and example
action items described above.
City of Arden Hills
Economic Development Commission April 20, 2011
Page 2 of 2
HILLS
MEMORANDUM
DATE: April 20, 2011 EDC Agenda Item 3.B
TO: Economic Development Commission Chair and Commissioners
FROM: Jill Hutmacher, Community Development ment Director .J
SUBJECT: B2 District Implementation Plan
The City Council has authorized staff to move forward with planning and design of
improvements along County Road E as described in the B2 District Plan. The Capital
Improvement Plan designates $270,000 in 2011 for this work. Staff will work with the City
Council to determine a process for selection of a consultant to work on a Scope of Work that will
address:
• Upgrades to utilities along County Road E;
• Streetscape improvements along County Road E;
• Public participation process for evaluating construction of a landscaped center median
and restriction of left turns from and onto County Road E;
• Cost estimates, proposed timeline, and analysis of funding sources for public
improvements along County Road E;
• Density scenarios and their affect on traffic counts and need for a new signalized
intersection;
• Options for "back door" access from Arden Plaza to Pine Tree Drive including cost
estimates for acquisition, relocation, and construction; and
• Other issues as identified by the City Council, consultant, and staff.
Staff expects to discuss the consultant selection process with the City Council in May.
City of Arden Hills
Economic Development Commission April 20, 2011
Page 1 of 1
---AITEN HILLS
MEMORANDUM
DATE: April 20, 2011 EDC Agenda Item 3.0
TO: Economic Development Commission Chair and Commissioners
FROM: Jill Hutmacher, Community Development Director III
SUBJECT: Tax Increment Financing White Paper
The City Council has asked the Financial Planning and Analysis Committee (FPAC) to draft a
white paper analysis on the use of tax increment financing (TIF). FPAC held a joint meeting
with the City Council on April 12, 2011. Councilmember Holden, the Council liaison to FPAC,
will provide a summary of that meeting. FPAC has asked the EDC to attend the May 10, 2011,
FPAC meeting to discuss the white paper. The meeting is scheduled for 6 p.m. in the Council
Chambers.
City of Arden Hills
Economic Development Commission April 20, 2011
Page 1 of 1
TIF Selection Process Whitepaper
for Arden Hills
February 1, 2011
Summary
We recommend that the City Council:
1. Establish long -term TIF assessment criteria
2. Develop a point-based assessment system
Background
TIF
The original argument made to legislatures to create TIF was that it created a way for cash -
strapped communities to finance the upfront costs associated with redeveloping blighted areas,
most commonly cleanup /remediation costs and infrastructure improvements. Subsidized
redevelopment in an area could then spur future, unsubsidized redevelopment.
TIF has long -term effects that need to be considered when making a decision about providing
TIF for a project. "Unlike property taxes, increments are not used to pay for the general costs of
cities, counties, and schools. Instead, increments go to the development authority and are used to
repay public indebtedness or current costs the city incurred in acquiring the property, removing
existing structures or installing public services." (League of Minnesota Cities)
FPAC Committee
Arden Hills already has TIF Districts and anticipates the need for more TIF financing. The
Financial Planning and Analysis Committee was asked to look at how the City selects TIF
projects and make recommendations about the process. The Committee addressed three broad
questions:
• How much of the city's tax base can it afford to have in TIF Districts?
• How does the city best allot its TIF dollars to support its long term goals? (First come,
first served may not provide the best outcome for the city.)
• Are there tools or methods that will help city leadership assess each TIF request?
The committee has reviewed cases and policies from other cities around the United States as well
as processes used in corporate America to evaluate long -term strategic options and projects.
TIF Decision Process Overview
There are many tools the City of Arden Hills can use to drive development in the city, including
preferential use of city facilities, loans, direct subsidies, property tax abatement, and Tax Increment
Page 1of6
Financing (TIF). These varying tools have different long -term and short -term costs.
TIF is one type of business subsidy. Importantly, TIF is a long -term subsidy with long -term cost and
benefit impacts that must be considered. This stands in contrast to some other forms of subsidies where
the costs and impacts tend to be more short -term nature.
The use of TIF can be thought about as having two decision layers. The first layer involves near term
considerations:
• Is the individual project acceptable under the City of Arden Hills business subsidy Policy?
• Is the project financially feasible?
• Is the TIF request currently affordable under the cities TIF Spending Guidelines? (see
recommendation below)
The second layer of considerations involves long -term considerations.
• How does an individual project compare to the stated long -term goals and vision of Arden Hills?
• How does the project compare to other potential long -term projects that are not yet identified?
• How much long term leverage can the City obtain from a particular TIF project?
Before a TIF project is approved, the project should be acceptable under both levels of consideration.
Short -term consideration
The first step is to match the project to the City's Business Subsidy criteria. The project must fall within
the guidelines outlined. The second step is the project must meet the financial thresholds for a TIF
project. Finally, as a third step the project alone or in conjunction with other known projects cannot drive
the city to exceed its total desired TIF limit as defined in this TIF selection process guideline.
These short -term considerations should be considered a threshold. A project must pass these tests to be
considered for TIF funding. However, TIF funding is long -term, therefore the more important
considerations are the long -term considerations.
Long -term consideration
By its nature TIF has long term impacts. The creation of a TIF District reallocates the tax money the
district creates for a period of time measured in years or even decades. Because only so much TIF is
affordable for the City, at a very minimum any individual TIF District presents a long -term (lost)
opportunity cost —a project today may preclude another different, potentially more beneficial, yet
unknown project tomorrow. Therefore the TIF decision making process should be focused on long -term
considerations.
Recommendation for Creating a TIF Evaluation Process
Develop TIF Spending Guidelines
In order to better manage TIF financing decisions over the long term we recommend the City
debate and set into policy a guideline on the total projected tax capacity of all tax increments in
the City. The City should limit the total projected tax capacity of all tax increments to not exceed
3/4 of the state average of 6.4% of the taxable market value. This would mean a guideline for
projected tax capacity for all tax increments in the City not to exceed X %.
Page 2 of 6
Additionall
we
recommend the ' A - - - - ' I regular graphically monitoring of TIF projects either
every oth.er year or after a certain level of new TIF activity.
The items that will be reviewed should include the total projected tax capacity, the percentage of
increase in services since the last review, the number of TIF projects and their respective end
dates, the effectiveness of active TIF projects to their original concept, and any other statistics or
benchmarks that the committee deemsdeemed to be of importance.
Develop measurement criteria
We recommend that the city debate and approve a set of long -term criteria with which to weigh
potential TIF projects.
The City has already developed a vision statement. The Committee considered whether this
might be adequate as long term measurement criteria. One could simply compare a development
project to the City's stated long -term strategic goals. While the process would be a good first
step, we feel that it is too broadly worded to be used as criteria and would lead to confusion from
both developers trying to assess how the city will view their individual projects and citizens who
wonder why a particular project is or is not approved. We recommend the city develop a set of
more refined, long -term selection criteria with which to weigh development projects seeking TIF.
We further recommend that developing these criteria be done outside the process of considering
any individual project. This will help ensure, as best as possible, an independent view of the
long -term needs and strategy of the City. These long -term criteria would then be integrated into
the current process of evaluating business subsidies.
Assign points
We recommend using a point based assessment system. There are multiple ways to implement
this, but the goal of any method should be that when a project is assessed it would be granted
points relative to how much it met each criterion and how relatively important that criterion is.
The intent of the points system is not that it would make the decision for the City Council, but
rather that it would focus discussion on the most salient points of the project under consideration.
Any large project is inherently complex and it is important to avoid prematurely debating its
finer points.
It has been suggested that an objective rather than subjective point system be developed, however given
the complexity of redevelopment projects and the mix of short- and long -term costs and benefits involved,
the Committee could come up with no strictly objective measure. That said, where possible we strongly
encourage objective measure wherever feasible. We also recommend that specific minimum requirements
be laid out, including enumerating any specific types of projects that are not considered appropriate for
TIF because by their nature such projects do not provide the necessary long -term benefits.
Scoring would be done by the City Council or its designated representatives.
Page 3 of 6
We commend that the following points, taken from our research, be held in mind throughout this
process:
1. The "but for" tests are only the minimum requirements for qualifying for TIF; prudent
communities set more stringent requirements.
2. TIF is there to solve community problems.
3. Use TIF only when truly necessary; it was never designed to be an alternate financing
method for private developers.
TIF Selection Criteria
Below is a draft of what selection criteria might look like. This is for discussion purposes only.
The goal would be to modify the percentages and the specific criteria and have the City Council
eventually, debate, vote and approve the Criteria. Once this is done the Economic Development
Committee (EDC), with any assistance needed from FPAC, should develop a detailed scoring
process and methodology.
Minimum requirements to use TIF
• The long -term viability of the development partner has been reviewed and the City has
determined that the partner has the financial stability and track record to drive the full
benefit of the project over the life of the project
• The objective of the project produces long -term expected benefit that exceeds the length
of the TIF and is at least 15 years in duration.
Selection Criteria (in rank priority order within each section)
Community Goals 60%
1. Materially enhances the health, safety and well -being of all who live, work and play in
the City.
a. Enhances an interconnected system of trails, pathways and open spaces.
b. Protects and preserves the community's natural resources including open spaces,
lakes, wetlands, other significant natural features and historic resources.
2. Enhances or retains development of TCAAP in a way that accommodates a mix of land
uses that is sensitive to the natural environment, economically sustainable and a benefit to
the community
3. Retains or creates jobs that are long -term in nature and at or above the median for the
State of Minnesota (vs. Business Subsidy Policy standard ?)
4. Creates a desirable commercial /retail environment that enhances the long -term vitality of
the City.
5. Provides a transportation system that has convenient and effective multi -modal
connections within Arden Hills and to adjacent municipalities, the remainder of the Twin
Cities Metropolitan Area and greater Minnesota.
Future Leverage Goals 30%
1. Likelihood project will spur other projects that will not require further subsidy.
a. Increases the ability to further develop a healthy and accessible community
b. the center for further business development
c. Increases likelihood of job growth in a growing industry
Page 4 of 6
Regional Goals 10%
2. Moves the region closer to its mix goals for affordable housing
3. Enhances the regional trail system and it's integration with the Arden Hills trail system
Next Steps
l.) Circulate Whitepaper with entire FPAC; debate and modify as appropriate.
2.) Review the City of Bloomington's methodology for creating its TIF spending guidelines.
3.) Place topic on City Council working session agenda for discussion and feedback.
4.) City Council to debate and approve (subject to modifications and amendment) "Long-
term TIF Selection Criteria"
5.) Based on City Council's approved Long -term TIF Selection Criteria, EDC (with
assistance from FPAC) to develop Long -term TIF Criteria point system and revised TIF
approval process
Page 5 of 6
6.) City to embody new process and point system into TIF approval policy.what the final
components and process might look like
TIF Assessment Components and Process
City Management Information
(Identified outside any project proposal)
City development goals
Prioritized and weighted
City financial goals
Prioritized and weighted
TIF Budget and plan
TIF Assessment Worksheet
TIF Assessment Process
(The 3 steps of the worksheet done for each project)
Initial project screening
Passes City's subsidy criteria?
TIF regulatory qualification?
City has TIF capacity?
Long -term screening
Long term benefits to City?
Long term viability of partner?
TIF assessment
How well does project rank? EDC recommendation?
Matches well enough to continue
Matches well enough to continue
TIF assessment
City Council approval?
Ranks well enough to recommend to City Council
Page 6 of 6
EN HILLS
MEMORANDUM
DATE: April 20, 2011 EDC Agenda Item 3.D
TO: Economic Development Commission Chair and Commissioners
FROM: Jill Hutmacher, Community Development Director n-]
SUBJECT: Gateway Signs
The City Council will discuss Gateway Signs at the April 18 Work Session Meeting. The
Council Liaison and staff will provide a summary of the Council discussion.
City of Arden Hills
Economic Development Commission April 20, 2011
Page 1 of 1