Loading...
HomeMy WebLinkAbout4J, Award the Indian Oaks Court Storm Sewer Repair to CW Houle, Inc. of Shoreview€ � � � EN HII,LS Request for Council Ac��on : Prepared By: Kristine Giga, Civil Engineer 3 CounciI Meeting Date: ]une 27, 2011 Award the Indian Oaks Court Storm Sewer Repair to CW Houle, Inc, of Shoreview, Mi�nesota, in the amount of $12,982.00 Budgeted Amount: Estimated Actual Amount Funding Source: $6,000 $12,982 $9,636 Surface Water Management Fund $3,346 Streets Operating Budget Recommendation: Award t�� Indian Oa1cs Court Storrn Sewer Repair to CW Houie, Inc. of Shoreview, Minnesota, in the amaunt of $12,982.00. Su ortin Documents: • Memorandum dated 7une 27, 20 T 1 from Kristine Giga. � EN HILLS MEMORANDUM DATE: Jun.e 27, 2011 TO: Honarable Mayor and City Councilmembers Patrick Klaers, Cit� Adrninisfrator FROM: Krzstine Giga, Civil Engineer �� SUBJECT: Awarding Bid for the Yndian Oaks Court Siorm Sewer Re�air Back�round/ Discussion At the November 15, 2010 Co�ncil work session, City staff presented and discussed the Indian Oaks Court storm water pond maintenance project. The City Council directed staff to proceed witY� ihe proposed project. The proposed pond mainfenance is being completed in three phases, each with separate construction coniracts: dredging pond sedimer�ts, shoreline restoratian and landscaping, and replacement of the pond's outlet pipe. The pond excavation was completed by Belair Excavating in February, 2011. The re�toration was completed by Natural Shore Technologies in May and June, 2011. Quotes were soliciied in June from four contractors for the tihird phase of ihe project, the pipe repair on Indian Oaks Court. This work inciudes the rernoval and replacernent of the existing pond autlet, two catch basins, castings, and the connecting pipe. Pavemeni re�naval and street patching is also a pat�f of the quote; the patch will be approximately 10 feet wzde for the full width of the street. Three quotes were received an June 22, 2011. The fol�owing is a list of the quotes recei�red: BIDDER AMOUNT CW Ho�le, Inc. $ 12,982.00 Frattalone Campanies $ 13,740.00 Valley-Rich Co., Inc. $ 13,900.00 Based on past practice, the City Council has awarded the contract to the lowesi responsible bidder. In the case of the �ndian Oaks Court Storm Sewer Repair, the lowest responsible bidder is CW Houle, Inc. of Shoreview, Minnesota. City staff has worked with this contractor in the past, and feel that they are a reputable firm that completes good vvark. City Council Meeting 11Metro-inet.uslardenhiIlslPR&PW1EngineeringlCouncil Actions120 1 116-27-1 1Memo_PondPipeRepair-QuoteAward.dac Page 1 of 2 Financial Implications This project is budgeted in ihe Surface Water Management Fund. The City's Capital Improvement Plan (CIP) includes $SO,Q00 for storm pond maintenance. The tatal project cost for a11 three phases is $61,200. The Ramsey Canser�ation District is contributing 50% of the restoration costs (Phase 2), or $8,383. The paverr�ent removal and street patching portion of Phase 3, $3,346, will be funded from the streets operating budget. Schedule Upon award, the contractor will be directed to corrLplete the work as soon as possible, but no later ihan August 19, 2011. CounciI Action Re uested Award the Indian Oaks Court Stoz-nn Sewer Repair to CW Houle, Inc. o f Shoreview, Minnesota, in the amount of $12,982. City Conncil Meeting 11Metra-inet.uslardenhillslPR&P W1EngineeringlCouncil_Actions1201 I16-27- ll Memo_PondPipeRepair-QuoteAward, doc Page 2 of 2