Loading...
HomeMy WebLinkAbout7A, Planning Case 11-011 – Select Senior Living PUD & Plat MEMORANDUM DATE: June 27, 2011 TO: Honorable Mayor & City Councilmembers Patrick Klaers, City Administrator FROM: Meagan Beekman, City Planner SUBJECT: Planning Case 11-011 Applicant: TAT Properties and Select Senior Living Property Location: 1201 West County Road E Request: Zoning Code Amendment, Preliminary and Final Plat, Master and Final Planned Unit Development Requested Action Approve Ordinance 2011-007 amending the Zoning Code to allow nursing home and assisted living as a permitted use within the B-2 District with an approved Planned Unit Development based on the Findings of Fact in the June 27, 2011, memo to the City Council. Approve publishing a summary of Ordinance 2011-007 Approve Planning Case 11-011 for a Preliminary and Final Plat and Master and Final PUD to subdivide the property at 1201 County Road E into two parcels and reuse the existing building as assisted senior housing, based on the Findings of Fact and submitted plans, subject to the conditions in the June 27, 2011, report to the City Council. Background The property at 1201 County Road E is owned by TAT Properties, represented by Rob Davidson. In March 2008, the City approved a request from TAT Properties and Northwestern College granting an Interim Use Permit (IUP) at the former Holiday Inn property that would allow the College to operate a student housing facility in the B-2 District. TAT Properties had City of Arden Hills City Council Meeting for June 27, 2011 \\Metro-inet.us\ardenhills\Planning\Planning Cases\2011\11-011 - Select Senior Living PUD (PC Approved)\06-27-11 - Select PUD and Plat - Memo.doc Page 1 of 8 purchased the building and intended to lease it to Northwestern College. The IUP expired on May 30, 2011. Northwestern College has vacated the building. At the time of the IUP approval, the City was just beginning the process of developing the Guiding Plan for the B-2 District, which was ultimately adopted in October 2008. The City’s zoning regulations were consequently amended to incorporate the goals of the Guiding Plan for the B-2 District shortly after it was adopted, including design standards for new construction. Select Senior Living is requesting a Zoning Code Amendment, and Master and Final PUD to allow the reuse of the existing building at 1201 County Road E as an assisted senior housing facility. The applicants are proposing to convert the existing hotel use into 150 units of senior living, which would include approximately 14 independent living units, 106 assisted living units, and 30 memory care units. The residents would be senior citizens age 55 years and older, with an average age of 82. As part of their application, Select Senior Housing is proposing significant site improvements including removing a large portion of the existing parking lot and front drive aisle and converting it to landscaped area; constructing a patio area and walkways; and installing storm water ponding, curb and gutter, and landscaping around the property. In addition to the site improvements, the applicants are proposing to paint the exterior EIFS and roof, add architectural accents to the building, and upgrade the internal fire suppression system and elevators. Presently, the Zoning Code does not identify assisted living as a permitted or conditional use within the B-2 District. Land uses that are not specifically identified in a city’s zoning code as permitted or conditional uses are considered prohibited. In order to accommodate the applicant’s request to allow the senior housing facility at the proposed site, the request includes a proposal to amend the Zoning Code to add Nursing Home and Assisted Living as a use permitted through a PUD process in the B-2 District. This means that the use would be considered permitted, but would be required to get an approved Master and Final PUD in order to operate in the B-2 District. Staff has drafted an amendment to Section 1320.085 Subd. 5 (Attachment B). In addition to the request for the Zoning Code Amendment and the Master and Final PUD, TAT Properties is proposing to subdivide the property into two parcels, reserving the eastern two acres of the site for a future development option that has yet to be determined. The submitted plans include a conceptual drawing of a building that might be possible on Lot 2, but the applicants are not seeking approval for development on Lot 2 at this time. In order to accommodate the request for the subdivision, and bring the property into compliance with the City’s zoning regulations, the storm water ponding and landscaped area would be shared by the two parcels. The applicant has submitted a letter outlining the reasons for the request and a preliminary plat plan set (Attachment D). A traffic study was also completed and is included as Attachment C. City of Arden Hills City Council Meeting for June 27, 2011 \\Metro-inet.us\ardenhills\Planning\Planning Cases\2011\11-011 - Select Senior Living PUD (PC Approved)\06-27-11 - Select PUD and Plat - Memo.doc Page 2 of 8 Discussion The project, as proposed, meets all of the requirements of the City’s Zoning Code, and substantially conforms to the City’s design standards for the B-2 District. A complete review of the application can be found in the June 8, 2011, report to the Planning Commission (Attachment D). Traffic The subdivision of the property into two lots would create a nonconforming parcel. Lot 2 would not be conforming because it would have no direct access to County Road E or Lexington Avenue. The County has indicated that they are not in favor of allowing an additional access in this area. That being said, a traffic study was completed that looked at ingress and egress to both parcels, and found that, depending on what is developed on Lot 2, traffic would not be significantly increased, and may even decrease compared to the traffic generated on the site as a hotel. RLK Engineering prepared a traffic analysis of the site, specifically looking at past, present, and anticipated traffic generation to and from the property (Attachment C). Because the user of Lot 2 is unknown, RLK prepared their analysis assuming five different development scenarios for Lot 2: a specialty retail use, a fast food restaurant, a bank, an office, and a pharmacy. The traffic analysis found that given the reduction in vehicle trips from the senior housing, additional development could occur on Lot 2 without significantly increasing overall trips to and from both properties. While the vehicle trips in and out of the site are likely not going to exceed capacity, ingress and egress to Lot 2 is critical in maintaining proper traffic flow and safety. Staff has suggested that directing one-way traffic through the front drop-off area from west to east would improve the exiting movements out of both Lot 1 and Lot 2. In addition, Staff has suggested a number of traffic management improvements that could be implemented with the development of Lot 2, depending on the anticipated traffic generation, that would provide safe and efficient traffic flow into and out of that site. Traffic management improvements could include adding a pork chop to ensure all traffic entering the east driveway turns right into Lot 2; widening the drive aisle accessing Lot 2; and adding a median on the drive aisle between Lot 1 and Lot 2 to separate traffic entering and leaving Lot 2. Implementation of these traffic management solutions would be done with the development of Lot 2, and would have the result of allowing Lot 2 to have near exclusive use of the eastern driveway, effectively separating the traffic generated by the two parcels. Park Dedication Park use dedications are required as part of the approval of a subdivision of this property. According to the City’s subdivision ordinance the property is subject to a park dedication City of Arden Hills City Council Meeting for June 27, 2011 \\Metro-inet.us\ardenhills\Planning\Planning Cases\2011\11-011 - Select Senior Living PUD (PC Approved)\06-27-11 - Select PUD and Plat - Memo.doc Page 3 of 8 requirement because of the platting of the parcel. Based on the Code, park dedication can be in the form of a percentage of land dedicated to the City, or as cash in lieu of a dedication. In the event of a cash dedication, the amount could be up to ten percent of the fair market value of the property. According to the Ramsey County Assessor, the property has an assessed value of $2.67 million. Based on a review of adjacent communities’ codes and the anticipated use of the site as senior housing, Staff is recommending a reduced park dedication amount of five percent of the 2011 assessed land value, or an amount of $133,350. This amount would need to be paid in cash prior to the execution of the Final Plat, unless the developer enters into an agreement for a payment plan. According to State Statute, cash payments made to cities in lieu of park dedication can only be used towards the construction of new recreation facilities and cannot be used to maintain existing facilities. There are not many opportunities in a fully developed community like Arden Hills to increase park funds through park dedication. The benefit of cash park dedication to the City is dedicated dollars for trail development, which would otherwise not be able to occur. After discussions with the developer, Staff would also be open to an alternative option related to park dedication. The developer has suggested that the City waive park dedication, and as part of the approval of the preliminary and final plat, the developer would give to the City, through a future assessment against Lot 2, an amount of $133,350 over and above any other assessments related to the implementation of the streetscape improvements for the B-2 District. In other words, it is anticipated that the City will assess a portion of the streetscape improvements related to the Guiding Plan for the B-2 District against the benefiting property owners. The owner of Lot 2 would agree to these assessments, plus an addition $133,350 towards the project. The benefit to the City in this arrangement would be the ability to use these funds toward accomplishing the streetscape improvements along County Road E. Staff is requesting that the City Council provide direction on which park dedication option they prefer. A.A cash payment of $133,350 at the time the subdivision occurs B.A future assessment of $133,350 over and above Lot 2’s proportional share of the County Road E streetscape improvements, levied at the time the improvements are implemented. Findings of Fact The Planning Commission offers the following findings of fact for the City Council’s consideration: General Findings: City of Arden Hills City Council Meeting for June 27, 2011 \\Metro-inet.us\ardenhills\Planning\Planning Cases\2011\11-011 - Select Senior Living PUD (PC Approved)\06-27-11 - Select PUD and Plat - Memo.doc Page 4 of 8 1.If the proposed Zoning Code changes in Planning Case 11-011 were approved, nursing home and assisted living would be a permitted use, under certain circumstances, with an approved PUD, in the B-2 District. 2.The Master and Final PUD process allows flexibility with the implementation of the City’s subdivision and zoning regulations. 3.The proposal is not anticipated to adversely impact nearby properties through nuisance, noise, dust, glare, or unsightliness, and will not otherwise adversely impact the health, safety, and welfare of the community because the use is located in a commercial district, that has been identified as an appropriate location for a mix of uses including multi- family housing. 4.The proposal would decrease parking and traffic on the site compared to existing conditions. 5.The proposal is in keeping the principles of the Guiding Plan for the B-2 District due to the existing configuration of the site, and the addition of Lot 2 as a development opportunity in the B-2 District. 6.There are no delinquent property taxes, special assessments, interest, or City utility fees due upon the subject parcel. Proposed Special Requirements for Nursing Home and Assisted Living facilities in the B-2 District: 7.The building to be used will be upgraded to meet all applicable building and fire codes. 8.Each room will have its own bathroom. 9.The capacity of the building will not be exceeded. Planned Unit Development Review Findings: 13.Lot size, building and landscape coverage, and setbacks are met by the proposed plans. 14.All parking lot and landscaping requirements are met or exceeded by the proposed plans. 15.All Zoning regulations are met or exceeded by the proposed plans. 16.The design standards that can be applied to this application are substantially met by the proposed plans. 17.Required number of parking stalls is exceeded by the proposed plans. 18.The project is subject to park dedication requirements. Recommendation The Planning Commission held a public hearing and reviewed Planning Case 11-011 and unanimously recommended approval based on the findings of fact and the submitted plans as amended by the following conditions. Since the Planning Commission meeting, the City Attorney has recommended a number of revisions to the conditions of approval. These revisions are indicated below as underlined text. City of Arden Hills City Council Meeting for June 27, 2011 \\Metro-inet.us\ardenhills\Planning\Planning Cases\2011\11-011 - Select Senior Living PUD (PC Approved)\06-27-11 - Select PUD and Plat - Memo.doc Page 5 of 8 1.The project shall be completed in accordance with the plans submitted as amended by the conditions of approval. Any significant changes to these plans, as determined by the City Planner, shall require review and approval by the Planning Commission and City Council. 2.The applicant shall file the Final Plat with Ramsey County within one year of City approval, or the approval for the Final Plat shall expire, unless extended by the City Council prior to the approval’s expiration. Extension requests must be submitted in writing to the City at least 45 days prior to the expiration date. 3.Development agreements, drafted by the City Attorney, shall be signed by the property owners of Lot 1 and Lot 2 prior to the execution of the Final Plat. 4.The applicant shall provide drainage and utility easements, in favor of the City, in accordance with 1130.05 of the City Code, prior to the execution of the final plat. 5.The applicant shall dedicate to the City a ten-foot wide pedestrian easement along the property line adjacent to County Road E, within which the six-foot wide sidewalk shall be constructed. 6.Prior to ten years elapsing, or upon any future PUD approval of the parcel, the City may incorporate a civic feature into the southeast corner of Lot 2. 7.The applicant shall provide for park dedication in an amount of $133,350. The park dedication shall be paid in full prior to the execution of the Final Plat, or the property owner shall enter into an agreement for a payment plan that is in accordance with Section 1130.08 Subd E of the City Code. 8.The applicant shall submit a financial surety, in a form acceptable to the City Attorney, for 125 percent of the cost of removal of the bituminous on Lot 2, and the materials and installation of the sidewalks along County Road E and Lexington Avenue adjacent to Lot 2 prior to the execution of the final plat. The City may use the surety to implement associated improvements. 9.The applicant shall obtain all necessary permits, including, but not limited to, NPDES, Rice Creek Watershed District, Ramsey County, and City Erosion Control Permits. Copies of all necessary permits shall be submitted to the City prior to the issuance of any development permits. 10.Fire Hydrants shall be located within 150 feet of the Fire Department Connections (FDC) to each building on Lot 1 and Lot 2. 11.The applicant shall submit a financial surety in a form acceptable to the City Attorney for 125 percent of the cost of materials and installation of the landscaping plan prior to the City issuing any development permits for Lot 1. The City shall retain the financial surety for at least two years after full implementation of the landscaping plan. The financial surety shall only be released upon successful inspection of the landscaping by the City Planner, which shall only occur during the growing season. 12.The applicant shall obtain a certificate of occupancy for Lot 1 within one year of the approval date of the development agreement, or the Master and Final PUD approval shall expire, unless extended by the City Council prior to the approval’s expiration City of Arden Hills City Council Meeting for June 27, 2011 \\Metro-inet.us\ardenhills\Planning\Planning Cases\2011\11-011 - Select Senior Living PUD (PC Approved)\06-27-11 - Select PUD and Plat - Memo.doc Page 6 of 8 date. Extension requests must be submitted in writing to the City at least 45 days prior to the expiration date. 13.All improvements illustrated on the approved plans and associated with Lot 1 shall be completed prior to the issuance of a Certificate of Occupancy for Lot 1. 14.The applicant shall obtain all necessary State and County licensing, and shall provide copies of such, prior to the issuance of a Certificate of Occupancy. 15.Building on Lot 1 shall comply with Chapter 1306, Special Fire Protection Systems, of the State Building Code, which requires the installation of a fire sprinkler protection system that complies with NFPA 13, subject to the approval of the Fire Marshal, prior to the issuance of a Certificate of Occupancy. 16.Building on Lot 1 shall comply with all provisions of Chapter 14 of the City Code regarding property maintenance, subject to the approval of the Building Official, prior to the issuance of a Certificate of Occupancy. 17.The applicant shall install a sewer grinder, subject to the approval of the Public Works Director, on Lot 1. 18.Permanently affixed bicycle racks shall be provided near all primary entrances to the building on Lot 1, subject to the approval of the City, prior to the issuance of a Certificate of Occupancy. 19.The applicants shall install additional landscaping and a three-foot decorative wrought iron fence between the parking located in the front of the building on Lot 1 and the sidewalk, subject to the approval of the City Planner. 20.The applicant shall remove all portions of the bituminous parking lot on Lot 2, with the exception of a 25-foot width to the east of the existing building, subject to the approval of the Fire Department, within six months of the approval of the Final Plat. 21.The applicant shall install a six-foot concrete sidewalk along County Road E on Lot 2 within six months of the approval of the Final Plat, and a six-foot concrete sidewalk along Lexington Avenue within one year of the approval of the Final Plat. 22.All exposed soils, not considered improved hard surfaces or perennial planting areas, shall be seeded or sodded with an approved grass mixture. 23.The applicant shall submit to the City joint maintenance agreements, and shared access agreements, between Lot 1 and Lot 2 prior to the issuance of building permits for Lot 2. 24.Traffic management shall be implemented at the eastern most driveway, as illustrated in the June 27, 2011, report to the City Council, subject to the approval of the Public Works Director, to effectively provide efficient and safe ingress and egress to Lot 2. Traffic management devices may be installed at the time of Lot 2 development, subject to the approval of the Public Works Director. 25.The applicants shall agree to waive their right to appeal future assessments related to the installation of landscaping, street lighting, benches, and other features associated with the County Road E streetscape improvements, in an amount not to exceed $350 per linear foot of County Road E street frontage. City of Arden Hills City Council Meeting for June 27, 2011 \\Metro-inet.us\ardenhills\Planning\Planning Cases\2011\11-011 - Select Senior Living PUD (PC Approved)\06-27-11 - Select PUD and Plat - Memo.doc Page 7 of 8 26.The applicants shall provide to the City temporary construction easements for implementing the County Road E streetscape improvements, provided the City repair and replace any disturbances on applicants’ property. Requested Action Approval of this planning case is subject to the execution of development agreements between the City and all parties involved. Based on the Council’s direction regarding park dedication, development agreements will be drafted and brought back to the City Council for approval at a future meeting. 1.Motion to Approve Ordinance 2011-007 amending the Zoning Code to allow nursing home and assisted living as a permitted use within the B-2 District with an approved Planned Unit Development based on the Findings of Fact in the June 27, 2011, memo to the City Council. 2.Motion to Approve publishing a summary of Ordinance 2011-007 3.Motion to Approve Planning Case 11-011 for a Preliminary and Final Plat and Master and Final PUD to subdivide the property at 1201 County Road E into two parcels and reuse the existing building as assisted senior housing, based on the Findings of Fact and submitted plans, subject to the conditions in the June 27, 2011, report to the City Council. Deadline for Agency Actions The City of Arden Hills received the completed application for this request on May 25, 2011. Pursuant to Minnesota State Statute, the City must act on this request by July 24, 2011 (60 days), unless the city provides the petitioner with written reasons for an additional 60 day review period. The City may, with the consent of the applicant, extend the review period beyond the initial 120 days. Attachments A.Draft June 8, 2011, Planning Commission Minutes B.Ordinance 11-011 and Publication Summary C.June 7, 2011, Traffic Study and Proposed Traffic Management Solutions D.June 8, 2011, Report to the Planning Commission – http://www.ci.arden-hills.mn.us City of Arden Hills City Council Meeting for June 27, 2011 \\Metro-inet.us\ardenhills\Planning\Planning Cases\2011\11-011 - Select Senior Living PUD (PC Approved)\06-27-11 - Select PUD and Plat - Memo.doc Page 8 of 8 A Attachment Draft June 8, 2011, Planning Commission Minutes The Planning Commission voted unanimously to approve this application at their June 8, 2011, meeting City of Arden Hills City Council Meeting for June 27, 2011 Draft June 8, 2011, Planning Commission Minutes Planning Case 11-011; Preliminary and Final Plat, Zoning Code Amendment, and Master and Final PUD for Phase 1; TAT Properties and Select Senior Living; 1201 County Road E –Public Hearing City Planner Meagan Beekman stated the applicant has requested a Zoning Code Amendment, Preliminary and Final Plat, and Master and Final Planned Unit Development (PUD) to subdivide the property at 1201 County Road E into two parcels and reuse the existing building as assisted senior housing. She provided additional background information. The Planning Commission must make a finding as to whether or not the proposed application meets the requirements of the Zoning Code, advances the goals, and principles within the Guiding Plan for the B-2 District, and would adversely affect the surrounding neighborhood or the community as a whole. City Planner Beekman stated Staff offers the following findings of fact for this proposal: General Findings: 1.If the proposed Zoning Code changes in Planning Case 11-011 were approved, nursing homes and assisted living would be a permitted use, under certain circumstances, within an approved PUD, in the B-2 District. 2.The Master and Final PUD process allows flexibility with the implementation of the City’s subdivision and zoning regulations. 3.The proposal is not anticipated to adversely impact nearby properties through nuisance, noise, dust, glare, or unsightliness, and will not otherwise adversely impact the health, safety, and welfare of the community because the use is located in a commercial district that has been identified as an appropriate location for a mix of uses including multi-family housing. 4.The proposal is anticipated to decrease parking and traffic on the site compared to a student housing or hotel use. 5.The proposal is in keeping with the principles of the Guiding Plan for the B-2 District due to the existing configuration of the site, and the addition of Lot 2 as a development opportunity in the B-2 District. 6.There are no delinquent property taxes, special assessments, interest, or City utility fees due upon the subject parcel. Proposed Special Requirements for Nursing Home and Assisted Living facilities in the B- 2 District: 7.The building to be used will be upgraded to meet all applicable building and fire codes. 8.Each room will have its own bathroom. 9.The capacity of the building will not be exceeded. Planned Unit Development Review Findings: 10.Lot size, building and landscape coverage, and setbacks are met by the proposed plans. 11.All parking lot and landscaping requirements are met or exceeded by the proposed plans. 12.All Zoning regulations are met or exceeded by the proposed plans. 13.The design standards that can be applied to this application are substantially met by the proposed plans. 14.Required number of parking stalls is exceeded by the proposed plans. 15.The project is subject to park dedication requirements. City Planner Beekman stated Staff recommends approval of Planning Case #11-011 for a Preliminary and final Plat, Zoning Code Amendment, and Master and final PUD at 1201 County Road E subject to the following conditions: 1.The project shall be completed in accordance with the submitted plans as amended by the conditions of approval. Any significant changes to these plans, as determined by the City Planner, shall require review and approval by the Planning Commission and City Council. 2.The applicant shall file the Final Plat with Ramsey County within one year of City approval, or the approval for the Final Plat shall expire, unless extended by the City Council prior to the approval’s expiration. Extension requests must be submitted in writing to the City at least 45 days prior to the expiration date. 3.A development agreement, drafted by the City Attorney, shall be signed by the property owners of both Lot 1 and Lot 2 prior to the execution of the Final Plat. 4.The applicant shall provide drainage and utility easements, in favor of the City, in accordance with 1130.05 of the City Code, prior to the execution of the Final Plat. 5.The applicant shall dedicate to the City a ten-foot wide pedestrian easement along the property line adjacent to County Road E, within which the six-foot wide sidewalk shall be constructed. 6.A 25 by 25 foot easement shall be granted, in favor of the City, at the corner of County Road E and Lexington Avenue for the purpose of a future civic monument/gateway feature. In exchange for the easement, the City shall not ask the developer to pay for any portion of the feature at the time it is installed. 7.The applicant shall provide for park dedication in an amount of $133,350. The park dedication shall be paid in full prior to the execution of the Final Plat, or the property owner shall enter into an agreement for a payment plan that is in accordance with Section 1130.08 Subd E of the City Code. 8.The applicant shall obtain all necessary permits, including, but not limited to, NPDES, Rice Creek Watershed District, Ramsey County, and City Erosion Control Permits. Copies of all necessary permits shall be submitted to the City prior to the issuance of any development permits. 9.Fire Hydrants shall be located within 150-feet of the Fire Department Connections (FDC) to each building on Lot 1 and Lot 2. 10.The applicant shall submit a financial surety in a form acceptable to the City Attorney for 125 percent of the cost of materials and installation of the landscaping plan prior to the City issuing any development permits. The City shall retain the financial surety for at least two years after full implementation of the landscaping plan. The financial surety shall only be released upon successful inspection of the landscaping by the City Planner, which shall only occur during the growing season. 11.The applicant shall obtain a certificate of occupancy for Lot 1 within one year of the approval date of the development agreement, or the Master and Final PUD approval shall expire, unless extended by the City Council prior to the approval’s expiration date. Extension requests must be submitted in writing to the City at least 45 days prior to the expiration date. 12.Lot 1 shall comply with Chapter 1306, Special Fire Protection Systems, of the State Building Code, which requires the installation of a fire sprinkler protection system that complies with NFPA 13, subject to the approval of the Fire Marshal, prior to the issuance of a Certificate of Occupancy. 13.Lot 1 shall comply with all provisions of Chapter 14 of the City Code regarding property maintenance, subject tot eh approval of the Building Official, prior to the issuance of a Certificate of Occupancy. 14.Permanently affixed bicycle racks shall be provided near all primary entrances to the building on Lot 1, subject to the approval of the City, prior to the issuance of a Certificate of Occupancy. 15.The applicants shall install additional landscaping and a three-foot decorative wrought iron fence between the parking located in the front of the building on Lot 1 and the sidewalk, subject to the approval of the City Planner. 16.The applicant shall remove all portions of the bituminous parking lot on Lot 1 that is not required by the Fire Department for access to the rear of the building as part of the development of Lot 1. 17.All exposed soils, not considered improved hard surfaces or perennial planting areas, shall be seeded or sodded, with an approved grass mixture. 18.The applicant shall submit to the City shared maintenance agreements between Lot 1 and Lot 2 prior to the issuance of building permits for Lot 2. 19.Traffic management shall be implemented at the eastern most driveway, subject to the approval of the Public Works Director, to effectively provide efficient and safe ingress and egress to Lot 2. Traffic management devices may be installed at the time of Lot 2 development, subject to the approval of the Public Works Director. 20.The applicants shall agree to waive their right to appeal future assessments related to the installation of landscaping, street lighting, benches, and other pedestrian features associated with the County Road E streetscape improvements, in an amount to be negotiated with the applicant. 21.The applicants shall provide to the City temporary construction easements for implementing the County Road E streetscape improvements, provided the City repair and replace any disturbances on applicant’s property. City Planner Beekman stated Condition 6 should read: Prior to ten years elapsing or upon any future PUD approval of the parcel the City may incorporate a civic feature into the northwest corner of County Road E and Lexington Avenue. Chair Larson opened the floor to Commissioner comments. Commissioner Zimmerman asked if there were State or County licensing requirements for nursing homes. He stated these requirements should be met prior to the issuance of a Certificate of Occupancy. City Planner Beekman stated there were licensing requirements that would need to be met and this is included in Condition 11, although it does not specifically state these. Commissioner Holewa stated the intersection of Lexington and County Road E is a high traffic area and does experience backups currently. He expressed concerns that the development of both properties would further increase the traffic problems in this location. Mr. Steve Manhart, Traffic Engineer for RLK Inc., stated he had looked at this intersection during the peak a.m. and p.m. hours. He expressed some concerns about the stacking that currently occurs at Lexington Avenue and County Road E but there are things the City could do to alleviate some of these problems. He suggested the City talk with the County about alternatives for timing or sequencing lights in this area. The study did look at different business types for Lot 2 because the occupants of the property are not identified at this time. Based on the information available the traffic generated will not have a significant impact on the traffic. Commissioner Holewa asked why there was no traffic in the a.m. if there was retail on Lot 2. Mr. Manhart stated the typical hours for retail are later morning to late evening. With an opening time of 10:00 most retail businesses will not have traffic to or from the facility until 9:00 or later and this is considered to be after the peak a.m. hours. The traffic study looked at the peak hours only. Commissioner Holewa stated there was a lot of traffic movement in Arden Hills during the mid-day and he asked if the mid-day traffic had been considered. Mr. Manhart stated only the a.m. and p.m. peak hours were looked at. Commissioner Hames asked if the Rail Road tracks and passing trains had been considered in the traffic analysis. Mr. Manhart stated the trains had not been considered in the analysis. Commissioner Holewa asked if development on both sides of County Road E were considered in the traffic analysis. Mr. Manhart explained the traffic analysis took into account all available information and this included a full build of the Arden Plaza site. Commissioner Thompson asked if the comments sent to the City by Mr. Brausen had been addressed. City Planner Beekman stated Staff would need to look into these comments further and she could not address them directly at this time. Commissioner Thompson requested Staff talk with the developer in regards to the possibility that a light may be put in place in the future and this might lead to the necessity to realign the curb cuts. Mr. Joel Larson, Select Senior Living, reviewed the proposal for an assisted living facility to be located in the Holiday Inn facility. There will be approximately 150 beds. They would like to have flexibility in the number of beds they have available for each category. They are currently looking at 14 independent rooms, 106 assisted living rooms, and 30 memory care rooms. They are also looking into options for the pool and the ability to open it for public therapy. The yare also proposing a similar streetscape plan as Presbyterian Homes has in other locations. Commissioner Zimmerman asked if there were regulations on the number of caregivers that would be required for the number of rooms and the type of care that was provided. Mr. Larson stated there are regulations and based on the types of rooms they are proposing there will be approximately 25 daytime employees including maintenance, housekeeping, and chefs. Chair Larson asked how this proposal was different from past proposals brought forward. Mr. Davidson, TAT Properties, stated at this time there is an identified user for the Holiday Inn property that is not a temporary use. Having the property subdivided will enhance the development for lot 2. Lot 2 will be clearly defined as to size and location. There are no tenants identified at this time. Conceptually there could be a 20,000 square foot facility on Lot 2 but this will be something that is determined by the tenant. The actual size of the facility could be smaller. Commissioner Holewa stated the reports show the traffic after full build would be less than the traffic that is generated by a hotel. The property has not been a hotel for a number of years. Over the last few years the Holiday Inn has been used as student housing and this use has not produced an increase in peak time traffic because the students were bussed. Mr. Davidson clarified if the facility were to be a fully operation hotel then the amount of traffic generated from this use would be the same or less than the traffic projected by the proposal. Commissioner Holewa asked for clarification regarding Condition 6. City Planner Beekman stated as part of the Guiding Plan, a civic monument or gateway sign had been included on the corner of Lexington Avenue and County Road E. What will be located on this particular corner has not been identified at this time. The Arden Plaza development is expected to include an Arden Hills gateway sign. If this occurs then a different type of civic monument would be created for the north corner Chair Larson opened the public hearing at 7:23 p.m. Chair Larson invited anyone for or against the application to come forward and make comment. The being no comment Chair Larson closed the public hearing at 7:24 p.m. Commissioner Zimmerman stated Condition 11 should be amended to also require all applicable State and County licensing be in place prior to the issuance of the Certificate of Occupancy. Commissioner Holewa stated traffic will continue to be a problem for County Road E and Lexington. The B-2 Guiding Plan does have a traffic signal proposed in this location to alleviate traffic issues but this may not happen. He suggested in the future the traffic counts be reviewed over the mid-day as well because there is significant traffic in Arden Hills during this time Commissioner Zimmerman moved and Commissioner Thompson seconded a motion to recommend approval of Planning Case 11-011 for a Preliminary and Final Plat, Zoning Code Amendment, and Master and Final PUD at 1201 County Road E, based on the findings of fact and the submitted plans as amended by the conditions in the June 8, 2011, Planning Case Report and the amendment to Condition 6 and Condition 11 recommended by the Planning Commission. The motion carried unanimously (5-0). B Attachment Ordinance 2011-007 and Publication Summary City of Arden Hills City Council Meeting for June 27, 2011 Ordinance 2011-007 STATE OF MINNESOTA COUNTY OF RAMSEY CITY OF ARDEN HILLS ORDINANCE 2011-007 AN ORDINANCE AMENDING SECTIONS 1320.05 AND 1320.085 SUBD. 5 OF THE ZONING CODE TO ALLOW NURSING HOME AND ASSISTED LIVING AS A PERMITTED USE WITHIN THE B-2 DISTRICT WITH AN APPROVED PLANNED UNIT DEVELOPMENT The Arden Hills City Council hereby ordains that Chapter 13, Sections 1320.05 and 1320.085 Subd. 5 of the City Code are hereby amended as follows: 1320.05 Land Use Chart. Zoning Districts: Uses:R-1 R-2R-3R-4NBB-1B-2B-3B-4CCGB I-1 I-2 I-FLEXMRMB Nursing home and assisted living ====C====CP CC C C ======== D 1320.085 Special Requirements for the B-2 General Business District. Subd. 5 Nursing Home and Assisted Living Additional Planned Unit Development Criteria. In addition to meeting the requirements of Section 1325, an existing hotel-motel use may be used for nursing home and assisted living upon approval of a Master Planned Unit Development provided that all of the following requirements are met: A. The building to be used for nursing home and assisted living meets applicable building and fire codes as determined by the Fire Marshal and Building Official; B. Each room that has occupants on an overnight basis shall have bathroom facilities within the room; C. The capacity of the building shall not be exceeded Page 1 of 2 Ordinance 2011-007 Effective Date . This Ordinance shall become effective the day following its publication. th Adoption Date. Passed by the City Council of the City of Arden Hills the 27 Day of June, 2011. ___ DAVID GRANT, MAYOR ATTEST: PATRICK KLAERS CITY ADMINISTRATOR Publication Date: July 7, 2011 Page 2 of 2 CITY OF ARDEN HILLS COUNTY OF RAMSEY STATE OF MINNESOTA SUMMARY OF ORDINANCE NO. 2011-007 th On the 27 day of June, 2011, the Arden Hills City Council adopted Ordinance No. 2011-007, and by at least four/fifths affirmative votes pursuant to Minn. Stat. §412.191, Subd. 4, directed that a summary of Ordinance 2011-007 be published. Chapter 13, Sections 1320.05 and 1320.085 Subd. 5 of the City Code are collectively known as Ordinance 2011-007 entitled “Nursing Home and Assisted Living Uses in the B-2 District.” The purpose of the amendments is to allow nursing home and assisted living as a permitted use within the B2 District with an approved Planned Unit Development. The amended regulations will go into effect on July 7, 2011. A full copy of Ordinance 2011-007 is available for inspection by any person during regular business hours at the office of the City Administrator, 1245 West Highway 96, Arden Hills, Minnesota 55112. C Attachment June 7, 2011 Traffic Study and Traffic Management Solutions City of Arden Hills City Council Meeting for June 27, 2011 MEMORANDUM TO : Rob Davidson rob@davidsoncos.com COPY: Vernon Swing, P.E. vswing@rlkinc.com FROM : Steve Manhart, P.E., PTOE, PTP smanhart@rlkinc.com DATE : June 6, 2011 RETraffic Study – Select Senior Living Site & Conceptual Parcel : N.W. Quadrant - Lexington & County Road E Property, Arden Hills, MN RLK Project No. 2011-052-M RLK Incorporated has been asked to review the trip generation and traffic impacts associated with the development of the properties in the northwest quadrant of Lexington Avenue and County Road E in Arden Hills, MN. The existing land use consists of a former 150-room Holiday Inn hotel with restaurant/bar and conference facilities. The hotel has closed, and the hotel site is currently being used as a temporary apartment/dormitory for a nearby college. The hotel site and a vacant parcel at the east end of the site are being considered for redevelopment. Under consideration at this time for the hotel site is an assisted living facility called Select Senior Living. There are numerous land use options being considered for the vacant parcel to the east. The purpose of this memo is to analyze the traffic impacts associated with the trip generation potential of each land use option and the access considerations to and from the site onto County Road E. Trip Generation For this assessment, RLK used rates and equations found in Trip Generation, Eighth Edition, published 1 by the Institute of Traffic Engineers. This report lists the numbers of trips that one might expect to be generated by particular land uses based on a variety of variables (numbers of units, numbers of employees, per thousand square feet of floor area, etc.). The trip generation for the site while it was a 150-room hotel was 1,338 trips per day. That included 101 trips to and from the site in the A.M. Peak Hour (7-8 A.M.), and 105 trips to and from the site in the P.M. Peak Hour. The proposed reuse of the former hotel site is to convert the building into a 150-bed Assisted 1 Trip Generation, Eighth Edition, Institute of Transportation Engineers, Washington, DC, 2008 Living Center. Table 1 shows a comparison of the trip generation potential of the 150-bed Assisted Living Center with the 150-room hotel use. Table 1. Trip Generation Comparison – Hotel vs. Assisted Living Center Trips Generated: Land Land Use Type Size Use AM peak PM Peak Weekday Code ADT Enter Exit Enter Exit Assisted 399 14 7 15 18 Living Residential 254 150beds 21 total 33 total 1,338 59 42 51 54 Hotel Lodging 310 150 rooms 101 total 105 total This comparison shows that the assisted living will generate approximately 30% of the traffic that was evidenced by the previous hotel use, or nearly 940 fewer trips per day. Similarly, the peak hour trip generation of the assisted living center will be 20-31% of the trips generated when the site was a hotel. (This equates to 80 fewer AM peak hour trips and 72 fewer PM peak hour trips.) This stands to reason as an assisted living center has residents who do no drive, and the trips generated are by staff, visitors and deliveries. The hotel use, in comparison, generates trips from guests, staff, bar/restaurant patrons, conference/meeting patrons, visitors and deliveries, among others. Thus the hotel use generates significantly more trips. In regard to the adjacent parcel to the east, several land use types are being considered and the information contained in Table 2 illustrates the trip generation comparison of these uses. These uses vary in size based on the typical building size and parking required for each type. Page 2 of 7 June 6, 2011 RLK Incorporated Co. Rd. E & Lexington Traffic Study 2011-052-M Table 2. Trip Generation Comparison – Various Land Use Types Trips Generated: Land Land Use Type UseSize AM peak PM Peak Weekday Code ADT Enter Exit Enter Exit Specialty 886 - - 24 30 RetailRetail814 20,000Sq. ft. 0 total 54 total Fast-Food 1,488 Restaurant 76 73 52 49 w/drive-thru Services 934 3,000 Sq. ft. 149 total 101 total Community 371 Bank w/drive 21 10 32 33 thruServices 911 2,500Sq. ft. 31 total 65 total Medical 36 10 19 50 720 Office Medical720 20,000Sq. ft. 46 total 69 total Pharmacy 1,411 24 18 83 83 w/drive thru Retail 881 16,000 Sq. ft. 43 total 166 total As shown previously an assisted living center will generate fewer trips than the previous hotel use. Overlaying these trips with those projected for the Lot 2 land uses listed above gives a property-wide view of anticipated traffic demand. Table 3 summarizes the combined totals. Page 3 of 7 June 6, 2011 RLK Incorporated Co. Rd. E & Lexington Traffic Study 2011-052-M Table 3. Trip Generation Comparison – Assisted Living Combined with Various Land Use Types Land Use Trips Generated: Land Combined Type UseSize with Assisted AM peak PM Peak Weekday Code Living ADT Enter Exit Enter Exit Specialty 1,285 14 7 39 48 RetailRetail814 20,000Sq. ft. 21 total 87 total Fast-Food 1,887 Restaurant 90 80 67 67 w/drive-thru Services 934 3,000 Sq. ft. 170 total 134 total Community 770 Bank w/drive 36 17 47 51 thruServices 911 2,500Sq. ft. 53 total 98 total Medical 50 17 34 68 1119 Office Medical720 20,000Sq. ft. 67 total 102 total Pharmacy 1,810 38 25 98 101 w/drive thru Retail 881 16,000 Sq. ft. 64 total 199 total In conclusion, an assisted living center will generate fewer trips than the previous hotel use. The assisted living use can be combined with other uses on the vacant parcel and still be in approximately the same range of trip generation or less than the previous hotel use. Traffic Analysis Additional analysis has been conducted to determine the effect trips from these land uses may have on the traffic conditions along County Road E, Lexington and any other adjacent street intersections. Traffic operations for peak hour conditions within the study area were analyzed using the industry-standard SYNCHRO/SimTraffic software package, which uses the data and methodology contained in the 2000 Highway Capacity Manual, published by the Transportation Research Board. The software model was calibrated using existing conditions before being used to assess future conditions. The operating conditions of transportation facilities, such as traffic signals and stop-controlled intersections, are evaluated based on the relationship of the theoretical capacity of a facility to the actual traffic volumes on that facility. Various factors affect capacity, including travel speed, roadway geometry, grade, number and width of travel lanes, and intersection control. The current standards for evaluating capacity and operating conditions are contained in the 2000Highway Capacity Manual Page 4 of 7 June 6, 2011 RLK Incorporated Co. Rd. E & Lexington Traffic Study 2011-052-M (HCM). The procedures describe operating conditions in terms of a Level of Service (LOS). Facilities are given letter designations from “A,” representing the best operating conditions, to “F,” representing the worst. Generally, Level of Service “D” represents the threshold for acceptable overall intersection operating conditions during a peak hour. The acceptable threshold for a particular movement at an intersection depends on both the priority assigned to that movement and its traffic volume. In general, the higher the priority and the higher the traffic volume, the more stringent the acceptable threshold will be. For example, the acceptable threshold for a high-priority/high-volume suburban movement might be “C,” while LOS “F” on a low-priority/low- volume urban movement might be appropriate. For side-street stop-controlled intersections, a key measure of operational effectiveness is the side-street LOS. Long delays and poor LOS can sometimes result on the side street, even if the overall intersection is functioning well, making it a valuable design criterion. Again, depending on priority and traffic volume, acceptable side-street LOS can range from “D” to “F.” A final fundamental component of operational analyses is a study of vehicular queuing, or the lineup of vehicles waiting to pass through an intersection. An intersection can operate with an acceptable level of service, but if queues from the intersection extend back to block entrances to turn lanes or accesses to th adjacent land uses, unsafe operating conditions could result. The 95 percentile queue, or the length of queue with a 5% chance of occurring during the peak hour, is considered the standard for design purposes. To assess the background traffic conditions, RLK used the Existing PM Peak Hour Traffic Volumes that 2 were recorded in the Traffic Impact Study developed as part of the Guiding Plan for the B2 District. Access Considerations Due to access management considerations along County Road E, access to the development parcels has been limited to three driveways. The westerly site driveway is approximately 975 feet west of Lexington Avenue. The central driveway for pick-up/drop-off access to the front of the senior center is approximately 775 feet west of Lexington. The proposed driveway accessing the east side of the senior center and the conceptual parcel is approximately 425 feet west of Lexington. The City of Arden Hills has recommended an eastbound one-way traffic flow for the pick-up/drop-off traffic at the front of the senior center. In other words, traffic would enter only at the driveway 775 feet west of Lexington. After pick-up and drop-off, this traffic would join the other site traffic at the eastern driveway 425 feet west of Lexington. Both the eastern driveway and the western driveway would be full access driveways. The City has recommended that traffic once on the site at the easterly driveway be restricted to turning right only toward the east side of the senior center and the conceptual parcel. This traffic would not be allowed to turn left toward the pick-up/drop-off drive. RLK tested the impacts of this alignment, as well as a westbound pick-up/drop-off drive between the easterly and central driveways onto County Road E (discussed later). 2 Traffic Impact Study, Guiding Plan for the B2 District, Arden Hills, MN, prepared by Spack Consulting, December 5, 2008. Page 5 of 7 June 6, 2011 RLK Incorporated Co. Rd. E & Lexington Traffic Study 2011-052-M Internal Circulation Aside from the one-way flow at the pick-up/drop-off drive, the other internal roadways will allow two- way traffic flow. Because the conceptual parcel has no direct access onto either Lexington Avenue or County Road E, cross access between the two parcels must be provided. The westerly drive extends to a parking area at the rear of the senior center parcel, and then turns easterly to access the parking area for the conceptual parcel. The parking area for the conceptual parcel also can be accessed via the easterly driveway onto County Road E. To model the distribution of the traffic generated by the senior center and various uses considered for the conceptual parcel, RLK looked at the trip distribution of the highest generating use being considered. Also, RLK had to determine the directional split of the traffic. For the senior center, it was assumed that 45% would use the easterly driveway, 45% would use the westerly driveway and 10% would use the pick-up/drop-off driveway. For the conceptual parcel, RLK assumed 80% would use the easterly driveway and 20% of the traffic would use the westerly driveway. Based on the trip generation calculations found in Table 2, RLK determined the heaviest trip generator for each time frame as the worst case scenario to be tested. The A.M. Peak Hour trip generation is heaviest with a fast-food restaurant with drive-thru on the conceptual parcel. The P.M. Peak Hour trip generation would be heaviest with a pharmacy with a drive-thru on the concept parcel. In this case, the trip generation for the P.M. Peak Hour exceeds that for the A.M. Peak Hour, thus the P.M. Peak Hour was considered the critical Build Condition for analysis. By applying the site trip distribution to the Existing P.M. Peak Hour traffic, as found in the Spack report, RLK was able to model the Build condition in the P.M. Peak Hour scenario. Levels of service were no worse than LOS-C for any of the study intersections. Delay and stacking distance did not appear to be significant at any of the driveways during the PM Peak th Hour. SimTraffic analyses showed a 95 Percentile Queue length of 67 feet (2-3 car lengths) at the easterly driveway, and the model showed the queue cleared rapidly as traffic entered County Road E. Alternate Pick-Up/Drop-Off Access RLK reviewed the possibility of reversing the direction of the pick-up/drop-off drive between the Eastern Driveway and the Central Driveway. Instead of an eastbound movement, RLK tested the operation of the driveway as a westbound only movement. While such an alignment does create a situation where northbound to westbound movements into the pick-up/drop-off driveway may be blocked by southbound traffic, there are so few vehicles attempting to make this movement (e.g., one or two senior center vans or occasional visitors per peak hour, etc.) that the chance of intersection gridlock is quite small. From a traffic engineering perspective, the City’s proposed alignment with the eastbound one-way flow of the pick-up/drop-off drive is conceptually better, but a westbound drive is unlikely to be an operational concern. Conclusion RLK has tested several scenarios of trip generation and traffic operation for the Select Senior Living site and the conceptual parcel to the east. It is out conclusion that the trip generation and traffic operation associated with these potential uses will operate the same, if not better than the previous use on the site Page 6 of 7 June 6, 2011 RLK Incorporated Co. Rd. E & Lexington Traffic Study 2011-052-M (Holiday Inn hotel). The access locations do not negatively impact the flow of traffic along County Road E, nor do the various proposed trip generators cause increased impacts to the overall street network. The proposed operation of the pick-up/drop-off drive will operate slightly better as eastbound only from a traffic engineering perspective, but due to its extremely low volume, westbound operation would unlikely be a concern. G:\Davidson Companies\2011-052-M\_Correspondence\Traffic Impact Study 06062011.doc Page 7 of 7 June 6, 2011 RLK Incorporated Co. Rd. E & Lexington Traffic Study 2011-052-M MEMORANDUM TO : Rob Davidson rob@davidsoncos.com COPY: Vernon Swing, P.E. vswing@rlkinc.com FROM : Steve Manhart, P.E., PTOE, PTP smanhart@rlkinc.com DATE : June 8, 2011 REUPDATE -- Traffic Study – Select Senior Living Site & Conceptual Parcel : N.W. Quadrant - Lexington & County Road E Property, Arden Hills, MN RLK Project No. 2011-052-M This morning, RLK Incorporated had a discussion with Meagan Beekman of the City of Arden Hills regarding staff reaction to the Traffic Study for this project. Meagan shared that for the most part the trip generation and traffic operations for the project were as expected. She did share that the internal circulation described in the report did not accurately reflect what was expected for the site. The report described a rear access road that would connect the westerly driveway to the easterly driveway behind the senior living center. Meagan stated that this roadway was being shown on the plans as being proof of future cross-access if needed. The initial intent was not to have this access between the two driveways. As a result, RLK revised the trip distribution on the site. The westerly driveway, therefore, will serve only the senior living center. The easterly driveway will be used by the conceptual parcel. The central driveway will still be a one-way pick-up/drop-off drive for the front of the senior living center, and will still utilize merge with the easterly driveway to access County Road E. These modifications were then modeled using the Synchro and SimTraffic software programs to analyze the traffic operation at the site. In the end, the driveway intersections operated at the same level of service or slightly better than what was described in our original report. Vehicle stacking, or queuing, remained at three vehicle lengths or less during 95% of the peak hour tested – a level that reflects acceptable traffic operation. All other findings and conclusions remain as listed in the original traffic study. G:\Davidson Companies\2011-052-M\_Correspondence\Traffic Impact Study UPDATE 06082011.doc TrafficTraffic Management Management SolutionsSolutions Phase 1: •Seniorhousingdrop-offtrafficflowfromwesttoeast Seniorhousingdropofftrafficflowfromwesttoeast Phase 2 Options: •Widen drive aisle into Lot 2 • InstallmedianseparatingtrafficflowindriveaisletoLot2 InstallmedianseparatingtrafficflowindriveaisletoLot2 •Install pork chop and eastern driveway to direct all traffic flow into the site to Lot 2 •Stripe drive lanes entering and exiting eastern driveway 1313 D Attachment June 8, 2011, Report to the Planning Commission http://www.ci.arden-hills.mn.us/planningcases City of Arden Hills City Council Meeting for June 27, 2011