Request for Council Action
Prepared By: Kristine Giga, Civil Engineer Council Meeting Date: July 25, 2011
Motion to Adopt Resolution 2011-03'7: Accepting Woxk Completed and Authorizing Final
Payment af $].9,598.30 for the Lexington Avenue Sidewalk and Trail Project
Budgeted A�nount Actual Amouni: Funding Source:
$5fl,000 — Trail A(existing trail) $52,490.62 — Tra 7 A $79,551.89 — PIR Fund
$63,OQ(1— Trail B(new trail) $54,122.5� Trail B $27,061.28 - Assessments
(Construction, Engineering and
Legal)
Recammendation:
• Mation to adopt Resalution 2011-437: Accepting the work completed as Lexingtan Avenue
Sidewalk and Trail Project and authorizing final payment to North VaIley, Inc., of Nowthen,
Minnesota, in the amount of $ I4,598.30.
Sapportin� Doc�[ments:
• Memorandum dated July 25, 2011 frorn Kristine Giga.
• Application for Payrnent #2.
• Resolution 2011-037.
�
�' �EN�HILLS
MEMORANDUM
DATE: JuIy 25, 201 I
TO: Honorable Mayor and City Councilrnembers
Patrick Klaers, City Administrator
FROM: K.ristine Giga, Civil Engir�eer
SUBJECT: Lexington Avenue Trail and Sidewalk Payment #2 anc� Final
Back�rovnd
The City of Arden Hills awarded North Vatley, Inc., of Nowthen, Minnesota, the
Lexington Avenue Sidewalk and Trail Project on September 13, 2010, for a tatal contract
amount of $90,01 l .62.
The project has been campieted in accordance with ihe p�ans and specifications.
Financial Ympiications
The table be�ow provides a history of the costs for the pxojeet:
Original Contract Amount Final Con�ract Amount
Canstruction $ 90,011.62 $ $6,26594
Engineering {MFRA} $ 16,970.00 $ 15,212.44
Engineering (Roseville} $ 3,140.00 $ 4,640.79
Lega! $ 1,Q00.00 $ 494.00
Total $111,121.62 $ l 06,613. � 7
The �nal const�uction contract amount is $3,745.68 less than the or�g�nal cor�trac�
amount. This is a result of change order approved Navember I5, 20]0, which modified
the approach to restoration by hydraseeding instea.d of installing soc� so �ate in tY�e year.
Roseville staff spent more time on construction abservation tha� originaily anticipated;
however, this reduced the hours MFRA spent on constzuction o�eservation. The City
or�ginally cor�tracted with MFRA, Inc. far engineering services through the design and
City Co€�ncil Meeting
11Metro-inet.uslardenhi}]s1AR&PW1En�ineeringlCot�ncil Acttons120 1 117-2 5-] iMemo_LexTrailPayment2and�inal.doc
Page ] of 2
construction p%ases. Legal fees include the City Attort�ey's time in �eviewing and
preparing the assessment documentation %r In�and Properties.
The following table shows a breakdown of costs for each segment of the trail. Costs
include construction, engineer�ng, and legai fees.
Original B�dgeted Original Contract Final Con#ract Amount
Arr�ount Amount
Existing Bitu�inous
Traii (Cummings Park $ Sfl,000 $ 57,12I .62 $ 52,49Q.62
Dr. ta Co. Rd. �)
New Concrete
Sidewalk (Grey Fox $ 63,000 $ 54,004.00 $ 54, I22.55
Rd. to CP Rail}
Total $133,000 $l i 1,121.62 $306,613.17
The sod quantity along the existing bituminous trail was higk�er than the quantity along
tne concrete sidewaIk. The c�ange fror� sod to hydroseed, therefore, resulted in a lower
final contract amount for this segment. There was a sIight increase in subgrade
exca�ation costs for the concrete sidewalk to ensure a praper base under the new
sidewalk.
This project will be paid for using PIR funds. 50% of the cost far the construction of the
concrete sic�ewalk will be assessed to Inland Properties. This amount, $27,061.2$, will be
divided evenly between Cub and Shannan Square so that each garty is assessed
$13,530.64. This assess�ent will be brought to the City CounciI for certifcation at an
upcorning council rneeting.
Coa�cil Action Reqe�ested
Approve Resol�ztion 20t l-037 accepting the work cornpleted as Lexington Avenue
Sidewalk and Trai1 Project and authorizing fnal payment to North Valley, Inc., of
Nowthen, Minnesota, i� the amount of $13,598.3Q.
City Council Meeting
11Metro-anet.uslardenhillslPl2&PW1EngineeringlCo�€�cil Actions1201117-25-I1Memo_LexTrailPayment2andFinal.doc
Page 2 of 2
W
�
a
�
�
m
�
�
�
c
�
�
Z
�
s
� ��
�
z
�
.���
Tr
3�iwW
��
� Y:
K���rrr ¢
� 7
¢ �¢
V C
� �
g� t�
�
3 �d
� �o
o =W
�
� 4�
�� ��_
�`� ���� �
��� �_tf e
u�� a
� � �
W � �
1
f � �
� �� �
'���w
� ¢
? �� �
� � �
� }
� � �
W�4 �� �a � �
� r a d �� � a�
Qm m me � ��
- Y� �P.Ri � �
G � er m�
� ~ w �
1 �
T �'
� �
IA 5y
W �j
� � G
tl 9
� s �
a �
¢ w � �.
� �y �"�� � � v �
� �� ��Q � �S _ � h
8 �� oa� � � w
. �¢ �¢� e� � ��
. �m � � r. �n �
� �W� �w 0 . Q�'
�
�
�
�
Y
A
�
�
�
����b�� ���5 � o ��� BvnS�S$S�
a g������ � �� � � Y�� ��������� �
w� o a ,. T N,. � � v � r c+� .- c�
� ��
r
a p � v�
O y N 4[; O O O Op O[p O Vr O G O � �O.5 O O O O Op� O O�y Vl p p p
�'�" F O�I!] dm� W[9� � �a � �1���N� W�I�BQiV Q
� Z W � S� F
a r
�
O '
$9S8a888888$ ,e o 588�8Sti$�SS$p
�� �W�Si���r���3� �� � �����������5° �
p� tv W t3.- cJ r M1 ai � i+� r N� 'e�
¢ �
¢ di w
Q� N o O O O tl O O 4 vt C o O uj o O O O Q 4 d O� O Q Q
o�vGC ��� �� � w d � �� ��wr ��F�O�No
� � m
Q
8S88F$8S�$$S$ g $$$$8$$88$8$a
,F� cc00000 oodo d � 000eopoc00000 �
�
�
N
w
�
�
�
�
�
�
6
Q
�
�
_
V
t� y
Oq e O, O P O Q Q P Q tl O O O R O g O O o o O O O o
C¢ d O� C O CS P O G a O G G O C O C d p q q p C O
�� �, $53$S�38SNSSS� S � 888�8��38R8S8;° �
o� �� �������3��p$� q � ���������oo$� �
�� � ��N�o W � � � �� �
$ .- �
� �
� n6�ei$�t�ginc�$$q � S�S�SvnNS'iS�g4
� �nd�v.-uirNS$" �"''r��"e�''s�mv�'$ �i"
�� N �P' �
C7 �
z
� �K
��
�
Ua
�
m
�
�
�
4
�
0.
�W
xz
z `-
�`� �
�� �
� � LL `
�l i G
�JNUf�NN..�]N-7[il� � �1 VJUUN JNlLLA�.i W f/5
a a�O�eOP'O`,OaO o 0 0 oavo0atlO00u100 O
� ����o� ,.� � ���..��������
Y
m
m
Q
E � � �c m
i �y� E ?�
�a s m � � � m af �
���x3���t � � ������g � ❑
������ �� ` � ���,��a��� � m
�ad����°`��� � � .���E���g°��� �
a �EyC� �� oEaES'tg�'2� c �
�x¢v�4�mc�rs�'-�c7� �a � �d'cs3�i`vc�tc�r��i��i w
__ _ __ __ _ _ � �[�
_ Or N � W � mmo.-e�maenm � eim
O � p o
� � �
ci v
�
C t� f�
W
�g � �
o� �
�
S g S
� � �
�$ $ k
� P O �
o' p
N
� � O
�
�� � �
� �
�� � �
n� $
V! N N
O O o
�g �
�
� �
�
N 2 �!1
N
da�$ � $ $ �
� N � � � � �
: w
� � �
O O Q Q �
G � w �
��°,8S$ S ��., °' p
���� r � � �
�,S o� ti .- •' � o
n
N H H
�044�{ �
�t�1 r W M1
�oSS � �
g,�cdc a � � �
�1 YI 10 �
�9 VJ H
� � G d O
n�$� � a oo y
���W � m � �
�riN� � � � N
�
M64tliM 19 N M dJ
P o�i. O 4 O
o: c�i od vi T
(�/JNrN f)
a000 0
���� �
Q
�
. �
z
�
a °a
� m
�
a� � a
s �� � � �
0
E � � ` m �" �
y��'� � � �Tp� �
lq �} � V
d
�
�
�
�
�
�
EN HILLS
CITY OF ARDEN H�LLS
COUNTY OF RAMSEY
STATE OF MINNESOTA
RESOLUT�ON NO. 2011-037
A RESOLUTION ACCEPTING WORK COMPLETED AND AUTHORIZING FINAL
PAYMENT FOR THE LEXINGTON AVENUE SIDEWALK AND TRAYL PROJECT
WHEREAS, pursuant to a�written contract signed with the City on. Septernber 13, 2D10,
�or ti�e Lexington Avenue Side�va.tk and Trail Project, North Valley, Inc., of Nowthen,
Minnesota, Minnesoia, has satisfactorily connpleted the improvements associated with this
contract;
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF ARDEN HILLS,
MINNESOTA: That the work co�npleted under said contract is hereby accepted and approved;
and
BE IT FURTHER RESOLVED: That the City Administrator is hereby directed to issue a
proper order for the final payment of such cantract, taking the cantractor's receipt in fiill.
AD4PTED BY THE CITY C4UNCIL OF THE CITY OF ARDEN HILLS THIS
25th DAY OF JULY, 2011.
David Grant, Mayor
ATTEST:
Patrick Klaers, City Administra#or