Loading...
HomeMy WebLinkAbout4B, Planning Case 11-019 – Hood Packaging PUD Amendment� EN HILLS Request for Council Action Prepared By: Meagan Beelanan, City 1'�anner Council Meeting Date: S�piember 26, 2011 Planning Case 11-019 -- Hood Packaging PUD Ameudment Budgeied Amount: Actual Amount: F�nding Source: NA NA NA Reco�rtmendation: Approve �lanning Case 11-019 for a Planned Unit Developnr�.ent Ainendment at 1887 Gateway Boulevard, based on the findings of fact and the subm.itted plans, as amended by the �our condifion� i� the September 26, 2011, r�port to the Ciry Council. Sunnoriin� Documents: 1. Memoarandum from Mei-Ling Andersan, dated September 26, 2011. 2. September 7, 2011 Draft Planning Corr�mission Min�tes. 3. September 7, 2011, Report to the Plaru�ing Commission — http://www.ci.a�rden- hills.mn.us � �^i EN HILLS MEM�RANDUM DATE: September 26, 2011 TO: Honorable Mayor and City Councilmemhers Patrick Klaer�, City Administrator FROM: Mei-Ling Anderson, Co�nmunity Development Intern � �� SUB.TECT: Planning Case #l.1-019 — This Request Requires a PubIic Hearing Applicant: Hood Packaging Corporatian Property Location: 1887 Gateway Boulevard Request: Planned Unit Development Amendment Re uested Action Motion to appxove Planning Case 11-019 for a Planned Unit Development Amendment at 1887 Gateway Boulevard, based on the findings o� fact and the submitted plans, as amended by the four conditions in the September 26, 2011, report to the City Council. Back�round Hood Packaging, Iocated at 1.887 Gateway Boulevard, is a national company that manufactures vario�s types of pa�er and plastic packaging praducts. They are a conforming use in the Gateway Business Zone. There are cunrently four storage tanks on the praperty that were built following the appxova� of two previous planning cases. This request would add one containment tank and two silos io ihe southeasterr� side of the property, which is used for storage anci loading. The containment iank would be located betvveen the proposed silos and the building. The t�wo silos in the applzcaz�t's request would be 24 feet tall and 12 %et in diameter, and would be placed upon a single 16 by 32 foot concrete pad. The applicant has indicated that the ,silos would be painted with a high salid polyurethane enamel (semi-gloss f nish) to match the exterior City ofAt-clen Hills Crty Council Meeting for September 26, 2011 P: lPlanninglPla�vting Casesl2011111-019 - Flood Packaging PUD Arnendmerrt {PC Approved}ITO D0109-26-I1 - CC Report.�Iocx Page 1 of 4 af the main bui�ding on the pro�erty. The silos are needed to store plastic resin pe�lets that would be used to supply the company's n�w ex#rusion laminator machine. The applicant's request also includes a 10,400 gallon confainment tank. The tank would be approximately 13 feet tall, 12 feet in diameter, and �vauid be made of white plastic. A new s�orage room is being constructed within the building to hold multiple 55-gallon closed drums containing ink. The room is designed to be explasion-prooi since the ink has potential to be flarnlnable. According to the Fire Marshal, �the exterrial containment tank must b� able to hold �lie contents af one of the drums if there �ovas a spill. In the event of an accident, the ink wo�ld be pumped into the proposed containment tank on the e�ierior of the building. Additionally, in the event of a spiIled barrel, the contai�nent tank would also need to be able to ho�d 30 minutes worth of water runoff from the sprinkler system in order to su�press a f re or otl�er hazard. All of the material would be contained within ihe silos, piping, iaminator, and containment tank. The project is designed to protect the exterior fram potential nuisances. The pipes as well as the silo tanks would be constructed with double walls. The addition of the three structures is not expected to impact acce�s traffic circulation, nor would it have an impact on loi coverage a.�d parking. The applicant has submitted two letters addressing ihe details of the applicaiion, a site plan, az�d rz�ea,surements of the proposed structures (Attachment B). Evaluation Criteria Section 1320.13 of ihe Arden Hills Zaning Code states that site modificaiion proposals in the G- B District shall be reviewe�. according to the criteria far eval�ating Conditional Use Perrnit (CUP) Amendments as listed in Section 1355.04 5ubd 3. The Planning Cornrnission and City Council s�all consider ihe effect of the proposed use upon the health, safety, convenience a�d general weliare of the owners axzd occupants af the sur�rounding land, in particuIar, and ihe cammunity as a whoi�, in general, including but not lirz3ited to the follawing factors: 1. Existing and anticipated traffic and parking condiiions; 2. Noise, glare, odars, vibration, smoke, dust, air polluiion, heat, liquid or solid waste, az�d o�her nuisance character�stics; 3. Drainage; 4. Popuiation density; 5. Visual and iand use coznpatibility with uses and structures on surrouz�ding land; adjoining land values; b. Park dedications where applicable; and the 7. Ord�rl� development of the neighborhaoc� and the City within the general purpose and intent of this ordinance and the Cornprehensive Deve�opment Plax� for the City. City ofArden Hills Ciry Council Meeting for September 26, 2011 P:V'lanningll'IahningCases12011111-019-HoodPackagrngPUD�4mendment(PC�Ipproved)1TDDOIQ9-2G-11 -CCReport.docx Page 2 of 4 Findin s of Fact The Planning Comrriission offers the fallowing twelve findings af fact far review: Gene�al Findzngs: 1. Hood Packaging Corparation is a conforming use in the Ga#eway Business Zone. 2. The PUD process allows £or flexibility within �the City's regulations through a�egotiated process with a developer. 3. The applicant proposes to add two storage silos and one containment iank to the southeast side of the building. Each silo is twenty-four feet tall, twelve feet in diameter, with a capacity to hold sixty-five thousand poiu�.ds. The containment tank is approximately thirteen feet tall, twelve feet in diameter, wiih a capacity to hold ten thousand gallon�. None of the proposed str�ctures vvill exceed the height of the building. 4. This proposal wili not impact lot coverage requirernents, nar wi.11 it encroach on setbacks. On the Conditional Use Plan Evaluation C�iteria: 5. The proposal will not irnpact iraffic circulation or parking. 6. The proposal is not expected io alter existing noise, glare, odors, vibration, smolce, dust, air pollutian, heat, liquid or solid waste, or other n�isance characteristics. The tanks a�d connecting pipes will be double-walled to contain the material. 7. The proposal wili not impact drainage on the site. S. The proposal will not impact population density on the site. 9. The proposed silos will be painted to maich the color oi the building while the containment tank is co�nposed af white plastic. AIl proposed structures are un�ikely to significantly impact the subject property or surrounding pxaperties. 10. Park dedica#ion requirements do z�ot apply. 11. The prapasal is not anticipated io create a negative impac� on the immediate area or #he corn�unity as a whole. 12. The proposal does not conflict with the 2030 Comprehansive Plan. Recommendation Ai their September 7, 201 ]. meeting the Planning Co�mission voted unanin�ousIy to recammend approval of Planrung Case 11-019 for a P�anned Unit Developrz�ent Amendment at 1887 Gateway Boulevard, based on ihe Findings of Fact and the submitted plans, as amended by the following four conditions: 1. The project shall be completed in accardance with the plans submitted as amended by the conditions of approval. Any significant changes to these �lans, as detez�mined by the City Planner, shall require review and approval by the P�anning Commission and City Council. City offlyden Hills City Council Meeting for September 26, 2011 P.• lPlanninglPlanning Cases12011111-019 - Hoorl Packaging PUD timeraa`ment (PC ApprovedJ ITO DO109-26-II - CC Report.docx Page 3 of 4 2. The three tanks sha11 meet a11 applicable Zoning, Building, and Fire Code regu�ations. The applicant sha11 obiain all required pe�its prior to installation. 3. The three tanks atad cannecting systems shali compiy with the odor, noise, and other applicable Minnesota Pollution Control Agency regulatzons. Failure to comply wi�h �hese reg�iations may result in a revocaiion of a perrnit. 4. The silos sha11 be painted to match the color of the building. O tio�s 1. Approve ihe proposal as submitted. 2. Approve t�xe propasal with conditions. 3. Deny the application with reasons fox denial. If the City denies the petiiioners req�est, ". ., it must siate in writing the reasons for tkae denial at the timE it denies tlae request." 4. Table for additional infarmation. Requested Ac#ion Motion to approve Planning Case I 1-019, far a Planned Unit Development based an the Fzndings of Fact, the submitted plans, and the conditians in the September 26, 20l 1, memo to the City Council. Deadline for A�enc� Actions The City af Arden Hills received the completed application for this request on August 8, 2011. Pursuant to Minnesota State Stat�te, tiie City rnust act on this request by October 7, 2011 {60 days), unless the city provides the petitioner with written reasons for an additional 60 day review period. The City may, rvith the consent of the applicant, extend the review period beyond the irutial 120 days. Attachments A-� September 7, 2011, Draft P�anning Commission Meeting Minutes B— September 7, 20� 1, Report to the Planning Comrnission — htt�://www.ci.arden-hills.�rin.us/planningcase City of Arden Hills City Council Meeting for September 26, 2011 P.• lPlcrnninglPlanning Cases12011411-019 - Hootl PackagingAUD Amendmeni (PC ApprovedJ ITO DQti09-26-I1 - CC Report.docx Page 4 of 4 Attachment September �, 2011, Draft Planning Commission Minutes The Planning Coanmission voted unanimous�y to recommond approval for Planning Case 11-or9. " ►- EN HILLS City of,4rden Hills City Council Meeting for September 26, 20l I September 7, 201 �, Draft Planning Commission Minutes Planning Case 11-019; PUD Amend�nent; Hood Packaging Corporation; 1887 Gateway Blvd — Public Hearing. Cammunity Development Intern Mei-Ling Anderson siated the applicani has requested Planned Unit Amendment to install fwo double-walled silos and one containment tank io the southeast side af the building at 1887 Gateway Bouievard. Community Dev�lopment �atern Mei-Ling Anderson reviewed Hood Packaging Corporation is a national campany that manufactures various types of paper and plastic packaging products. The company is a conforrnin.g use in the G-B Zone. There are currently four storage tanks on ihe proper�y that were built foliovv�ng the approval af iwo previous planning cases. This request would add one containment tank an.d two silos to the southeastern side of the property. The containment tank would be loca�ed between the praposed silos �.nd the building. There would be a distance of 4 feet between the containment tank and the concre#e pad on wT�ich the silos would sit. Commur�ity Development Iniern Mei-Ling Andersor� stated t�ie iwo silos in the applicatit's xequest would be 24 feet tall and 12 foot in diameter, and would be placed upon a single 16 by 32 foot concrete pad. The applicant has indicated that the siIos would be paintec� with a high solid polyurethane enamel (semi-gloss fnis�) to match the exieriar of the main building on the property. The silos are needed to store plastic resin pellets that v�rould be �sed to supply their new exirusion laminatar. The pellets vvould reach the inside of the building through 6-inch steel piping, which would connect the silos to the e�trusion laminator. The pipin.g wo�ld iead the pellets directly to �the hopper located. above #he machine. While the �n�imum capacity of each silo wou�d be 65,000 pounds (i,858 cubic feet), the silos are not expected to hold more than 48,000 pounds of material at any one time. Community Development Intez� Mei-Ling Anderson stated the applicant's requesi also includes a 10,000 galton cantainmeni tank. The tank would be approximately 13 feet tall, 12 feet in diameter, and would be made of white plastic. A new starage room is being consiruct�d within the building to hold muiiiple 55-gallon closed drums con#aining inlc. The room is designed to be explosion.-proof since the ink has potential to be flamn�able. According to the Fire Marsha�, the external containment tank rnust be able to hold the contents of one of the dr�irl�s if there was a spill. In the event of an accident, the inlc would be pumped into the proposed containnr�ent tank on the exterior of ihe building. Additionally, in the event of a spiIl�d barrel, the contain�nent tax�k would also need to be abie to hold 30 minutes worth of water runoff fro� the sprinkler system in order to suppress a f re or other hazard. Community Development Intern Mei-Ling Anderson reviewed the southeastern side o� the building contains approximately 1.7 acres (73,000 square fe�t) af paved surfaces and is used far storage and loading. As the silos and tank would be bui�t on top of existing imp�r�vious surface, no change in impervious coverage would occwr with this application. The addition of ihe three structures is not expected io impact access traffic circulation. There would not be any reduction in parking, as al� parking is on the other side of the building. The appIicant has submitted t�ro lettexs addressing the details of ihe applica#ion, a site plan, and measui'ernents o� tk�.e proposed sir�ctures. Some of the plans for the silos and far the containment tank are presented separateIy, as the applicant is working with two different companies on these pxajects. Cornmunity Development Intern Mei-Ling Anderson reviewed the twelve findings of fact for considexation: General Findings 1. Haod Packaging Corporation is a conforming use in the Gateway Business Zone. 2. The PUD process allows for flexibiliiy within the City's regulations ihrough a negotiaied process with a developer. 3. The applicant proposes to add iwo storage silos and one containment tank to the southeast side of the building. Eack� silo is twenty-four feet tall, twelve feet in diameter, vv�th a capacity to hold sixty-five thousand pounds. The containment tank is approximately thirteen feet tail, twelve feet in diameter, with a capacity to hold ten thousanc� gallons. None of the proposed structures will exceed the height of the building. 4. This proposal will not impact lot coverage requirern.ents, nor will it encroach on setbacks. On the Conditional Use Plan Evaluatian Criteria 5. The pxoposal vvill not impact traffic circulation or parking. 6. The proposal is not expected to alter existing noise, glar�, odors, vibration, smoke, dust, air pollution, heat, liquid or solid waste, or other nuisance characteristics. The tanks and connecting pipes will be double-walled to contain the material. 7. The proposal vvill not impact drainage on the site. 8. The proposal will not impact population density on the site. 9. The proposed silos will be painted to match the colar of the building while ihe cantainmeni tank is composed of white plastic. All proposed s�uctures are unlikely ta significantly impact the subject property or s�rrounding properties. 10. Park dedication req�irements do not apply. 11. The praposal is nat anticipated to create a negafive impact on the imrnediate area or the corr�nunity as a whole. 12. The proposal does not conflict with the 2030 Comprehensive Plan. Staff is recommending approval based on the findings of iact, subject to the fallowing conditions: 1. The project shall be completed in accordance with the plans suhmitted as aznended by ihe conditions o� appra�al. Any significant changes io these plans, as determined by the City Pianner, shall require review and approval by the Plar�ning Commission and City Council. 2. The three tanks sha11 meet alI applicable Building Code and Fire Code regulations. The app�icant sha11 obtain all required permits prior to installation. 3. The three tanks and connecting systems shall comply with the odor, noise, and, othex applicable Minnesota Pollution Control Agency regulations. Failure ta compiy with these regulatiflns may result in a revocatian of a permi�. 4. The silos shall be painted to match the color of the buildi�g. A call was received today frorn the Apache Group and they wexe concerned about the �naterial used �'or ihe containment tank and did not want it highly visible. Chair Larson opened the floar to Commissioner Comments. Chair Larson referred to Section 1325.05 Subd 4.Q and whether staff feels the painting of the silos will be screened if painted ihe saane color as the building. Commissioner Holewa asked to see the picture with the trash compactar. He asked if it could �be wheeled away if desired. Cornmissianer Thompson asked the height of tl�e cantainment tank. Community Development Intern Mei-Ling Anderson re�ponded the containment tanlc is 13 feet hig� and the �ilos are 24 feet tall. She added the Apache Group would be east and it would be a straight on view. Mr. Michael Ramirez, Plant Manager, Hood Packaging Corporation appeared before the Commission. Chair Larson asked if there was a risk of the ink catching fire. Mr. Ramirez stated there would not be a risk. They have received recornmendations froz� the Fire Marshall. Chair Larson asked why one �icture shows the compactor in one location and in another picture it's in a different Iocation. Mr. Ramirez stated it has already been anoved and it is a roll-off dumpster that is picked up approximately once a week. Commissioner Holewa asked if there was a power outage what would happen to the pu.mps going into the containment tank. Mr. Ramirez stated xhere would not be a way to pump it if the power went o�t and it would remain in ihe building. Commissioner Holewa asked if a power generator was owned. Mr. Ramirez stated they have not. Mr. Ramirez staied the roonra itself is 24 x 20 �eet at a cost of over $140,000. There was a lot of engineexing and moneq put into the storage room. Ciurently #he d.rums are not secured praperly and the new room wau�d keep the fire coniainment and spill containment and ir�crease iheir chemica.t storage capacity. Chair Larson stated in ihe past companies have used buxied tanks which is not done as often these days. Commissioner Thompson asked about Mr. Ramirez' response to the Apache Group's concerns. Mr. Rarr�irez siated ihe silos would only be visible and the containment tank would probably not be seen. Commissioner Thornpson asked if the screening code would be met. City Planner Meagan Beekman stated it's an industrial area and she does not see it to be a problem. The Apache Group wanted their concerns to be part of tlie record. Chair Larson opened the public hearing at 6:49 p.rn. Theze being no other comments, Chaix Larson closed the public hea.ring at 6:50 p.m. Cammissio�er Zimmerman moved and Commissioner Holewa seconded a motion to recommend anoroval of Planzeins Case 11-019, for a P�anned Unit Development __. rd based on the findin�s of fact, su Amendment at 1887 Gatewav Bouleva,._ � ,,,,, bmitted lans and the four conditions in �he Se iember 7 2411 lannin case re ort. The mation carried unani�nauslv (4-0). Attachment S eptemb er 7, 2 011, Report to the Planning Commission Available online at: htt : www.ci.arden-h�lls.zxin.us �-. EN HII,LS City of�Irden Hills City Council Meeting for �eptember 26, ZOII