HomeMy WebLinkAbout2C, State Aid Discussion EN HILLS Request for Council Review 2C Prepared By: Terry Maurer,Public Works Director Work Session Date: December 19,2011 Municipal State Aid System Update Old Snelling Avenue Improvement Discussion Topic: Staff is looking for direction on the Old Snelling Avenue project and is available to answer any questions regarding the MSA system. Supporting Documents: 1. Memorandum dated December 19,2011,from Terry Maurer,Public Works Director. 2. Minnesota Department of Transportation- SAAS Status Report 3. Map of existing State Aid routes. EN HILLS MEMORANDUM DATE: December 19, 2011 TO: Honorable Mayor and City Councilmembers Patrick Klaers,City Administrator „, FROM: Terry Maurer, Public Works Director �,� SUBJECT: Municipal State Aid System Update Old Snelling Avenue Improvement Background At a recent discussion of transportation issues the Council asked for a list of projects for which Municipal State Aid (MSA) funds could be used as a funding source. Staff thought it may be worthwhile providing a brief explanation of the overall MSA system. So here are some general points on how the MSA system is set up and operates: 1. The MSA system was started in the 1950's and is used to distribute the Highway Users Tax Distribution Fund (basically gas tax and some other minor funding sources)to local governments. 2. The distribution is established constitutionally as 62% Mn/DOT; 29% counties and 9% cities. In 2011 the City's 9% amounted to $139,081,139. Any city with a population over 5,000 is eligible to participate. In 2011 there were 147 eligible cities, 83 in the metro area and 64 outstate. 3. The City's 9% is distributed in two ways. Half is distributed based on population of the 147 eligible cities (in 2011 each person was worth $18.80). The other half is distributed by what is known as "needs". Needs are roughly a calculation of how much it would cost to build out the entire system today. In 2011, total needs for the entire system were $5,239,406,230, Arden Hills' total needs in 2011 were $8,012,390. From a distribution standpoint each$1,000 of needs received $13.27 in 2011. Arden Hills' total apportionment in 2011 was $304,067. 4. Each city's annual apportionment is then divided into Maintenance and Construction Funds. From a maintenance standpoint each city must take a minimum of$1,500 per State Aid mile up to a maximum of 25% of the annual distribution (35% can be requested but requires documentation as to how the money was spent). Arden Hills takes 25% of the annual distribution for maintenance. The Maintenance Funds are sent directly to the city in three installments during the year. The remaining annual allotment goes into the Construction Fund which is held at the State until a State Aid approved plan is bid and the contract awarded. City Council Meeting P:\Admin\Council\Agendas&Packet Information\2011\12-19-11 Worksession\Packet Information\12-19-11MSAUpdate.doc Pagel of 3 5. Approximately 20% of each eligible city's total street mileage may be designated as State Aid routes. Every year every city submits a Certification of Mileage to Mn/DOT; as the city's total street mileage grows more State Aid routes may be designated. In 2011 Arden Hills had 7.53 miles designated as State Aid routes (see attached map). Throughout the State there was a total of 3,583.87 miles designated in 2011. 6. State Aid designated routes must begin and end on another State Aid route, a County State Aid Highway (CSAH) or a Trunk Highway. Routes must be approved by the Commissioner of Transportation prior to being added to the system. 7. The City's Construction Funds may be spent on their own State Aid routes, CSAH or Trunk Highways. Arden Hills Potential Proiects Potential projects in the City's CIP that could use some or all MSA Construction Funds would include the following: 1. Old Snelling Avenue reconstruction including the bridge replacement and a detached trail 2. City cost share for the US 10/Hwy 96 project(some minor costs may not be MSA eligible) 3. County Road E (B-2) streetscaping (sidewalks, landscaping, street lighting are eligible; decorative fencing, benches etc. may not be funded with MSA Construction Funds) 4. Detached trails/sidewalks along Old Highway 10 and/or County Road E/Lake Johanna Blvd 5. Mounds View High School detached trail from the bridge over I-35W to MVHS along Valentine Lake Road 6. Noise walls along trunk highways 7. Detached trails along Valentine Lake Road and Old Highway 10 associated with Valentine Park improvements 8. Any City cost share associated with the County Road E Bridge over TH 51 replacement 9. Any City cost share associated with the Ramsey County improvement on Lexington Avenue north of 1-694 Current Status of City's MSA Account Attached is an MSA status report as of December 6, 2011, for Arden Hills. As can be seen from the top line "90-MUNI CONST" the City started 2011 with $840,498.03. We received a 2011 allocation of $228,050 and used $119,547.45 for the CP Rail project giving us a year-end total in our Construction Fund of $949,000.58. In approximately February 2012 the City will receive the next allotment estimated at $216,000 for a total Construction Fund balance of$1,165,000. City Council Meeting C:\Users\sonj a.klingberg\Desktop\12-19-11 MSAUpdate.doc Page 2 of 3 Every year there is a minor negative adjustment to our allotment because we have a large balance relative to our annual allotment. The unencumbered balance in our account is subtracted from our needs total before our pro-rata needs amount is calculated. As stated above, each $1,000 of needs results in an annual allotment of $13.27 in 2011. So if $1,165,000 were deducted from our needs it would result in reduction of our annual allotment of$15,459.55 ($t,165,000/$1,000 X$13.27). Once a city reaches an unencumbered fund balance of three times their January construction allotment and $1,500,000, the negative adjustments become much more severe. Arden Hills is approaching this level but will not be hit by this negative adjustment in 2012. The MSA system also has positive incentives built in for cities that use their MSA funds. The negative needs adjustment described above is redistributed to cities with less than one times their January construction allotment. Also, the MSA system allows cities that have spent all their Construction Funds to ask for an interest free loan from the General Construction Fund pool. Cities can ask for five times their annual construction allotment or $4,000,000, whichever is less. This would allow Arden Hills to apply for approximately a $1,000,000 interest free loan should we have MSA eligible projects and not enough funds. These loans are paid back automatically from future year's allotments. Old Snelling Avenue Project The reclaiming of Old Snelling Avenue from County Road E to TH 51 is in the 2012 CIP. If the City Council wants this project undertaken in 2012 it is important that the Feasibility Study/Public Hearing process be started now. Since we have all the preliminary topography and geotechnical information from the December 2010 Scoping Document the preparation of plans can wait. The other option would be to wait until 2014 (after the grade separation project at US 10/Hwy 96) and do the road and bridge at the same time. Council Action Requested Staff is looking for direction on the Old Snelling Avenue project. Staff is also available to answer any questions regarding the MSA system. City Council Meeting C:\Users\sonj a.klingberg\Desktop\12-19-11 MSAUpdate.doc Page 3 of 3 CD - CD u u O u u O O Q o > 0 >o c C0 oo a P. Y � O d � O C M O N_ C♦+ O C ++ O O n O rq F^ O ;0 e O N O >> d d C Cd � IV L i+ y a+ 6J fd O O O O Q a O O Q O O O O O 00 O O �y ON ON ON T ON > to Fi/ Fi1 O O a_ a_ >i a.. cn ci Cl Cl o ux E. W O W O o U L' �W QOI CD 00 t a o as r� = V1 N d Cl d O o I 7 i O e c a F�IU d oc H � O '^ a V 1 'n emu, ` m Cl > o lul 75 a � rn w � I UI A d C o o CHI � � � <i z W4 / O Y O O F. o 0 o U A c A c o U �I m en U al 0 0 o O o F. 00 F" � v >� a H 00 H � � AW^ o CD �_ U CDn 00 O r o �Iz o dl ? oo = c 00 OO 00 1 N U Qom' O � >a > 00 CL ti W A O O •.V. O a 0'p L 00 L O .p 00 '7'' O 7 O G CD 21 N .� 0 O Q! H ToDR(pd.te) y COUNTY ROAD 96 W COUNTY OUNTYROAD 88 W KARTHLAKEDR Dr - � LEASANT NURSERYHSALN p ARDEN VIEW OR PLEASANT DR L p NURSERY NILL CT ARDEN S 4 ROYAL S F ♦♦ AMBLE RD P .. MCCLUNO SEN 'St CT G WEDGEWOOD BR RKNOLL CIR r�LEENAVE COLLEEN AVE N QqY&� 10 4y INDIAN OAKS CTA UMMINGS PARK DR '�, W ST NE i V Q'aYW o INDIAN OAKS TRL -VWN = OAKS CIR t m CIRW CIRE _ PARKSHORE DR EIDE Cl i ti ♦ FLORAL DR W tZ ZS V T Cr yyi V NE t RD CREST R 1 AVE COUNTY ROAD F W t CRYSTAL AVE p GRAMME RD O GLEN ♦♦ A VENUS A O COUNTY ROAD E2 W ` RED FOX RD D ESW - X COUNTY RDA P �0 �G GREYFOXRD ♦ cY HATMAM AVE � r� u C 4 ARDEN OAKS THOM D CT 2 t•. °♦ OAKS CT OAKAVE C Y.4� L7: V= Y x COUNTY ROAD E W CVO OUNTYROAD NNP� r. ¢ tot O C P NUDSON RD rR ♦ C °�PNHA BLVD 3OQ m SS t� COUNTY ROAD - At erg HARRIETAV GRANT RD IL �P Q NOBLE RD O LAKE LN Z Pe AVE 0pp 3 LA TILLER LN R r. KATA:LN (E CALN RLTON OR T - 4 BUSSARD CT 3 m : C JERROLDAVE It�r E EW RAVE rM EDGEWATER AVE DGEWATERAVE "W : R GLEN PAUJ AVE o� t ~ 6l'ENNB'L RD U COUNTY ROAD D W �' ENH State Aid Routes State Aid Routes: ^"Existing State Aid Route v -A EN HILLS 0 250 500 750 1000 Feet Saurnseny Caeecls ' : Ramsey Co Wy GIS Base Mep(11p2I2010) osweex 'CMydRouNbEnpMirg OeP+nmei •^e..renens»y�e�.w•e..rn.eewni.naeioauw»m m.m•e•.wroiweaewa. Prepared b: For further idormelbn repsrdW the conbMa dNb map carbct 0°if°s"^"'»ww..a trour mi r..nam�a �`..e M»�am u•Wne�suem. P Y va »a.we.Nn»•enw.wu mnina tle Pmei6• ew meptloc'.ArdmMMsStereAldtpulas.med Cb of Roseville EngineeringDe MIeM °�'a RosaWlb,enyn..r:p oepanmem, » »w ••. sae.. =awn. .�..�,,,,epw ei,Ce ,,,, ..,.r Y � wn•.peenr swjswm.ean»zi�zaaol, maP'ArbM1111e5bKAWRouba.Pd ZSW Chic Cents IXM,Rosevia AfJ e»a•q�•sww W n.rwe.weepzs..n�w..aw.wr...se.tia waw..» February 5,2010