Loading...
HomeMy WebLinkAbout5C, Resolution 2012-004 – Awarding Contract for Lift Station #13� .�..- �` �EN HILLS Request for Council Action Prepared By: Terry Maurer, Public Works Director Council Meeting Date: January 30, 2012 Adopt Resolution 2012-004 Awarding the Reconstruction of Lift Station #13 to Minger Construction in the Amount of $194,250 Budgeted Amount: Actual Amount: Funding Source: $385,000 $194,250 - Construction Sanitary Sewer Utility Fund $28,100 - En ineerin Recommendation: Staff recommends that Council adopt Resolution 2012-004 Awarding the Reconstruction of Lift Station #13 to Minger Construction of Chanhassen, Minnesota, in the amount of $194,250. ..................................... . . . ..................._...............................:......._............................................................._.............:.............................................:.......:......._............:...............................................................................................................:.............. Supportin� Documents: L Memorandum dated January 30, 2012, from Terry Maurer, Public Works Director. 2. Page 62 of the Capital Improvement Plan (CIP). 3. Bid evaluation from Bolton and Menk. 4. Bid tabulations taken on December 6, 2011. 5. Resolution 2012-004. � EN HILLS MEMORANDUM DATE: January 30, 2012 TO: Honorable Mayor and City Councilmembers Patrick HIaers, City Administrator FROM: Ter Maurer, Public Works Director � rY SUBJECT: Lift Station #13 Reconstruction Bids Background The 2011 Capital Improvement Plan (CIP) included a sanitary sewer item to rebuild lift stations 11 and 13. Lift Station #11 is located at 1861 Highway 96 which is the main entrance to the manufactured home park. That lift station was dropped from the project because of the US 10/Hwy 96 Grade Separation Project planned for 2013 which may affect the existing lift station. Lift Station #13 is located at the intersection of Karth Lake Drive and Pleasant Drive. The CIP item, a copy of which is attached, prograinmed $385,000 for the reconstruction of both lift stations. . Seth Peterson of Bolton and Menk was hired to provide engineering services for the reconstruction. The project was bid on Tuesday, December 6, 2011. The bid also included four alternate items for various upgrades at lift stations 2, 5, 7 and 8. After the bid opening the alternative bid items were evaluated and it was decided that they were too costly and there was a more cost-effective method of getting this work done so only the base bids are being considered for award. There were a total of eight bids received. The following table contains the bidder and their base bid for the reconstruction of lift station # 13. City Council Meeting P:�Admin\Council�Agendas & Packet Information�2012\01-30-12 Reg Mtg�Packet Information\1-30-12LiftStationl3Bids.doc Page 1 of 2 The lowest responsive/responsible bidder is Minger Construction from Chanhassen in the amount of $194,250. Attached is a memo from Project Engineer Seth Peterson recommending award to Minger Construction. I have also worked with Pat Minger at another City and always found his work to be excellent. Council Action Requested It is recommended that the City Council adopt attached Resolution 2012-004 Awarding the Reconstruction of Lift Station #13 to Minger Construction of Chanhassen, Minnesota, in the amount of $194,250. City Council Meeting P:�Admin\Council�Agendas & Packet Information�2012\01-30-12 Reg Mtg�Packet Information\1-30-12LiftStationl3Bids.doc Page 2 of 2 ����nprovement Plan .�ty of Ar�� �s� M��esota roject # t0-Sew-4�3 •roject Name Reconstruct Lift Stations 11 and 13 Department Sanitazy Se�ver D��aM�ent Coataci Public Works Duec�or Priority n�a -ry� Itnprovement UseCu1 Life Categan U�tt��' �P�O��ements 2011 thru ZQ15 Z'otai Project Cost: $385,OOU �gCf��i1�II ?roject to replace lift staEions �� f �g ut be nstaf ed} The�ne � pumpi s and p�eDrwould be compatible w"►it► th other�l4 lift stations focateda� v��, Pumps and electricai panels o .hroughout the City. EngineeringlDesign alreaciy eompleted, ho�vever, a review should be completed to ensure no design modifications are needed. - 201i - L�ft Station # t 1 mav be impacted bv �.h�- HiQhwav i0/County Rd 96 scheduled for JUSiil�c�uavu The lift stations are over 40 years otd and in need of rep[acement_ 2012 2013 2Q14 2015 �o�d' Expenditures 2011 yp,ppp Planning/Design 10.000 375,000 Cons4ruction/Maintenance 375,OOd 385,000 Total 385=000 2012 2013 2014 2015 Total Funding Sources 20t 1 38�,ppp Sanitary Sewer Utifity Fund 385,000 3�,000 Total 385,000 Budget Impact/Other j - Pump xepair costs should decrease as a result of this pro�ect. Wednesday. November F0, 2010 Produced Using ihe Plan-It Cap�tal Plamm�$ Solh�'a�e ( 2 o��N � ��z m � � `t: � I n��C'!] ��'C 1��C �� BO L�TON 8�. M� N K, I N C� Consuiting Engineers & Surveyors 12224 Nicollet Avenue • Burnsville, MN 55337 Phone (952) 890-0509 • Fax (952) 890-8065 www.bolton-menk.com BID EVALUATION FOR LIFT STATION IMPROVEMENTS CITY OF ARDEN HILLS, MINNESOTA Eight (8) bids were received for the construction of the Lift Station Improvements project. The base bid for this project is for removal and replacement of lift station 13. There were four (4) add alternate items for pump and electrical work at lift stations 2, 5, 7 and 8. The base bid numbers for lift station 13 ranged from $194,250 to $366,500 as shown in the attached Bid Tabulation. The Engineer's estimate for the project was $270,000. The apparent low, responsive and responsible bidder was Minger Construction, Inc. of Chanhassen, Minnesota. Five of the eight bidders were below the engineer's estimate and three were above the estimate. The low bidder is approJcimately 28 percent below the engineer's estimate. There were 4 add alternate items and each bidder provided a cost for each add item. Award of the project is based on the base bid price for lift station 13 and any or all add items could be accepted or rejected from the low base bidder. Since Minger Construction is the low base bidder, their add alternate items can be evaluated. Based on the costs of the add alternate items it is our recommendation that the City reject all of the add alternate items and reconsider these at a some future time. Based on the base bid numbers the bid documents did not contain any wording or ambiguities so as to force the Contractors to build in additional contingencies. Based on the relative tight bidding and very competitive bids we feel the speciiications were not restrictive to force a non-competitive bid situation. Therefore, we feel that the bids received were competitive and responsive and re-bidding of the project would not provide any cost savings. Minger Construction, Inc., out of Chanhassen, Minnesota, is a reputable contractor that has previous experience with projects similar in scope and size. Bolton & Menk, Inc. has worked with Minger Construction, Inc. on multiple projects in the past with good success. Based on their experience and qualifications, along with their acceptable bid price, we recommend that the City of Arden Hills consider awarding the Lift Station Improvements base bid with no add alternates to Minger Construction, Inc. in the amount of $194,250. Respectfully submitted, BOLTON & MENK, INC. �c.'������ Seth A. Peterson, P.E. Project Manager \�netrosouthl\G�ARDH�M21103347\I_Correspondence�Bid Eval.doc DESIGNING FOR A BEITER TOMORROW Bolton & Menk is an equal opportunity employer BID TABULATION Lift Station Improvements City of Arden Hills, MN BMI Project No. M21.103347 Bids Taken: Tuesday, December 6, 2011 Time: 10:00 a.m. Addendum(s): #1-11/30/2011 BIDDERS TOTAL PROJECT BID PRICE ADD ITEMS BID BOND ADD. A = $ 73,955 1. Minger Construction, Inc. B=$ 88,900 2471 Galpin Court Ste 110 $194,250 Y Y Chanhassen, MN 55317 C=$ 17,925 D = $113,320 A = $ 87,360 2. Penn Contracting, Inc. B—$100,800 13025 Central Avenue NE $223,360 Y Y Ste 200 C = $ 17,250 Blaine, MN 55434 D = $157,200 A=$71,300 3. Magney Construction B=$ 83,500 1401 Park Road $225,800 Y Y Chanhassen, MN 55317 C=$ 19,100 D = $103,200 A = $100,000 4. CC5 Contracting, Inc. B=$105,000 2090 Pike Lake Drive #2 $250,000 Y Y New Brighton, MN 55112 C=$ 20,000 D = $146,000 A = $ 76,000 ? 5. C. W. Houle, Inc. B=$ 88,000 1300 West County Road 1 $251,000 Y Y Shoreview, MN 55126 C=$ 26,000 D = $123,000 A = $135,000 6. Lametti & Sons, Inc. B=$155,000 16028 Forest Blvd. North $293,700 Y Y Hugo, MN 55038 C=$ 32,700 D = $243,700 A = $ 85,000 7. PCiRoads, LLC B=$ 87,000 14123 — 42"d Street NE $339,000 Y Y St. Michael, MN 55376 C=$ 19,000 D = $109,000 A = $ 76,000 8. Geislinger and Sons B=$ 80,000 511 Central Avenue South $366,500 Y Y Watkins, MN 55389 C=$ 18,000 D = $120,000 Solton & Menk, Inc. CONSULTING ENGINEERS & SURVEYORS Mankato - Fairmont - Sleepy Eye - Burnsville - Willmar - Chaska — Ramsey — Maplewood - Brainerd, MN Ames, IA � �,R .�EN�HII,LS CITY OF ARDEN HILLS COUNTY OF RAMSEY STATE OF MINNESOTA RESOLUTION NO. 2012-004 A RESOLUTION AWARDING THE LIFT STATION #13 RECONSTRUCTION PROJECT WHEREAS, pursuant to advertisement for bids for the improvement of the Lift Station #13 Reconstruction Project, bids were received on Tuesday, December 6, 2011, at 10:00 a.m., opened, and tabulated according to the law, and the following bids were received complying with the advertisement: AND WHEREAS, it appears that Minger Construction, Inc., of Chanhassen, Minnesota, is the lowest responsible bidder at the tabulated price of $194,250.00; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF ARDEN HILLS, MINNESOTA: 1. The Mayor and City Administrator are hereby authorized and directed to enter into a contract with Minger Construction, Inc., of Chanhassen, Minnesota, for $194,250.00 in the name of the City of Arden Hills for the above improvements according to the plans and specifications thereof heretofore approved by the City Council and on file in the office of the City Administrator. 2. The City Administrator is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposits of the successful bidder and the next lowest bidder shall be retained until contracts have been signed. ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS THIS 30tn DAY OF JANUARY, 2012. David Grant, Mayor ATTEST: Patrick Klaers, City Administrator