Loading...
HomeMy WebLinkAbout03-07-12-PC Chair Clayton Larsonit 1245 W. Highway 96 Commissioners EN HILLS Arden Hills, MN 55112 Angela Harries � 651.792.7800 Andrew Holewa 1� www.ci.arden-hills.mmus Samuel Scott Arden Hills Roberta Thompson Clayton Zimmerman Planning Commission Janet Stodola (Alternate) Work Session March 7, 2012 City Vision A strong community that values our unique environment, our fiscal soundness, and our tradition as a desirable city in which to live, work, and play. Agenda Regular Planning Commission Convenes 6:30 PM Call to Order—Role Call 1. APPROVAL OF THE AGENDA 2. MINUTES A. February 8, 2012 3. PLANNING CASES A. Planning Case 12-002—Zoning Code Amendment, Preliminary and Final Plat, and Master and Final PUD; TAT Properties; 1201 County Road E—Public Hearing B. Planning Case 12-005— Home Occupation Conditional Use Permit; Christine Osgood; 1268 Amble Road— Public Hearing 4. UNFINISHED AND NEW BUSINESS A. 2012 Work Plan Discussion 5. COMMENTS AND REPORTS A. Report from the City Council B. Planning Commission Comments C. Staff Comments 6. ADJOURNMENT A quorum of the City Council may be present at this meeting. Planning Cases are available online at: http://www.ci.arden-hills.mn.us/planningcases ■ [ IN ■ M 1 ■ ■■ ■ ■ mm ■■ ■ ' ■ ■ ■ ■ ■ ■ ;■ ■ _ ON ■ _ mi OLE r Omni 0 ME 4,1 4-4m W. . 0 f r ti ■ ■ ■ ■ ll I I No� 1 1I I i r■ ME %: + .. .. ■% one - i ZEN�HILLS MEMORANDUM DATE: March 7, 2012 PC Agenda Item 3.A TO: Planning Commission FROM: Meagan Beekman, City Planner SUBJECT: Planning Case#12-002 -This application requires a PUBLIC HEARING Applicant: 1201 County Road E LLC (TAT Properties LLC) Property Location: 1201 West County Road E Request: Zoning Code Amendment, Preliminary and Final Plat, Master and Final Planned Unit Development Requested Action The applicant has requested a Zoning Code Amendment, Preliminary and Final Plat, and Master and Final Planned Unit Development (PUD) to subdivide the property at 1201 County Road E into two parcels and reuse the existing building as a 153-unit single room occupancy (SRO) building. Background The property at 1201 County Road E is owned by TAT Properties, represented by Rob Davidson. In March 2008, the City approved a request from TAT Properties and Northwestern College granting an Interim Use Permit (IUP) at the former Holiday Inn property that would allow the College to operate a student housing facility in the B-2 District. TAT Properties had purchased the building and intended to lease it, in its entirety, to Northwestern College. The IUP expired on May 30, 2011. Prior to the expiration of the IUP, the City approved a request by TAT Properties to allow the student housing on a permanent basis provided that Northwestern College remained the sole tenant of the building. Citing a drop in expected attendance and financing, City of Arden Hills Planning Commission Meeting for March 7, 2012 P:IPlanningWlanning Cases12012112-002-Holiday Inn Plat and PUD(Pending)103-07-12-PC Report-1201 County Road E PUD.docx Page 1 of 13 Northwestern College withdrew their interest in the property shortly after that approval. Northwestern College has since vacated the building. At the time of the IUP approval, the City was just beginning the process of developing the Guiding Plan for the B-2 District, which was ultimately adopted in October 2008. The City's zoning regulations were consequently amended to incorporate the goals of the Guiding Plan for the B-2 District shortly after it was adopted, including design standards for new construction. The City reviewed and approved a subsequent proposal from Select Senior Living to convert the building into assisted senior housing. Select Senior Living has since ended their negotiations with the property owner to purchase the property for this use. 1. Overview of Request TAT Properties is now requesting a Zoning Code Amendment and Master and Final PUD to allow the reuse of the existing building at 1201 County Road E as 153 single room occupancy (SRO) rental units. The applicant would install a counter top, under cabinet drawers, and under counter refrigerator, and necessary electrical for a microwave, to be supplied by the tenant. The units would have no kitchen facilities. A communal kitchen exists on each floor, which could be shared by the tenants. The applicant would bring the property up to building code requirements, and is proposing improvements to the main floor in terms of tenant amenities (Attachment A). The applicant is requesting a phasing plan for the building that would allow them to complete improvements on only 70 units. The remainder of the units, located on the third and fourth floors, would be converted over.time, as the market dictates. The third and fourth floors would remain vacant in the interim. In addition to the request for the Zoning Code Amendment and the Master and Final PUD, TAT Properties is proposing to subdivide the property into two parcels, reserving the eastern two acres of the site for a future development option that has yet to be determined. The submitted plans include a conceptual drawing of two buildings that might be possible on Lot 2, but the applicants are not seeking approval for development on Lot 2 at this time. In order to accommodate the request for the subdivision, and bring the property into compliance with the City's zoning regulations, the storm water ponding and landscaped area would be shared by the two parcels. Presently, the Zoning Code does not identify SRO's as a permitted or conditional use within the B-2 District. Land uses that are not specifically identified in a city's zoning code as permitted or conditional uses are considered prohibited. SRO's are distinct from more common types of multi-family dwelling units. The Building Code defines a dwelling unit as City of Arden Hills Planning Commission Meeting for March 7, 2012 P:IPlanning0anning Cases12012112-002-Holiday Inn Plat and PUD(Pending)M-07-12-PC Report-1201 County Road E PUD.docx Page 2 of 13 having, among other things, a functional kitchen. SRO's, on the other hand, are single rooms which do not necessarily have a kitchen as it is defined by the Building Code. The City's Zoning Code allows multi-family dwelling units within the B-2 District, but not SRO's. This proposed use is also distinct from the previous use of the building as student housing. As a net lessee of the building, Northwestern College was able to exercise a great deal of control over the students that lived in the building, and could guarantee that only students would be allowed to live in it. This would not be the case with a privately owned landlord/tenant situation, as is proposed here. In order to accommodate the applicant's request to allow an SRO building at the proposed site, the request includes a proposal to amend the definition of Boarding House in the City's Zoning Code, to allow up to 153 persons, and add boarding houses as a permitted use through a PUD process in the B-2 District. This means that the use would be considered permitted, but would be required to get an approved Master and Final PUD in order to operate in the B-2 District. The applicant is not proposing any alterations or use of the former restaurant facility. The applicant has submitted a letter outlining the reasons for the request (Attachment A); a traffic analysis (Attachment B); and a Preliminary Plat plan set(Attachment D). 3. Surrounding Area: AN u►g xistia d North Industrial B-3 Service Business Industrial and Community Commercial Community Commercial, South Commercial B-2 General Business Neighborhood Commercial, and Office East Commercial C-1 Retail Service Neighborhood Commercial (City of Shoreview) West Commercial B-2 General Business Regional Commercial City of Arden Hills Planning Commission Meeting for March 7, 2012 P:WlanninglPlanning Cases12012112-002-Holiday Inn Plat and PUD(Pending)W-07-12-PC Report-1201 County Road E PUD.docx Page 3 of 13 4. Site Data: Ian Commercial rind, y - Regional Commercial ZonS , B-2 General Business District 8.21 Acres(357,694 s fl o The parcel is generally flat Plan Evaluation 1. Proposed Zoning Code Amendment The applicant is requesting that boarding houses be added as a permitted use, if approved through the PUD process, in the B-2: General Business District Zone, and that the definition of Boarding House be amended to allow up to 153 persons to occupy the boarding house. If approved, Section 1320.85 Subd. 5 could be amended to specify additional PUD criteria for the allowance of boarding house uses in the B-2 District, while existing language pertaining to nursing home and assisted living could be removed. The amendments could limit boarding house uses to existing hotels in the district and set up additional review criteria. The B-2 District generally encompasses those properties along County Road E between Lexington Avenue and Highway 51/Snelling Avenue. Boarding House is defined in Section 1305.04 Subd. 19 of the Zoning Code as: Boarding house. A structure where sleeping rooms are provided, with a common entrance, internal access to all rooms, one (1) or more bathrooms, and one (1) or more kitchens to provide lodging for at least three (3) but not exceeding five (S) persons. A boarding house is distinct from a transient accommodation such as a hotel or motel as defined in this chapter. The City does not have a specific set of review criteria for evaluating a Zoning Code amendment; however, the primary issues to consider include (but are not limited to): 1. Is the proposed use compatible with the other uses in the B-2 Zone? 2. How will the proposed use affect the B-2 Zone? 3. Will the proposed use provide a benefit to the community? When reviewing a Zoning Code amendment or addition, cities have a great deal of discretion, because adopting and amending ordinances is a legislative action on the part of the City. It is City of Arden Hills Planning Commission Meeting for March 7, 2012 P:IPlanninglPlanning Cases12012112-002-Holiday Inn Plat and PUD(Pending)W-07-12-PC Report-1201 County Road E PUD.doex Page 4 of 13 important to consider how the change would affect the entire zone instead of one specific property. If approved as proposed, boarding houses could, in theory, be a permitted use through a PUD process on any property in the B-2 Zone. However, the ordinance amendment could require that in order for a boarding house use to be approved, it would have to be located in an existing hotel/motel use within the district. This regulation could effectively limit this type of use to the proposed property. 2. Zoning Regulations This application is unique because the request is regarding the use of a building and site that are already developed. The typical evaluation as to whether or not the proposed plan meets the minimum requirements of the Zoning Code is more difficult given that there are certain aspects of the site that cannot reasonably be altered, such as the setbacks of the building. That being said there are certain reasonable improvements that can be required for the property given the nature of the PUD process and the City's broad discretion when reviewing requests for amendments to the Zoning Code. Lot 2 has been presented as a conceptual site plan. The conceptual site plan shown does not meet the minimum requirements of the B-2 District in terms of site design; however, at the time Lot 2 is actually developed, an approved Master and Final PUD will be necessary to evaluate the details of the development plan. Section 1320.06—District Requirements Chart A. Lot Size, Building Coverage, and Landscaping -Exceeds requirements: Building o Building Landscaping o Lot Size Coverage(st Coverage Coverage(sfl Landscaping Lot 1 -Holiday Inn Site 260,716 56,369 21.62% 78,596 30.15% Lot 2-Conceptual 82,827 9,500 11.47% 24,955 30.13% Total 343,543 65,869 19.17% 112,558 32.76% B. Setbacks -Meets requirements: The minimum setbacks in the B2 District are 20 feet in the front and rear and 10 feet in the side yards. The existing building exceeds the minimum setbacks for this District. The conceptual building shown on Lot 2 meets the minimum setbacks. This indicates that it is possible for the property to comply with setbacks when it is ultimately developed; however,the exact placement of the building on Lot 2 will be determined by a City of Arden Hills Planning Commission Meeting for March 7, 2012 P:I Planning)Planning CasesU012112-002-Holiday Inn Plat and PUD(Pending)103-07-12-PC Report-1201 County Road E PUD.docx Page 5 of 13 future Master PUD review. C. Density -Flexibility requested: The maximum density for housing in the B-2 District is 20 units per acre. With the proposed subdivision, Lot 1 would be 5.985 acres in size. 153 units on that parcel would create a density of 25.6 units per acre. If a portion of units in the building were converted to one or two bedroom units this would reduce the project density. Section 1325— General Regulations A. Landscaping and Tree Preservation Section 1325.05 Subd. 1 and 1325.055 Caliper Inches Required-Exceeds requirements A Landscaping Plan submitted by the applicant is included in Attachment C. Based on the square footage of the proposed buildings the City Code requires 325 caliper inches of trees to be located on site;however, existing and preserved trees on the site are permitted to count towards this requirement. There are currently 490 caliper inches of trees on site. In addition,the applicants are proposing to plant an additional 47 caliper inches of trees on site. No trees are proposed to be removed at this time; however, it is likely that trees will need to be removed with the development of Lot 2. The specific tree replacement requirements will be calculated with the application for the development of Lot 2. Trees along Street Frontage—Exceeds requirements City Code requires that a minimum of one tree be planted along the right of way for every 40 feet of street frontage. Lot 1 has 580 feet of frontage, which would require 14 trees to be planted. Their plan proposes 14 street trees with an additional 13 to be planted elsewhere on site. Additional street trees will be required with the development of Lot 2. Perennials and Shrubberies—Exceeds requirements City Code requires that at least ten percent of the total landscaped area shall be covered with perennials and/or shrubbery. Code requires 7,860 square feet of perennials and shrubbery. The applicant is proposing 8,571 square feet. Planting Islands—Exceeds requirements City Code requires that at least ten percent of the parking area be occupied by planting islands that are at least 150 square feet in size, edged in concrete curb, and have at least one tree. Based on the proposed parking lot size, City Code would require 5,357 square feet of parking lot islands. The applicant is proposing 5,905 square feet. All of the City of Arden Hills Planning Commission Meeting for March 7, 2012 P:I lanningW Tanning Cases12012112-002-Holiday Inn Plat and PUD(Pending)103-07-12-PC Report-1201 County Road E PUD.doex Page 6 of 13 proposed islands would meet the size and tree specifications of the Code. Tree Selection—Meets requirements The selection and size of trees that will be provided on site meet the requirements of the Code. B. Design Standards— Section 1325.05 Subd. 8 Because Lot 1 has already been developed,the majority of the design standards that pertain to the B-2 District are not applicable to this proposal. That being said,there are certain aspects of the design standards that do apply to this particular application in regards to Lot 1. Lot 2 will be evaluated at the time that a proposal for development is submitted. Site Furnishings and Seating Areas—Flexibility requested It does not appear from the plans that site furnishings or an outdoor gathering space of any kind is being provided. Parking—Meets requirements Parking is currently located to the rear of the building, which complies with the design standards for the B-2 District. The Code also requires concrete curb and gutter around the periphery of all parking lots, access roads, and parking lot islands. This requirement is met by the proposed plans. Lighting—Cannot be determined by submitted plans No lighting plan was submitted with the proposed plans. The Ramsey County Sheriff has recommended that three foot candles of illumination be provided across the entire : parking lot surface. Pedestrian and Bicycle Circulation—Meets requirements The applicant is proposing six-foot concrete sidewalks with a six-foot boulevard adjacent to County Road E and Lexington Avenue the length of both Lots 1 and 2, as is required by Code. Bike racks would be located on the interior of the building. C. Parking— Section 1325.06—Exceeds requirements The applicant is proposing 262 parking stalls on Lot 1. The Zoning Code requires two City of Arden Hills Planning Commission Meeting for March 7, 2012 P:IPlanning0anning Cases12012112-002-Holiday Inn Plat and PUD(Pending)103-07-12-PC Report-1201 County Road E PUD.doex Page 7 of 13 stalls for every dwelling unit on site; however, since the rooms are not dwelling units,but rather, single occupancy units, it is realistic to assume that parking demand would be less. At this time the restaurant facility is not contemplated; however, when it is redeveloped the existing parking will need to accommodate that use as well. Without a proposal for the development of the restaurant facility, it is very difficult to determine what the total parking demand for Lot 1 will be. Parking will need to be evaluated at the time the restaurant facility is developed, and the entire site will need to offer adequate parking. Lot 2 will be evaluated at the time of the development proposal based on that specific use. 3. Signage The applicant has not submitted a signage plan for the property. 4. Park Dedication Park use dedications for recreation or conservation purposes would be required as part of an approval of this application, and would be determined by the City Council. According to the City's subdivision ordinance the property is subject to a park dedication requirement because of the platting of the parcel. Based on the Code, park dedication can be in the form of a percentage of land dedicated to the City, or as cash in lieu of a dedication. In the event of a cash dedication, the amount could be up to ten percent of the fair market value of the property. According to the Ramsey County Assessor, the property has an assessed value of $2.67 million. Based on the current assessed value of the property the park dedication could be up to $267,000. The final park dedication requirements will be determined by the City Council. According to State Statute, cash payments made to cities in lieu of park dedication can only be used towards the construction of new recreation facilities and cannot be used to maintain existing facilities. 4. Guiding Plan for the B-2 District The existing building on Lot 1 is presently situated in a way that conforms to many of the principles in the Guiding Plan for the B-2 District. The building is situated close to the street with nearly all of the parking located to the back of the building. The subdivision of the lot into two offers an opportunity to increase the intensity and mixture of uses on the site, which is a stated goal of the Guiding Plan, and decrease excess parking. The future development of City of Arden Hills Planning Commission Meeting for March 7, 2012 P:IPlanningWIanning Casesl2012ll2-002-Holiday Inn Plat and PUD(Pending)W-07-12-PC Report-1201 County Road E PUD.doex Page 8 of 13 Lot 2 maintains the opportunity for a gateway entry feature, additional outdoor seating, or gathering space, and an overall site plan that meets the requirements of the Zoning Code and forwards the vision of the Guiding Plan for the B-2 District. Because the site is not being fully redeveloped, but rather re-used, other principles of the Guiding Plan that relate to this site are not as clearly addressed. For example, it is not possible to realign the access drives towards a new intersection to accommodate a traffic light, because of the placement of the existing building. While multiple-family housing has been identified as an appropriate use in the B-2 District, boarding houses have not been contemplated. Physically the two uses have much in common, and both offer specific impacts on traffic patterns and parking. The impacts are magnified when compared with the previous student housing use. When Arden Hall was operational, Northwestern College provided shuttle trips several times a day to and from campus reducing trip generation, parking permits limiting parking demand, on-campus meal plans were provided, as was on-site food service, none of which is the case with the current proposal. Traffic generated from this site will certainly be greater as a 153-unit single room occupancy building than that of assisted senior housing or as student housing. 5. Traffic According to the traffic report submitted by the applicant, the proposed use would generate approximately 75 percent of the trip generation as the former Holiday Inn when it was fully functional. While not contemplated by the traffic report, it is anticipated that the trip generation would be greater than when the site operated as student housing, because NWC limited trips to the site by provided a shuttle service several times a day and limited the number of parking permits that were given out to students who lived at the facility. Furthermore, the traffic report does not contemplate the reuse of the existing restaurant facility, which could have a major impact on traffic to and from the site. The impact of Lot 1 alone is not the only variable to be considered. With the potential development of Lot 2, the City must consider the overall traffic impacts of the site as a whole. The report indicates that the Holiday Inn generated approximately 1,338 trips per day when it was fully operational. The traffic report contemplates five different possible land uses for Lot 2. The total trip generation on both parcels ranges widely from 1,360 trips per day with Lot 2 being utilized as a bank, up to 2,486 trips per day with Lot 2 being used as a fast food restaurant with drive-thru. This range is worrisome in that the City does not currently have a mechanism in place to control the number of trips once Lot 1 is developed. City of Arden Hills Planning Commission Meeting for.March 7, 2012 P:IPlanningIPlanning Cases12012112-002-Holiday Inn Plat and PUD(Pending)103-07-12-PC Report-1201 County Road E PUD.docx Page 9 of 13 The applicant has indicated that they will be marketing these units to college students who attend Bethel and Northwestern College, Staff would recommend that agreements be made with both institutions to provide transportation to and from the campuses from this site to reduce vehicle trips. Staff is also working on an analysis to determine the maximum number of trips that the ingress and egress from the whole site can accommodate. This will help with the review of future uses for Lot 2. 6. Additional Review The Ramsey County Sheriff reviewed this application and has submitted a letter addressing their strongest concerns (Attachment Q. The Sheriff indicated that the phasing plan is very troublesome, as is it nearly impossible to effectively close off the third and fourth floor of the building, which then can become areas for criminal activity. The Sheriff also indicated concerns over the lack of a lighting plan, and the fact that the building would not have a secured entrance on the north side. In general, the Ramsey County Sheriff did not speak in favor of this application; however, asked that if the City chooses to approve it, that the applicant be required to participate in the Crime free Multi-family Housing Program. The applicant has indicated that he is willing to do this. The Building Official and Fire Marshall reviewed the plan and have submitted their comments (Attachment Q. Both share the Sheriff's concerns regarding the phasing of the building. Discussion Staff has spent a considerable amount of time evaluating this proposal, and continues to have concerns regarding the proposed use of the site. The distinction between dwelling units and SRO's, or even this proposed use and the previously approved student housing use, may appear slight; however, below the surface significant differences become clear. While the applicant intends to market this building to students of Bethel University and Northwestern College, the applicant cannot limit residents to only this demographic, as was possible with the student housing facility. The lack of kitchen facilities, which distinguishes this use from multiple dwelling units, is significant when taking into account the rents these units will generate, and the limited food service available on site. Staff was not able to identify any other cities in Minnesota that allow SRO's, boarding houses of this size, or rooming houses. Minneapolis once allowed rooming houses, but has disallowed them due to persistent issues. Even near the University of Minnesota, City of Arden Hills Planning Commission Meeting for March 7, 2012 P:W lanningWlanning Cases12012112-002-Holiday Inn Plat and PUD(Pending)103-07-12-PC Report-1201 County Road E PUD.docx Page 10 of 13 privately owned apartments that are predominantly used by students must provide individual kitchens to their tenants. In addition to concerns related to the Zoning Code Amendment to allow SRO's, Staff has concerns over the phasing plan which would keep two floors vacant for a period of time and the traffic generation and parking availability associated with this application, since the restaurant facility is not part of the redevelopment proposal, but would occur at a later date. Staff continues to believe that this property is an appropriate location for high density housing; however, Staff feels strongly that multi-family dwelling units would be a more appropriate use here, and that a diversity of studio, one, two, and three-bedroom units would function the best, both in terms of satisfying market demands, but offering a variety of options for potential tenants. An ideal scenario would be to plan for the redevelop the site as a whole, rather than the City reviewing it in segments over time. Findings of Fact The Planning Commission must make a finding as to whether or not the proposed application meets the requirements of the Zoning Code, advances the goals, and principles within the Guiding Plan for the B-2 District, and would adversely affect the surrounding neighborhood or the community as a whole. Staff offers the following findings for consideration: General Findings: 1. The applicant is proposing to amend the Zoning Code to increase the number of allowed persons in a boarding house, and make boarding houses a permitted use in the B-2 District. 2. Boarding houses are not currently a permitted use in the B-2 District 3. The City's definition for boarding houses allows lodging for no more than five persons. The proposed use would have 153 persons. 4. The proposal would increase vehicle trips on the site compared to existing and past conditions. The amount of increase cannot be quantified based on the plans submitted. 5. Required parking demand cannot be determined based on the plans submitted. 6. The proposal is in compliance with the City's setback, lot size, and lot coverage requirements. 7. The proposal exceeds the City's maximum density requirements in the B-2 District. 8. The proposal meets or exceeds the City's general regulation requirements, with the exception of outdoor seating or amenities, which are not provided for, but are required by the design standards for the B-2 District. City of Arden Hills Planning Commission Meeting for March 7, 2012 P:tPlanningWlanning Casesl2012112-002-Holiday Inn Plat and PUD(Pending)W-07-12-PC Report-1201 County Road E PUD.docx Page 11 of 13 9. The proposal, if approved, would generate up to $267,000 in park dedication. Staff Recommendation Based on the findings of fact and a review of the application materials, Staff recommends denial of Planning Case 12-002, as presented in the March 7, 2012, report to the Planning Commission. While Staff is recommending denial of this application, Staff also acknowledges that this site is an important gateway to the B-2 District, and yet remains vacant. Two other development applications have been reviewed by the City and approved in the past two years on this property, both of which did not come to fruition. Staff understands the frustration of both the City and developer to find a mutually beneficial and productive reuse of this property. In that vein, if the Planning Commission chooses to approve this application, Staff recommends that the item be tabled until such time that conditions of approval can be drafted that would mitigate as much risk to the City as possible regarding this specific application. Notice Notice was published in the Arden Hills/Shoreview Bulletin and notice was prepared by the City and mailed to residents within 1,000 feet of the subject property. Options & Proposed Motion Language 1. Recommend Denial: Motion to recommend denial of Planning Case 12-002 for a Preliminary and Final Plat, Zoning Code Amendment, and Master and Final PUD at 1201 County Road E based on the findings of fact and submitted plans, as presented in the March 7, 2012,report to the Planning Commission. 2. Table: Motion to table Planning Case 12-002 for a Preliminary and Final Plat, Zoning Code Amendment, and Master and Final PUD at 1201 County Road E in order to provide Staff time to draft conditions of approval. 3. Recommend Approval: Motion to recommend approval of Planning Case 12-002 for a Preliminary and Final Plat, Zoning Code Amendment, and Master and Final PUD at 1201 County Road E...If the Planning Commission chooses to recommend approval of this planning case, specific findings of fact to support such a recommendation must be stated. City of Arden Hills Planning Commission Meeting for March 7, 2012 P:lPlanningl Planning Casesl2012112-002-Holiday Inn Plat and PUD(Pending)W-07-12-PC Report-1201 County Road E PUD.doex Page 12 of 13 Deadline for Agency Actions The City of Arden Hills received the completed application for this request on February 8, 2012. Pursuant to Minnesota State Statute, the City must act on this request by April 8, 2012 (60 days), unless the city provides the petitioner with written reasons for an additional 60 day review period. The City may, with the consent of the applicant, extend the review period beyond the initial 120 days. Attachments A. Application and Supporting Materials B. May 24, 2011, Traffic Analysis C. Staff Comments D. Plan Set City of Arden Hills Planning Commission Meeting for March 7, 2012 P:WlanningWlanning CasesM12112-002-Holiday Inn Plat and PUD(Pending)W-07-12-PC Report-1201 County Road E PUD.doex Page 13 of 13 Attachment Application and Supporting Materials ,AVEN HILLS March 7, 2012, Planning Commission Meeting .t F 4 7 i ,��� �� �, �I'{''�-, [ f XAW y. 1 M. # common area surface finishes will be upgraded as necessary. it is our understanding that the zoning code category to accommodate the foregoing is Single Room Occupancy units. It is our intention to market these apartments to students attending the local colleges and universities along with young professionals looking for a place to call their own while still having the social contact the common area amenities will provide. All residents will be thoroughly screened including back ground check process. The facility will be equipped with state of the art camera systems and 24 hour security staffing. The site worklexterior improvements incorporated in this application are consistent with the site and exterior work approved on November 22, 2010— planning case#10-009 including the construction of a concrete sidewalk; street tree requirements; parking lot lighting; fire sprinkler system; etc. It should be noted the aforementioned case provided for bicycle racks along the exterior of the building while this new development provides for a bike storage area inside the building. Planning case#10-009 required parking lot lighting additions subject to approval of the city planner and county sheriff which continue to be acceptable. RLK has provided an updated traffic study dated 1/30/12 (see attached) and has concluded that a market-rate apartment building will generate fewer trips than the previous hotel use. The apartment use combined with other potential uses on Lot 2 generate approximately the same trip generation as did the previous hotel use. We believe this development lends itself well with the city's B2 District Plan by providing for updated interior building and site improvements. Additionally the apartments will provide additional residential density (consistent with the B2 goals and objectives) and provide residents/customers eager to utilize the local businesses around them via the sidewalks and roadways planned for the B2 District. Sustainability-Arden Halt Apartments as an occupied and vibrant multi-purpose building fully utilizes a property in which our natural resources have already been invested. As one of your staff shared with me... "the'greenest' building is one that doesn't have to be built". We are requesting a lot split into two separate parcels: Lot 1 and Lot 2 (Lot 2 is proposed in concept form). We have secured a permit from Ramsey County to access Lot 2 from Lexington Avenue. Respectfully, Robin C. Davidson The Davidson Companies, Inc. cc: Stuart Nolan r ' ■� � I I �!� L` ■III .,. ._ �` _�_'s_sh�� �' I l ■ - II■ � IIII :I Irk �_ _ '.�II,', ,. 'II' 1 ■ ■II■ I � ■ � �ly�y1. � � M'kl � � ��x• II�11 + � �� ''�a• �.II � � t F '�I l .�+ f I#. I� R I -- �:5 I � J � � I'll ._.�� - ■ ,� � ��:�{,�� ii On IIIIII r I 1,7 Ad y 77 if I Ilan y�h ll +III ti '{ 'I z� �. me sm 0 ISO L Sam 0 1 em 1 on r 0% - ti _ _ ' % ISO _ f - ■ ■ ' r on • 1 • som � 1 i _ :ym : ■ _ % ■ 1 ■ _ .I ■ ■ i ■ _ 1 I ■ � I 5 ■ ' ■ % ■ _ ■ ■ _ _ _ ISO■ 7 ■ ' I � r, i OIL. 1� 1% ■ ■1 r F=21 ON A;k ' ■ iC { r � am _ ' ■■ ISO � Attachment February 7, 2012, Traffic Analysis --A�EN H.Ls March 7, 2012, Planning Commission Meeting Engineering , Landscape Architecture . Planning , Surveying . Traffic INCORPORATED Creating extraordinary Communities MEMORANDUM TO: Rob Davidson rob@davidsoncos.com COPY: Vernon Swing,P.E. vswing@rlkinc.com FROM: Steve Manhart,P.E.,PTOE,PTP smanhart@rlkine.com DATE: February 7, 2012 RE: Traffic Study—Market-Rate Apartment Development& Conceptual Parcel 1201 W. County Road E,Arden Hills,MN RLK Project No.2011-052-M RLK Incorporated has been retained to review the trip generation and traffic impacts associated with the development of the properties in the northwest quadrant of Lexington Avenue and County Road E in Arden Hills, MN. The existing land use consists of a former 150-room Holiday Inn hotel with restaurant/bar and conference facilities. The hotel has closed, and the hotel site had been used until recently as a temporary apartmenVdormitory for a nearby college. The site is now vacant. The hotel site and a vacant parcel at the east end of the site are being considered for reuse. Under consideration for the hotel site is an apartment building to replace the former hotel use. There remain numerous land use options being considered for the vacant parcel to the east. The purpose of this memo is to analyze the traffic impacts associated with the trip generation potential of each land use option and the access considerations to and from the site onto County Road E. Trip Generation For this assessment, RLK used rates and equations found in Trip Generation, Eighth Edition, published by the Institute of Traffic Engineers'. This report lists the numbers of trips that one might expect to be generated by particular land uses based on a variety of variables (numbers of units, numbers of employees,per thousand square feet of floor area,etc.). The trip generation for the site while it was a 150-room hotel was 1,338 trips per day. That included 101 trips to and from the site in the A.M.Peak Hour(7-8 A.M.),and 105 trips to and from the site in the P.M. Peak Hour. The proposed reuse of the former hotel site is to convert the building into a 150-unit market- Trip Generation,Eighth Edition,Institute of Transportation Engineers,Washington,DC,2008 Offices: Duluth • Ham Lake - Hibbing • Minnetonka • Oakdale (952) 933-0972 - 6110 Blue Circle Drive - Suite 100 • Minnetonka, MN 55343 - FAX(952) 933-1153 Equal Opportunity Employer rate apartment building. The building would comprise 150 efficiency apartment units Table 1 shows a comparison of the trip generation potential of the 150-unit apartment building with the 150-room hotel use. Table 1. Trip Generation Comparison—Hotel vs.Mid-Rise Apartment Land Trips Generated: Land Use Type Use Size AM peak PM Peak Weekday Code Enter Exit Enter Exit ADT Mid-Rise 14 31 34 25 998 Apartment Residential 223 150 units 45 total 59 total Hotel Lodging 310 150 rooms 59 1 42 51 1 54 1,338 101 total 106 total This comparison shows that the apartment building will generate approximately 75% of the traffic that was evidenced by the previous hotel use,or nearly 340 fewer trips per day. (This equates to 56 fewer AM peak hour trips and 46 fewer PM peak hour trips.) In regard to the adjacent parcel to the east, several land use types are being considered and the information contained in Table 2 illustrates the trip generation comparison of these uses. These uses vary in size based on the typical building size and parking required for each type. RLK Incorporated Page 2 of 6 February 7,2012 Co.Rd.E&Lexington Traffic Study 2011-052-M Table 2. Trip Generation Comparison—Various Land Use Types Land Trips Generated: Land Use Type Use Size Code AM peak PM Peak Weekday Enter Exit Enter Exit ADT Specialty _ - 24 30 886 Retail Retail 1 814 1 20,000 S .ft. 0 total 54 total Fast-Food Restaurant 76 73 52 49 1,488 w/drive-thru Services 934 3,000 S . ft. 149 total 101 total Community Bank w/drive 21 10 32 33 371 thru Services 911 2,500 S .ft. 31 total 65 total Medical 36 10 19 50 720 Office Medical 720 20,000 S .ft. 46 total 69 total Pharmacy 24 18 83 83 1411 w/drive thru Retail 881 10,000 S .ft. ' 43 total 166 total As shown previously a market-rate apartment building will generate fewer trips than the previous hotel use. Overlaying these trips with those projected for the Lot 2 land uses listed above gives a property- wide view of anticipated traffic demand. Table 3 summarizes the combined totals. RLK Incorporated Page 3 of 6 February 7,2012 Co.Rd.E&Lexington Traffic Study 2011-052-M Table 3. Trip Generation Comparison— Market-Rate Apartments Combined with Various Land Use Types Land Use Land Trips Generated: Combined Type Use Size with Assisted Code AM peak PM Peak Weekday Living Enter Exit Enter Exit ADT Specialty 14 31 58 55 1,884 Retail Retail 1 814 1 20,000 S .ft. 45 total 113 total Fast-Food Restaurant 90 104 86 74 2,486 w/drive-thru Services 934 3,000 S . ft. 194 total 160 total Community Bank w/drive 36 41 66 58 1,369 thru Services 911 2,500 S .ft. 77 total 124 total Medical 50 41 53 75 1,718 Office Medical 720 20,000 S .ft. 91 total 128 total Pharmacy 38 49 117 108 2,409 w/drive thru Retail 881 16,000 S .ft. 87 total 225 total In conclusion, market-rate apartment building will generate fewer trips than the previous hotel use. The apartment use can be combined with other uses on the vacant parcel and still be in approximately the same range of trip generation than the previous hotel use. Traffic Analysis Additional analysis has been conducted to determine the effect trips from these land uses may have on the traffic conditions along County Road E, Lexington and any other adjacent street intersections. Traffic operations for peak hour conditions within the study area were analyzed using the industry-standard SYNCHRO/SimTraffic software package, which uses the data and methodology contained in the 2000 Highway Capacity Manual, published by the Transportation Research Board. The software model was calibrated using existing conditions before being used to assess future conditions. The operating conditions of transportation facilities, such as traffic signals and stop-controlled intersections, are evaluated based on the relationship of the theoretical capacity of a facility to the actual traffic volumes on that facility. Various factors affect capacity, including travel speed, roadway geometry, grade, number and width of travel lanes, and intersection control. The current standards for evaluating capacity and operating conditions are contained in the 2000 Highway Capacity Manual (HCM). The procedures describe operating conditions in terms of a Level of Service (LOS). Facilities are given letter designations from"A,"representing the best operating conditions,to"F,"representing the RLK Incorporated Page 4 of 6 February 7,2012 Co.Rd.E&Lexington Traffic Study 2011-052-M worst. Generally, Level of Service "D" represents the threshold for acceptable overall intersection operating conditions during a peak hour. The acceptable threshold for a particular movement at an intersection depends on both the priority assigned to that movement and its traffic volume. In general,the higher the priority and the higher the traffic volume,the more stringent the acceptable threshold will be. For example,the acceptable threshold for a high-priority/high-volume suburban movement might be"C,"while LOS"F"on a low-priority/low- volume urban movement might be appropriate. For side-street stop-controlled intersections, a key measure of operational effectiveness is the side-street LOS. Long delays and poor LOS can sometimes result on the side street, even if the overall intersection is functioning well, making it a valuable design criterion. Again, depending on priority and traffic volume,acceptable side-street LOS can range from"D"to"F." A final fundamental component of operational analyses is a study of vehicular queuing, or the lineup of vehicles waiting to pass through an intersection. An intersection can operate with an acceptable level of service, but if queues from the intersection extend back to block entrances to turn lanes or accesses to adjacent land uses, unsafe operating conditions could result. The 95ffi percentile queue, or the length of queue with a 5% chance of occurring during the peak hour, is considered the standard for design purposes. To assess the background traffic conditions,RLK used the Existing PM Peak Hour Traffic Volumes that were recorded in the Traffic Impact Study developed as part of the Guiding Plan for the B2 District.2 Access Considerations Along County Road E, access to the development parcels has been limited to two driveways. The westerly site driveway is approximately 975 feet west of Lexington Avenue. The proposed driveway accessing the east side of the apartment building and the conceptual parcel is approximately 425 feet west of Lexington. A central driveway approximately 775 feet west of Lexington previously used for pick- up/drop-off access to the front of the building will be closed. Internal Circulation The internal roadways will allow two-way traffic flow. The westerly drive extends to a parking area at the rear of the proposed apartment building, and then turns easterly to access the parking area for the conceptual parcel. The parking area for the conceptual parcel also can be accessed via the easterly driveway onto County Road E. It is assumed that the cross-access drive in front of the building will operate in a two-way flow,much as it did while a hotel use. To model the distribution of the traffic generated by the market-rate apartments and various uses considered for the conceptual parcel, RLK looked at the trip distribution of the highest generating use being considered. Also, RLK had to determine the directional split of the traffic. For the apartment building, it was assumed that 50% would use the easterly driveway, 50% would use the westerly driveway. For the conceptual parcel,RLK assumed 80%would use the easterly driveway and 20%of the traffic would use the westerly driveway. 2 Traffic Impact Study, Guiding Plan for the B2 District, Arden Hills, NM prepared by Spack Consulting, December 5,2008. RLK Incorporated Page 5 of 6 February 7,2012 Co.Rd.E&Lexington Traffic Study 2011-052-M Based on the trip generation calculations found in Table 2,RLK determined the heaviest trip generator for each time frame as the worst case scenario to be tested. The A.M. Peak Hour trip generation is heaviest with a fast-food restaurant with drive-thru on the conceptual parcel. The P.M. Peak Hour trip generation would be heaviest with a pharmacy with a drive-thru on the concept parcel. In this case, the trip generation for the P.M. Peak Hour exceeds that for the A.M. Peak Hour, thus the P.M. Peak Hour was considered the critical Build Condition for analysis. By applying the site trip distribution to the Existing P.M.Peak Hour traffic, as found in the Spack report, RLK was able to model the Build condition in the P.M. Peak Hour scenario. Levels of service were no worse than LOS-C for any of the study intersections. Delay and stacking distance did not appear to be significant at any of the driveways during the PM Peak Hour. SimTraffic analyses showed a 95 h Percentile Queue length of 51 feet(approx. 2 car lengths)at the easterly driveway,and the model showed the queue cleared rapidly as traffic entered County Road E. Conclusion RLK has tested several scenarios of trip generation and traffic operation for the market-rate apartment site and the conceptual parcel to the east. It is our conclusion that the trip generation and traffic operation associated with these potential uses will operate the same, if not better than the previous use on the site (Holiday Inn hotel). The access locations do not negatively impact the flow of traffic along County Road E,nor do the various proposed trip generators cause increased impacts to the overall street network. GADavidson Companies12011-052-M1_Cocrespondenee\Teaffic Impact Study 02072012.doc RLK Incorporated Page 6 of 6 February 7,2012 Co.Rd.E&Lexington Traffic Study 2011-052-M Attachment Staff Comments ,ARZEN HILLS March 7, 2012, Planning Commission Meeting ,-AVEN HILLS CITY OF ARDEN HILLS MEMORANDUM DATE: February 16,2012 TO: Rob Davidson, TAT Properties FROM: Meagan Beekman, City Planner SUBJECT: Planning Case#12-002 1201 County Road E—Zoning Code Amendment, Preliminary and Final Plat, Master and Final PUD Enclosed are Staff comments based on a February 21, 2012, Development Review Committee meeting. In attendance were Terry Maurer, Public Works Director and City Engineer; Meagan Beekman, City Planner; Dave Scherbel, Building Official; and Sgt. John Eastham, Ramsey County Sheriff. General Comments 1. What will be the process for visitors to enter and leave the building? 2. What rents do you anticipate the project generating? 3. Park dedication fees will apply. The City is continuing to work with the City Attorney and review neighboring communities' codes to determine a reasonable amount. The park dedication amount recommended will be greater than what was approved for Select Senior Housing. 4. Will the property accept Section 8 vouchers? 5. What is the maximum capacity for people living in the building? Would you anticipate rooms where more than 1 lodger lived? 6. How will the phasing work for increasing the number of units from 70? Will a portion of units be converted with demand? Or all at once? 7. If SRO's is where the market is heading in terms of private student housing, please provide examples of other communities that have successfully allowed these types of units. 8. Dave Bethel University and NWC been made aware of your plans? Are they willing to support the concept? Safety and Security 1. Vacant Space—The current plan would leave large areas of the building unoccupied. Experience shows us that these areas, even when secured, wind up being a magnet for criminal activity. 2. Exterior Lighting—The current blueprint does not include a lighting plan. Since proper lighting plays such an important role in crime prevention this is a major concern. Sheriff recommends a minimum of three foot candles on ground level across entire surface of parking lot. 3. Building Access—The current plan does not include any"controlled visitor access" mechanisms. Buildings without these mechanisms have increased calls for service due to the volume of transient traffic. Traffic 1. Traffic study does not recognize right in/right out on Lot 2. 2. Traffic study does not contemplate redevelopment of restaurant facility, which could be significant given the size of the existing facility. 3. The drive aisle from the east parking lot to the Lot 2 property line should be widened to 30 feet. 4. It is unclear that parking demand will be met by the proposed parking spaces given the future reuse of the restaurant facility. 5. If Bethel and NWC students are the target market, agreements between Bethel and NWC to provide transit service would help lower trip generation and parking demand. Lot 2 1. Plans should show a conceptual development on Lot 2 which meets the requirements of the B-2 District, similar to what was shown in the Arden Hall development application. Purpose of conceptual drawing is to show it would be possible to develop Lot 2 in compliance with the Guiding Plan for the B2 District and the Design Standards for the B- 2 District in the Zoning Code. 2. Remove and seed any portion of the existing bituminous parking lot that is not needed by the fire department. Matt Bostrom RAMSEY COUNTY SHERIFF 425 Grove St. a St. Paul, MN 55101-2418 Telephone: (651) 266-9300 Telefacsimile: (651) 266-9301 February 21, 2012 Meagan Beekman, City Planner City of Arden Hills 1245 West Highway 96 Arden Hills, MN 55112 Meagan, Today, at the development review committee meeting, we discussed several safety concerns that surround the proposed development of 1201 County Road E West. As requested, I am sending you a summary of the concerns: • VACANT SPACE—The current plan would leave large areas of the building unoccupied. Experience shows us that these areas,even when secured, wind up being a magnet for criminal activity. • EXTERIOR LIGHTING—The current blueprint does not include a lighting plan. Since proper lighting plays such an important role in crime prevention this is a major concern. • BUILDING ACCESS—The current plan does not include any"controlled visitor access" mechanisms. Buildings without these mechanisms have increased calls for service due to the volume of transient traffic. Please feel free to contact me with any questions regarding this matter. Sincerely, John John Eastham, Deputy Sheriff Crime Prevention/CFMH/CPTED Ramsey County Sheriff's Department 1411 Paul Kirkwold Dr. Arden Hills, MN 55112 651-266-7339 651-266-7337 fax iohn.eastham@co.ramsey.mn.us ADULT DETENTION DIVISION(651)266-9350 CIVIL PROCESS(651)266-9330 PATROL DIVISION(651)266-7300 WARRANTS(651)266-9320 -,-A EN HILLS Re: 1201 County Rd. E This letter is a review of a request for a change of use at the currently vacant Holiday Inn located at 1201 County Road E. This review is done in conjunction with both the City Building department and the Lake Johanna Fire department. The previous use of the building was classified as a hotel with an R-1 occupancy classification. The proposed new use is for apartments. This will result in a new occupancy classification to an R-2. Since the City has adopted chapter 1306 (Special Fire protection Systems) of the State Building Code, any changes in occupancy requires a Fire Suppression system to be installed per NFPA. City staff, along with the Lake Johanna Fire Department, have reviewed this project and have the following items to be completed for this project to move forward. 1. All current life safety measures, both active and passive to be fully operational as originally installed. This includes but not limited to, all penetrations and or alterations to existing fire ratings of walls, corridors, and floor systems. They are to be inspected and repaired to the buildings original condition. 2. All corridor doors to have a minimum of a 20 minute fire rating, and are self closing as originally installed. All doors to be inspected and repaired as needed. (submit letter certifying testing and compliance) 3. Installation of a fully compliant Fire Suppression system according to NFPA 13 throughout the entire building. 4. All fire dampers to be inspected and tested to assure they are in good working condition. (submit letter certifying testing and compliance) 5. All mechanical equipment to be inspected and tested by a licensed qualified company (approved by City prior to inspection and testing)to assure the equipment is in a good, safe operating condition. (submit letter certifying testing and compliance) 6. Any laundry facilities that are to remain or implemented in the building are to be inspected and approved by the City prior to their use. 7. Any kitchen equipment to remain is to be inspected and approved by the appropriate government agency prior to its use. (City, Fire , or Ramsey County Health Department) 8. The installation of a fully addressable fire detection and alarm system according to NFPA 72 throughout the building. (Fire Dept. to approved plans prior to installation.) City of Arden Hills•1245 West Highway 96 •Arden Hills Minnesota 55112 Phone 651.792.7800•Fax 651.634.5137•www.ci.arden-hills.ran.us ,,-ARVEN HILLS 9. All sleeping units are to be equipped with a smoke detection device. Individual unit smoke detectors, upon alarm,to send an addressable notification to a constantly monitored, (24-7) in house location, such as the current front desk. 10. Security to immediately inspect/respond and alert fire/police as necessary. 11. Building security to have emergency procedures reviewed by Lake Johanna Fire department. 12. All existing shafts (laundry, plumbing,rubbish chutes) are to either be sealed with a two hour rated system or a listed and tested opening device. 13. Pull stations are to be installed at all main exit doors and the doors entering stair enclosures at each floor. (remain or change according to NFPA 72) 14. Elevator to be inspected and tested per current state regulations. (submit letter certifying testing and compliance) 15. Installation of a card-controlled building access system. 16. 24 hour security personnel 17. All mechanical equipment and life safety devices/equipment,to be inspected at a minimum, annually. (submit letter certifying testing and compliance) 18. The building shall comply with the state code for accessibility, in particular Section 1113 for Alterations and Section 1114 regarding Change in use. Section 1113.9 requires that at least 20% of the entire project cost goes to accessibility upgrades. 19. All sump pumps in building need to be brought into compliance with City Code. 20. All overflow roof drains that were removed need to be reinstalled per code. 21. A fire department lock box will be installed near main entrance. Lock box on end of building will remain installed. Both lock boxes will be provided with keys determined by the Lake Johanna Fire Department. 22. The building will need to comply with the Minnesota Statute 299F.50 - Carbon Monoxide Alarms for multi-family dwellings. 23. Currently there is no way to evacuate smoke from the second or fourth floor of structure, provide a means to evacuate smoke from these two floors. Means will be approved by fire department. (To remain in the end units) 24. Both the City and Fire Department to inspect and approve the above items before issuance of any certificate of occupancy. Sincerely, Dave Scherbel, Building Official Tim Boehlke, Lake Johanna Fire Chief Rick Current, Lake Johanna Fire Marshal City of Arden Hills•1245 West Highway 96 •Arden Hills Minnesota 55112 Phone 651.792.7800•Fax 651.634.5137•www.cLarden-hills.ran.us Attachment Plan Set EN HILLS March 7, 2012, Planning Commission Meeting 0 fD N7-1 3 0 3 --- o yy � ?c 0 �,N O N n a'A ,,,b NAwIwE AVE G P 2 > Z G) �nm = yarn n 3'� y R t ${ �I m A O 1 Tp 2 p Q' ■�r� C m n� LEIONOTON A1E N ? Nn O 0 0 3 N � 0 O g t —— _MEE DIE LE 1/4.SE 1/4 SEC.27•TW.M.RGE.24 — —— I—OANEfl:OC PROPER DES LLC 1 PIA:27J.D 10010 Orr;R.SE.M.RE 1101-LLC PJ.N.127]02]440010 ry P.I.N.!277021410ptl1 S� / � P.I.N.A 2�]OxN,120PA ao"y'--� I'•--t2 c ___ ui !'itlE EAST UNE OF ME xEI;T 250'SE 1/1,SE 1/4 9:C.27,�.]0,NGE]] -S S 0 36'32" 466.52 ————— / age L-1 '_p I F--f—————---- f (III I I M I I .1-2 11 It r Ili jig: 0 up s se jig ji � � 41 X i 4 P 5Q m " �• , Y >su .� yPH €g ,�� of ps �;ye ��r:� n 19 I i l� / :/• / � pg3 'dQ RBur fig rq �g C j I I 1'•' _ - O I O - - on m ■■ ° fps PR IF I i I I ' / �4� >?6 �x 97, i� I� I IMA IN- IN I g $Z F a= 9PIZ PrI2-0 I I I I rn a °III 9a s°� �z ^rn s� • - ion qIV T1CO to NIA III / 1 ° �go I (7 CA 1 I ill l l' I N Quo aaz 3+QAZg tt #P$3' Y rY P G) E L r ?°• F $ gg y a F "' r S 0'1 B-41"E 292.05 PS 9 Pcp�g $ t ° Y g`9 �Y p D � " 1-I' -I/, I/ 2' Ii ; n F§ a c� Z �t I I :l: � • z� 6$ III r� SL � p� ; 3 ; eq � � ��� F'F � � � fig+ I Ids! I I l I / '//^-may, l v, "■'' "F .o H I 3 i l z N I / c s s Q giIs = I O I Zj IFr7 2- � cn -0 At aC� I N 039'24" W 204.88 1 �' 245 € _ {3�_ N PN■.IC ROM N 0]9'24 2B1 ] /�'_ �i P � s P LEXING I-ON AVENUE g C) o � a' g Z? a° n lE a s m 2 m8 toN g o rn 4 r~n p a 3 ' z mh Ln O �, �f7 g A T o dam -Gz n v ^ f Nqo xz b •C S� r A � A " rn 3J z Z o b 'O EXISTING BUILDING I O v �4 ;d .................m I ......... CD 3 — : g ' ................ C/o 4 -qj-q . e .9 o N TTT m ......... 4 ...- z. ti ......r..9a3.. x F ....w.. o �.i motl� z v xn� � e yyn ^'mi;itz uP° � ,.•E o 10.0 �75� z r- � �"' ---`al: z I o ��4�> oI �/ � � O � C D m z 000 Ln a g o n — z m, Z.e........., Q t J -°°.m O .....i / m'1x, ...................... : im < < c •1 m .�.70 k o f / Cm 0 rmn I O �j N\n- 1 u/ y. \N O 24.0 n Ia A i•. Y 0 +- yy > N x N n I g = y z some. O a l 'o -F WD Nn /f 00 a 62.0 ` `+....._ ......... ... I ;. : . t� a..J yi;.;' m '9 z rnl tl0 osz a.m m O ;:teU. ..>F y�v Qno ` J •r <. Drrt biW O�IN O r - 2m tit / Cp C+rtn.P O 40 ` n _ S. .. •r.:•: .:... N coo N {�1 bo ��W W z "' 5 :. , Op o ur a I.^ V N Q cT'r o r w rH 1•� All[ N W 0 mtiL ! T: pW.+ITT W to m m �6_ K I;ifii o OZ gp�� m steYNcz / a f� y I 2 — > am O z i ..._ ..... ...._.... ..... ;:gib ....................... tnrc � 1 - - - - - - - - - - - - mx '_...rr1-1 0 y .......... u O V V N % D c N y y z S! S! z Z 2 � � Z � y oo� G On O n Y I g o i 1-. z o m�N4F� l n - ; a s "' x a s ; A p M N 'L I G T. 1......-. A N U E " o � g � m � ; � � � o mmo sa�8 — :ado O H o 1^iti z � � o � o o tlz 44 H n n z F z z o $ NI — m• -<o' � gm �7N�1 4 m 9 > I hereby certify that this plan was prepared by me DATE REVISION DESCRIPTION A ? i z or under my direct supervision and that I am a n n 6 P g O-fu o m o x z D DAYIDSON ADDITION duly Licensed Professional Engineer under the g a G) z m v<a laws of iha State of Mi c; m� g� � 33 _m _ 0 $ y 0,56 Arden Rills INnnesotf A 'I oN c ^'? CONCEPT SITE,DRAINAGE d ADAM GIN L N zo z $ ONiG iG UTILITY PLAN DATE: 01.09.9012 LIC.NO. 43963 i EXISTING BUILDING T v CA CA 4. I t N N \ 63 ero E \ N y T zz k CD\ / 0WX N•pFT C„ c): 6.4 D_� m R / 6,1 w AM Z 6.1 2Q'1 O lO.fn Z D / NmX\a o �N - \♦ \ \ / a m s m �o z \ \ \ m m cZi A m i.+ xD we F D GZ') Z z F I. N o �C_ a a .j y s \ D D I.. II II II II N II O o / N aoo w0 (A W HHC. INN 24.0 ��/ /� w NxOm O I\, _ o I — rn = �w �e m D rn FTIf \\ — / Q A Z a�$ lz 62.0 \\ \\ , I \ \\\\ \\ \\ \\ \\\ \\ / z z rm I .... a a r r 5 rm o n = n m m > � Go m / 0 II II II II II -� 00 S m V 00 A o cm _ • I .., P O N O zz P N N O D N I m r0 �m C m D 3 .v.m S / O I m c m O O ca m N Dm D9 3 u n D9 GI�D� A O C 3�om - �a_Y"q� �� F om m P m _ orb* dams a 2A -zy a � o OD * �l'3m 2a yoo 9 > o > �Or N - 3 S 4o CC - ....;..,,. m me 's �. z 0 a It. a PPI 5 o ��w �_ N Z w Z "r-I 1 �ppl nE i' = m �' x o x !!n y 4 N C rr, r x I c� p •h m O c _ �^ --I O o n n c c 0 gigLEXINGTON A NUE " + oul 4 m O O O m ��g z m m y Ooo � � \ � u -< < pg v y e HAM A G m zc DATE REVISION DESCRIPTION o n n g i _ =:O i =og<a DAYIDSONADDmON S _ o 52 o $' i = m _ Z° Arden Nllls Mlimesola m A o S I LANDSCAPE PLAN " m i7 N. o — - - — — Cfl D e°000 MICRO. BY - TYPICAL UNIT PLAN TENANT SCALE: 11¢"=1'-m" UNIDEP- - — COUNTER REF. I � - INTERIOR ELEVATION 'A' SCALE: u up —=r M C) b ;Pmg 00 0I3 N5>5 ® mm1 VEND 5 b MG O O N m w p 3 T Q ®®®® 0 Z o EVEWM NFlow E° O oIn K A � Cp Elm 47 Tr CEERI cym 0 A D UlD 'fl r . 0 0 On 3= AI 3 0 p cn'i 3= L 't J J l J � 1 ,-ARZEN HILLS MEMORANDUM DATE: March 7, 2012 PC Agenda Item 3.B TO: Planning Commission FROM: Meagan Beekman, City Planner SUBJECT: Planning Case#12-005 -This application requires a PUBLIC HEARING Applicant: Christine Osgood Property Location: 1268 Amble Road Request: Home Occupation Conditional Use Permit Requested Action The applicant has requested a Conditional Use Permit for a home-based marriage and family therapy establishment,which is a Class lI Conditional Accessory Home Occupation in the R-1 Zone. Background 1. Overview of Request: The property is located at 1268 Amble Road and is zoned R-1. The applicant is a licensed therapist and is seeking to convert one of the rooms in her home into a home office where she will see a limited number of clients for the purpose of marriage and family counseling. According to the applicant,the business would be by appointment only and would not involve any signage or changes to the exterior of the structure. Plan Evaluation 1. Home Occupations City of Arden Hills Planning Commission Meeting for March 7, 2012 P:\Planning\Planning Cases\2012\12-005-1268 Amble Road-Home Occupation CUP(Pending)\03-07-12-PC report-1268 Amble Road CUP.doc Page 1 of 4 Section 1325.02 Subd. 3.A of the Zoning Code regulates all home occupations in the City. The Code states that all home occupations shall comply with the following: 1. It shall not result in traffic, parking, noise, light, fumes and odors to such an extent that it is noticeable that the property is being used for non-residential purposes. 2. It shall be conducted entirely within the dwelling. 3. There is no exterior evidence of the home occupation. 4. It does not require any special entrances to the dwelling. 2. Class II Conditional Accessory Home Occupations. Section 1325.02 Subd 3.0 of the Zoning Code goes on to specify the regulations for Class II home occupations, which describes the activity being requested by the applicant. The Code states that home occupations may be allowed by conditional use permit if they meet the following conditions: 1. The primary business activity shall be conducted by an occupant of the residence; 2. One person not residing in the residence may be employed to assist in the business activity; 3. It does not occupy more than thirty-three (33) percent of the floor area of the dwelling; 4. It has a limited number of patrons visiting the premises; 5. Off-street parking for no more than two (2) additional vehicles other than those required by the occupants shall be permitted. On-street parking shall not be used to satisfy required parking; and, 6. It requires delivery of products to the premises no more than once per day. Discussion According the applicant, all requirements, as listed above would be met with the exception of the off-street parking requirement. The applicant is proposing to host a once-monthly seminar, which would require parking for up to five vehicles. According to the regulation, no more than two additional vehicles may be permitted for a home occupation, and no more than four vehicles are permitted to be parked in any driveway in a residential district. City of Arden Hills Planning Commission Meeting for March 7, 2012 P:\Planning\Planning Cases\2012\12-005-1268 Amble Road-Home Occupation CUP(Pending)\03-07-12-PC report-1268 Amble Road CUP.doc Page 2 of 4 The Code does not dictate parking allowances for on-street parking, other than regulating the parking of vehicles over night, nor does the Code regulate the number of vehicles a home can have for non home occupation purposes. Staff s opinion is that a once-monthly seminar would have little if any impact on parking, and would blend in with the parking trends of a single- family residential neighborhood. Findings of Fact Staff offers the following findings of fact regarding this planning case: General Findings 1. The property is zoned R-1 2. Class II Accessory Home Occupations are allowed in the R-1 District with an approved Conditional Use Permit 3. The applicant proposes to convert a room in her home into an office to see a limited number of clients 4. The proposed home occupation is classified as a Class I1 Accessory Home Occupation Home Occupation Findings 5. The proposal will not result in increased traffic, parking, noise, light, fumes and odors to such an extent that it is noticeable that the property is being used for non-residential purposes. 6. The proposed use will be conducted entirely within the dwelling. 7. There will be no exterior evidence of the home occupation. 8. The proposal does not include any special entrances to the dwelling. 9. The business will be owned and operated by the applicant, Christine Osgood. The applicant is a resident of the dwelling. 10. The applicant has indicated that the home occupation will not need any additional employees. 11. The proposed use would less than the 33 percent of the total floor area of the home. 12. The proposed use would have a limited number of patrons visiting the home, as the applicant would only be seeing one client at a time, by appointment. 13. Due to the limited number of clients, the existing driveway offers sufficient off-street parking; however, once-monthly meetings may require additional on street-parking, during the day. 14, The proposed use is unlikely to require product deliveries at any frequency greater than once per day. City of Arden Hills Planning Commission Meeting for March 7, 2012 P:\Planning\Planning Cases\2012\12-005-1268 Amble Road-Home Occupation CUP(Pend ing)\03-07-12-PC report-1268 Amble Road CUP.doc Page 3 of 4 Staff Recommendation Staff recommends approval of Planning Case 12-005, based on the findings of fact and the submitted plans, as presented in the March 7, 2012, report to the Planning Commission. Subject to the following conditions: 1. The conditional use permit shall not be transferable to other individuals. 2. The applicant shall comply with all sections of the City Code, including no more than four vehicles parked in a driveway at any one time. 3. Any changes to the structure shall require review and approval from the Building Official. Notice Notice was published in the Arden Hills/Shoreview Bulletin and notice was prepared by the City and mailed to residents within 350 feet of the subject property. Staff has not received any comments regarding this application. Options 1. Recommend approval as submitted. 2. Recommend approval with conditions. 3. Recommend denial with reasons for denial. If the City denies the petitioners request, "...it must state in writing the reasons for the denial at the time it denies the request." 4. Table for additional information. Deadline for Agency Actions The City of Arden Hills received the completed application for this request on February 6, 2012. Pursuant to Minnesota State Statue,the City must act on this request by April 5, 2012 (60 days), unless the city provides the petitioner with written reasons for and additional 60 day review period. The City may, with the consent of the applicant, extend the review period beyond the initial 120 days. Attachments A. Application and statement from the applicant B. Site Plan and Air Photo City of Arden Hills Planning Commission Meeting for March 7, 2012 P:\Planning\Planning Cases\2012\12-005-1268 Amble Road-Home Occupation CUP(Pending)\03-07-12-PC report-1268 Amble Road CUP.doc Page 4 of 4 For Office Use Only E� HILLS Planning Case No, 12- �ll� � Submittal Date 1245 West Highway 96 Application Completed Date Arden Hills, Minnesota 55112 Accepted by Telephone (651) 792-7800 Receipt Number Fax 651 634-5137 Council Decision 1www.ci.arden-hills.mn.us1 Council Decision Date 2012 LAND USE APPLICATION Applicant Information Applicant: t;HK16T1 (J lc 066000 Address: 1110 S 1Dt1M(3 L E; RD1k.D A V .O M Ft I L 4 ; MN 155111 Telephone No.: 105( . 24'1. 0545 Other: b'25 1. 3 6 7, (*311 Fax No.: NIA Email Address: oS9 ck r @ WA-t 1G1•eAu Property Information Property Owner: G"D 3 a4i"c'riNt o5cioop Owner Address: 12-69 Am a t r:% "AD A •P . K&M sSi IZ OwnerTelephone No. 641 . 2-41. OS4S Other: (Al. 3S'l. (i 311 Address of Property Involved: I1615 AM 9 UE� "Af) A"eN 11 l t.LS PAN 5-012 Legal Description: 15 c K 151b 1--+ of W 9S V+ TIC W Z l0 F+ of LOT- q Property ID No.: '72.30. 23. 13. 00710 Type of Use: StN&IL6 FAMtV4 NyNLE Zone: 1�5IpCw-rI AL Property Acreage: ,e13 AcR-4S Type of Request ❑ Planned Unit Development Amendment($600; $300 if ❑ Comprehensive Plan Amendment ($850+$1,000 no Site Plan Review is required + $2,000 escrow) escrow) ❑ Site Plan Review ($300 + $600 escrow) Conditional/Interim Use Permit or Amendment ❑ Rezoning ($600 + $1,000 escrow) ($600; $300 if no Site Plan Review is required ❑ Zoning or City Code Amendment($600 +$1,000 + $600 escrow) escrow) ❑ Preliminary Plat($600 +$25 per lot+ $1,500 ❑ Minor Subdivision (lot split/consolidation) ($450 + escrow) $1,000 escrow) ❑ Final Plat($500 + $25 per lot) ❑ Variance (Zoning Code) ($300 +$600 escrow) ❑ Concept Planned Unit Development($300) ❑ Vacation of Easement or Right-of-Way($400 + $600 ❑ Master Planned Unit Development($600 + $2,000 escrow) escrow) ❑ Appeal of Administrative Decision ($100) ❑ Final Planned Unit Development ($300.00+ $600 ❑ Land Use Requests—Not Already Specified ($200) escrow) Revised: 12-08-11 Page 1 of 3 Brief Description of Request''_ ;ase also include a typed, detailed letter ealaining the roject : I Wduc,O LAY-e pf-NtlsSloN To vsE A SMA-UL, N " k+Mf, -CO SEE ('LAWJ ,5 Q-A I Am A lkAA9_?-IPC.S OOJ.D FA►ti1 t 1 T�fy ACPI ST• *IMPORTANT* Certain applications are subject to review and approval by the Rice Creek Watershed District. Contact RCWD directly at 763-398-3070 for additional information. The land use application fees do not cover building, sign, or other permit fees that may be required upon approval of a land use application. All applications will be subject to additional fees for reimbursement of consultant costs associated with filing, reviewing, and processing of application in the form of an escrow to the City. IS MOVIE Filing & Information Requirements The City requests that you make a pre-application meeting with the City Planner to discuss the application process, requirements, and deadlines. Unless waived by the City Planner or Planning Commission, a certified survey of the property is required for all applications. The Planning Commission and/or City Council may still require a certified survey. A checklist for other required information is also available. CompleteAncomplete Applications An incomplete application will delay the processing of land use requests. The application approval time commences and an application is considered officially filed when the City Planner has received and examined the application and determined that the application is complete. A decision on whether the application is complete or incomplete shall be made within fifteen (15) working days following the submittal of the application. When the application is deemed to be "complete" it shall be placed on the agenda of the first possible Planning Commission meeting provided that all required public notices have been sent and published. Payment of Fees The undersigned acknowledges that she/he understands that before a land use application can be deemed complete, all required information and fees (including all deposits) must be paid to the City. If additional fees are required to cover costs incurred by the City,the City Planner has the right to require additional payment from one or more of the undersigned, who shall be jointly liable for such fees. Such expenses may include (but are not limited to) direct city payroll and overhead costs, fees paid to consultants and other professionals, and the cost of printing, mailing, and supplies. The City may withhold final action on a land use application, withhold building permits, and/or rescind prior action until all miscellaneous fees have been paid. Applicants are advised that an escrow deposit is required at the time of the submittal of the land use application to offset costs associated with the proposed project. Unused portions of an escrow are returned to the applicant upon successful implementation of an approved plan. Notice of Meeting Attendance In order for the Planning Commission and the City Council to consider any application, the applicant or a designated representative must be present at the scheduled meeting. If not, the matter may be tabled until the next available agenda. Revised: 12-08-11 Page 2 of 3 Agenda Deadline and Meeting Schedule The deadline for submittal of land use applications is required according to the schedule outlined below. There are no exceptions. Planning Commission meetings are typically held on the first Wednesday after the first Monday of each month at 6:30 PM, though please contact City Hall to verify the meeting date and time. City Council meetings are held typically the last Monday of the same month at 7:00 PM. Meetings are held in the Council Chambers at the City of Arden Hills, 1245 West Highway 96, Arden Hills, Minnesota 55112, unless otherwise stated. Applicants are advised that additional meetings and/or workshops are scheduled when necessary upon approval of the Planning Commission. 2012 SCHEDULE (subject to change) TENTATIVE TENTATIVE PLANNING CITY COUNCIL APPLICATION COMMISSION MEETING DEADLINE MEETING DATE* DATE* DATE* (Generally held on the first Wednesday after the first (Generally held the Monday at 6:30 .m. last Monday at 7:00 p.m.) Janua 9 Februa 8 Februm 27 March 5 Aril 4 Aril 30 May,7 June 6 June 25 July 2 Au ust 8 y August 27 4 September 10 October 3 October 29 November 5 December 5 December 26 Acknowledgement and Signature I acknowledge that I have read all of the information listed in the City of Arden Hills Land Use Application and fully understand that I am responsible for all costs incurred by the City related to the processing of this application. Prop yrte Owner Signatu (Required)z;k224 ZA • G - /a- Applicant Signature (If di Went than the property owner) Date Please contact the City Planner at (651) 792-7800 if you have any questions regarding this application. Additional copies of this application form are available on the Citys website htt .Ilwww.ci.arden-hills.mn.us Revised: 12-08-11 Page 3 of 3 ■ � R ■ 1 ■ ■ ■ ■ ■ NEW mllll�m ■ long ■ ■ I� I Ki MCFF ="6= I ti ■ 1 ■ ■ y ' ■ llIF Mf II'r 10, 7t ■ L "T^' I i� � � �' ru III ■ .� - I�' .o.�y. r�� =1 h'11f.T�n as II •'i 22II �-h�� _ II {�' 7E III ■ II .t'I I� I• �LI IfAI 0 w 0 V 11 r Zmr M..�re % ONE 0 'o P rl tomm ■ ' tONE . % % ■ NO IN ME "■ NO ■■ �dem ■r. ■ r . ■ 1■ " ■ -■ ME ■ ■ % . . . . F % . r, NEE % % ONE Q I ki ! im -ARZEN HILLS MEMORANDUM DATE: March 7, 2012 PC Agenda Item 4.A TO: Planning Commission FROM: Meagan Beekman, City Planner SUBJECT: 2012 Work Plan and Project Priorities Discussion Requested Action Discuss possible goals and project priorities for 2012, and produce a list of items to discuss with the City Council at the March 19, 2012, work session. Background The City Council has asked that the Planning Commission join them for a work session discussion on March 19, 2012 to discuss goals and priorities for 2012. This discussion will include projects, zoning code amendments, and things to focus on in the coming year. To assist in that discussion, Staff would like the Planning Commission to provide input to Staff on topics that might be addressed at the March 19 meeting. While the Council will make the final determination as to what the goals and priorities are for the upcoming year, it will be useful for them to have a discussion with the Commissioners about these items. City of Arden Hills Planning Commission Meeting for March 7, 2012 P:Wlanningl City Council Memos12012W-22-11-PC and CC Joint Work Session-2011 Goals and Project Priorities-Memo.docx Page 1 of 3 Discussion The Planning Commission differs from the City's other committees and commissions in that the purpose and scope of the Commission's work is largely determined by State Statute. The review and evaluation of the City's various Land Use Applications,Zoning Code Amendments,and other planning related projects takes up the vast amount of the Commission's focus and time. For the most part, Planning Commission agendas are filled with these items, and Planning Staff spends most of their time preparing and evaluating these projects to be brought before the Planning Commission. The Bethel University Wellness Center is an example of a planning case which is anticipated in the upcoming year, and will likely take a considerable amount of Staff and Planning Commission time. That being said,there are occasions when it is appropriate for the Planning Commission and Staff to step back and evaluate the efficacy of our processes and ordinances. A number of suggestions for improvements to the Zoning Code have come up over the last year,both from Commissioners, Councilmembers, and Staff. If planned out appropriately, it may be possible to prioritize these items and time them throughout the year to assure that the Planning Commission and Staff can give them proper review and evaluation. A number of these items are listed below. Please feel free to add your own suggestions and ideas. A discussion of these items is necessary to prioritize and identify a list of three or four projects. The scale and amount of work that could potentially go into each of these items differs,and should be part of the discussion. 1. Adoption of wetland setbacks within the Zoning Code 2. Develop a Parks and Open Space Zoning District and rezone the City's park areas and the balance of the TCAAP and AHATS property 3. Major revision of the City's Subdivision Ordinance 4. Revise the City's bike parking requirements 5. City of Arden Hills Planning Commission Meeting for March 7, 2012 P:W lanninglCity Council MemosUOM02-22-11-PC and CC Joint Work Session-2011 Goals and Project Priorities-Memo.docx Page 2 of 3 6. 7. Staff will take notes and produce a list that will guide the March work session discussion. Based on the outcome of the Council's meeting with the Planning Commission, Staff will finalize the priority projects and report to the Planning Commission. Planning Commission and City Council Training Opportunities As part of the 2011 goals, there was discussion about training opportunities for Councilmembers and Planning Commissioners regarding land use planning and the law. The League of MN Cities offers an e-learning land use series as part of their loss control program. All of the Planning Commissioners and Councilmembers were signed up to participate. To date there are still some that have not completed the course. The League, which provides liability insurance to Arden Hills,has found that cities that have Commissioners and Councilmembers who are educated about land use law and make sound rulings are less likely to be sued, or to lose lawsuits when they are filed. The website-based training is designed to make land use decisions less confusing, and will help cities avoid expensive land use claims and lawsuits. Government Training Services (GTS) also offers land use planning courses. Additional information will be provided when dates and locations are set for that series. These courses are designed for Councilmembers and Planning Commissioners, and are typically offered in full and half day sessions throughout the Twin Cities. The courses are very well done and provide a wealth of information regarding land use fundamentals. The Council has decided that participating in at least one of the GTS courses, as well as participation in the League's e-learning courses, at least once during your term be mandatory in order to serve on the Planning Commission and be able to be considered for a subsequent term. City of Arden Hills Planning Commission Meeting for March 7, 2012 P:WlanninglCity Council Memos12012W2-22-11-PC and CC Joint Work Session-2011 Goals and Project Priorities-Memo.doex Page 3 of 3 i ,- 1ZEN HILLS MEMORANDUM DATE: February 8, 2012 PC Agenda Item 5.A TO: Planning Commission FROM: Meagan Beekman, City Planner SUBJECT: Report from the City Council February 13,2012, City Council Meeting The City Council approved (4-1; Holmes dissenting) Planning Case 12-001 to allow the expansion of nonconforming single and two-family structures under certain circumstances. The ordinance went into effect on February 23, 2012. The Planning Commission unanimously recommended approval of this item at the February 8, 2012, meeting. The City Council unanimously approved Planning Case 12-003, revising the City's parking regulations. The amendment consolidated all parking regulations into one section, and clarified the regulations to make them more enforceable. The ordinance did not have a hearing before the Planning Commission because it did not affect any portion of Chapter 13,the Zoning Code. The City unanimously approved the hiring of a new full time Assistant City Engineer. John Anderson will start later in March. The City is restructuring its joint powers agreement with Roseville to bring engineering services in house. The agreement continues to allow both cities to share engineering resources including GIS mapping services,but does not require Arden Hills to pay for a set number of hours per year. At a work session on February 13, 2012, the Council heard a concept proposal from the Salvation Army to redevelop the vacant 1300 Grey Fox Road, formerly Eastside Beverage, into a warehouse, processing and distribution center, with associated residential facilities for up to 130 men participating in their Adult Rehabilitation program. Salvation Army currently operated their facility in downtown Minneapolis, but is looking for a new home. The Council did not provide clear direction at the work session,but has asked the Salvation Army to come back to a future work session to discuss in depth specific questions raised by the Council. More information will follow. City of Arden Hills Planning Commission Meeting for March 7, 2012 PAPlanning0anning Commission\CC Reports\03-07-12-PC report-CC report.doc Page 1 of 2 March 19, 2012, Joint City Council and Planning Commission Work Session Staff has scheduled a joint work session with the Planning Commission and City Council for 6:30 pm on March 19, 2012. The purpose of the work session is to discuss goals and a work plan for the Planning Commission for the coming year. Staff would ask the Planning Commissioners to begin thinking about possible projects and Zoning Code updates that might be proposed to the City Council for this year. This will be further discussed at the March 7, 2012, Planning Commission meeting. City of Arden Hills Planning Commission Meeting-for March 7, 2012 PAPlanning0anning Commission\CC Reports\03-07-12-PC report-CC report.doc Page 2 of 2