HomeMy WebLinkAbout8B, Booster Station Roof Repairi � � I � � EN HILLS ' � ; � Request for Council Action ; I � � -----------------_ _---------__ ________--------__----�---_--____-------_._---------_____.__---___------�-- � Prepared By: Terry Maurer, Public Works Director � Council Meeting Date: July 9, 2012 Booster Station Roof Repair Budgeted Amount: Actual Amount: Funding Source: $20,000 $14,614 Water Utility Fund Recommendation: Council is requested to authorize proceeding with the booster station roof replacement based on the quote of $14,614 received from Commercial Roofing and Sheet Metal, Inc. Supporting Documents: 1. Memorandum dated July 9, 2012, from Terry Maurer, Public Works Director. 2. Letter dated June 26, 2012, from Commercial Roofing and Sheet Metal Inc. � �`.�EN,�HILLS MEMORANDUM DATE: July 9, 2012 TO: Honorable Mayor and City Councilmembers Patrick Klaers, City Administrator FROM: Terry Maurer, Public Works Director SUBJECT: Booster Station Roof Repair Back�round At the June 18, 2012, Council Work Session regarding the 2013-2017 CIP, the roof repair at the water booster station was briefly discussed. Staff had proposed the roof replacement as a 2013 project with a budget of $20,000 but had indicated that the roof was leaking again after several patch attempts and this time it was leaking very near the electrical control panel. Therefore, staff indicated that we would look at replacing the roof in 2012 rather than attempting another patch. Commercial Roofing and Sheet Metal, Inc., of Little Canada is on the state contract for roof repair. They inspected the booster station roof on June 26, 2012, and provided the attached estimate of $14,614 to complete the roof replacement. The only additional item listed in their quotes is $1.25 per square foot to replace any wet or deteriorated roof insulation. The new roof would be a 60 mil membrane and would carry a 10 year warranty. As a comparison, last September staff asked for a similar quote from Palmer West Construction Company, Inc., (not a state contract contractor) for basically the same wark with the exception of the 11/2" isocyanurate roof insulation and building permits included in the Commercial Roofing and Sheet Metal estimate. Last year's estimate was $15,430. Staff believes the Commercial Roofing and Sheet Metal Inc., quote from a state contract contractor is a very competitive price for this work. We would also recommend proceeding with this work in 2012 rather than pursuing another spot repair and waiting to replace the entire roo£ Council Action Requested Council is requested to authorize proceeding with the booster station roof replacement based on the quote of $14,614 received from Commercial Roofing and Sheet Metal Inc. City Council Meeting C:\Users\sonja.kl ingberg�DesktopV-9-12BoosterStationRoof. doc Page 1 of 1 Commercial Roofin� & Sheet Metal Inc. 221 Ryan Drive Llttle Ganada, MN. 55117 Phone: 651-483-5?�8 Fax: r"o51-483-5387 June 26, 2012 City of Arden Hills 1245 West Highway 96 Arden Hills, MN. 55112 Attention: Joe Mooney RE: 2012 Reroofmg Arden Hills Pump Station 1230 Red Fox Road Arden Hills, MM. 55112 Approximately 700 Sq. Ft. Observations: I took a look at the above named project today and completed a survey of the existing system. The roof consists of a ballasted EPDM roofing membrane on 3" of polystyrene roof insulation on a concrete plank deck. The roof edge detail is a canted wood edge with the EPDM extending over the outside edge and aluminum fascia. The membrane is pulling loose at the perimeter and the aluminum flashing is loose in several locations. We would recommend removing the existing membrane and installation of additional insulation and a new membrane and flashings. I have put together a proposal below with our recommendations. Reroofing Proposal. 1. Obtain any necessary permits. 2. Remove the existing ballast and save for reinstallation. 3. Remove and properly dispose of the existing membrane, base flashings and sheet metal flashings and dispose of all materials in an approved landfill. 4. Replace any wet or deteriorated roof insulation at a unit price of $1.25 per sq. ft. 5. Install an additional layer of 1%2" isocyanurate roof insulation on top of the existing insulation to bring the new R valne to 22.22 meeting current state codes. 6. Install additional wood blocking at the roof edge to accommodate the new insulation thickness. 7. Stagger all joints in the insulation. 8. Install a reinforced fastening strip at the roof edge and curbs. 9. Install a new 60 mil EPDM roofing membrane and all related flashings in strict accordance with the manufactures specifications. Commercial Roofin� & Sheet Metal Inc. 221 Ryan Drive Little Ganada, MN. 55117 Phone: r'o51-483-5298 Fax: ro51-483-5387 10. Fabricate and install new 24 gauge prefinished sheet metal hook over and counter flashings. Color to be selected from manufacture's standard color charts. 11. Fabricate and insta112 new scuppers and downspouts from prefuushed sheet metal at the existing locations. 12. Furnish a manufacture's standard ten (10) year warranty. 13. Clean up all materials and debris and return the site to its original candition. We propose to furnish labor and materials as specified above for the lump sum of Fourteen Thousand Six Hundred Fourteen and 00/100 Dollars ............$14,614.00 This proposal is based on field measurements and existing conditions as examined at the site on June 26th 2012. Note: All work to be charged under the State of Minnesota Repair Contract #18427 If you need any other information or have any questions please feel free to contact me. Sincerely, Scott J r Commercial fing Company ardenhills6-2G-2012 2