Loading...
HomeMy WebLinkAbout8A, 2012 Seal Coating, Crack Filling and Bituminous Patching� EN HILLS j � ; Request for Council Action � ; � _ ___ --- --. _ _.._ --- --._ _. _ __ ____. _ � ____ __ -- --- ._. __ ---___ -- ___ _ _ __. Prepared By: Terry Maurer, Public Works Director I Council Meeting Date: July 9, 20l 2 2012 Seal Coating, Crack Filling and Bituminous Patching Budgeted Amount: Actual Amount: Funding Source: $215,000 $215,000 or less Capital Improvement Fund Recommendation: Council is requested to authorize entering into contracts with Pearson Brothers, Inc., for seal coating, Gopher State Sealcoat for crack filling and Rum River Contracting for mill and patch work. Staff will keep the total of all three contracts and the previous awarded Fahrner Asphalt Sealers contract (Trail-Mat patch) under the CIP budget of $215,000. Supportin� Documents: 1. Memorandum dated July 9, 2012, from Terry Maurer, Public Works Director. 2. Page 27 of 2012-2016 CIP. 3. 2012 Street Maintenance Diagram. � EN HILLS MEMORANDUM DATE: July 9, 2012 TO: FROM: SUBJECT: Honorable Mayor and City Councilmembers Patrick Klaers, City Administrator Terry Maurer, Public Works Director � 2012 Seal Coating, Crack Filling and Bituminous Patching Back�round No seal coating, crack filling or bituminous patching was completed in 2011 as staff reviewed the City's program for maintenance of the street infrastructure. The monies programmed in the 2011 CIP were moved to 2012 and combined with this year's funds for a one time total of $215,000 (attached is the sheet from the CIP). This year's plan is twofold. Seal coat streets from PMP projects between 2006 and 2009 and recently crack filled streets along with preparing the streets that are anticipated to be in the next few years' seal coat projects so the contracts may be let early in the year and do not have to wait for the streets to be prepared (these areas are shown on the attached exhibit). Then moving forward this will be the typical approach; seal coat and prepare the next year's seal coat project with crack filling, and/or bituminous patching. Staff has received bids for seal coating and asked for quotes for crack iilling and bituminous mill and patch work. The following is a summary of the prices received: A. Seal Coating Bid Results 1. Pearson Brothers Inc 2. Allied Blacktop Co. B. Crack Filling Quotes 1. Gopher State Sealcoat 2. Fahrner Asphalt Sealers LLC 3. Bargen Inc $104,345.34 114,413.75 $12,456.50 17,972.95 18,684.75 City Council Meeting P:�Admin\Council�Agendas & Packet Information�2012\07-09-12 Reg Mtg�Packet\7-9-12SealCoatEtc.doc Page 1 of 2 C. Bituminous Mill and Patch 1. Rum River Contracting $55,549.20 2. Diversified Paving Inc 58,633.68 3. T.A. Schifslcy 69,972.00 The seal coat bid is per square yard, the crack filling quote is per linear foot, and the mill and patch quote is per square yard. Previously, with the trail seal coat quotes, staff asked for a Trail-Mat quote to patch the raveling on Arden Oaks Drive prior to seal coating the street. Adding the low bid/quote for each item r.esults in the following total: l. Seal Coating (Pearson Brothers, Inc) $104,345.34 2. Crack Filling (Gopher State Sealcoat) 12,456.50 3. Bituminous Mill and Patch (Rum River Contracting) 55,549.20 4. Trail-Mat Patch (Fahrner Asphalt Sealers, LLC) 2,500.00 Total Estimated Cost $174,851.04 With each bid/quote on a unit basis, there is some opportunity for overruns if the City directs that more of the units be applied. This is the reason staff has kept the estimated costs under the CIP budget amount of $215,000. It would be staff's intent to accomplish all of the seal coating shown on the attached exhibit including patching all of the raveled areas on Arden Oaks Drive. With the remaining budget, staff would work forward to prepare other streets indentified on the attached exhibit, for future year's seal coating projects by crack filling and bituminous patching. Council Action Requested Council is r.equested to authorize entering into contracts with Pearson Brothers, Inc., for seal coating, Gopher State Sealcoat for crack filling and Rum River Contracting for mill and patch work. Staff will keep the total of all three contracts and the previous awarded Fahrner Asphalt Sealers contract (Trail-Mat patch) under the CIP budget of $215,000. City Council Meeting P:�Admin\Council�Agendas & Packet Information�2012\07-09-12 Reg Mtg�Packet\7-9-12Sea1CoatEtc.doc Page 2 of 2 1.�1 Improvement Plan , of Arden Hills, Minnesota # 12-StrS-061 �vame 2012 Crackseal and Sealcoat 2,�12 thru 2016 Department StreetDepartment Contact Public Works Director Type Operational Maintenance Useful Life 5 to 10 yrs Category Streets: Cracksealing & Sealco Priority n/a Total Project Cost: 5215,000 ;s�,.Y---- seal coating or crack filling was performed in 2011 as the street system was being analyzed. The $100,000 budget for this work in 2011 has n moved to 2o 12 and combined with the $115,000 already budgeted in 2012 for a total of $215,000. ierally the areas planned to be crack filled/seal coated in 2012 are the 2006 PMP, 2007 PMP and mill/overlay project, 2009 PMP and Arden �s Dr area. „�..___--- �1 coats waterproof the surface to keep the pa�ement from becoming brittle, cracking, and prevent water from seeping through the pavement an xsing problems to the base material. Seal coats also provide low-severity crack sealing, and restore surface friction. It is a maintenance practice extend the life of paaement. SeaI coating can be performed at any time in the life of a pavement and lasts an average of five to ten years. Expenditures 2012 2013 2014 2015 2016 Total Construction/Maintenance 215,000 215,000 TotSl 275,000 215,U00 Funding Sources 2012 2013 2014 2015 2016 Total Capital Improvement Funds (PI 215,000 215,000 Total 215,000 215,000 Budget Impact/Other ( �eal coats help waterproof the pa�ement to prevent water from seeping through to the base material. It is a mamtenance prachce to extend the hfe �f pa�ement. This reduces the number of potholes that develop, thereby reducing patching costs. Produced Using the Plan-I[ Capital Planning Sofhvare Thz�rsday, November 17, 2011 27 � �� HILLS aryoiaa� o.p.ro�e�� flYtel 2072 Sealcoat ■ ■ 2012 Crack Seal 2012 Bituminous Patching Repair � Mill and Patch � Cui and Patch � N 0 250 5D0 0�0 Fee� � Legend 2012 Street Maintenance Sealcoat