Prepared By: Terry Maurer, Public Works Director Council Meeting Date: August 13, 2012
Order Feasibility Study for 2013 PMP
Budgeted Amount: Actual Amount: Funding Source:
$1,534.00 (overhead & $1,534.00 PIR, Enterprise Fund,
construction) Special Assessments
Recommendation:
Adopt Resolution No. 2012-027 Ordering the Preparation of the Feasibility Report for the 2013 Pavement
Management Program.
Supporting Documents:
1. Memorandum dated August 13, 2012, from Terry Maurer, Public Works Director.
2. Copy of the CIP detail sheet.
3. Area exhibit.
4. Resolution No. 2012-027.
lt
EN HILLS
MEMORANDUM
DATE: August 13,2012
TO: Honorable Mayor and City Councilmembers
Patrick Klaers, City Administrator
FROM: Terry Maurer, Public Works Director `(1�
SUBJECT: Order Feasibility Study for 2013 PMP \ 'd
Background
The 2012 thru 2016 Capital Improvement Plan (CIP) contains an item for the 2013 PMP
in the amount of$1,534,000 (a copy of the CIP detail sheet for this item is attached). The
area of the 2013 PMP is shown on the attached exhibit. The streets included in this area
are Edgewater Avenue, Glenhill Road, Asbury Avenue and Ridgewood Road. Planning
and design for this project was anticipated to begin in 2012 and $55,000 of the total CIP
budget is shown to be used in 2012 for planning/design.
Discussion
As with previous PMP's the Feasibility Report will include a geotechnical investigation,
topographic survey of the area, an analysis of the existing sewer and water systems,
preliminary design of the street improvement, cost estimate and proposed assessment.
With the addition of the Assistant City Engineer position, the Feasibility Report will be
completed by staff with the exceptions of the geotechnical investigation and the
topographic survey.
As part of the Feasibility Report a neighborhood informational meeting will be held at
City Hall. At that meeting an overview of the potential project, timing and estimated cost
and assessment will be presented. Given the recent discussion with the City Council
regarding the reconstruction of city streets, with or without concrete curb and gutter; both
options will be presented along with cost and assessment ramifications to solicit input to
be used by the City Council in making the final decision regarding the design of the
street. Information from the informational meeting, including minutes, will be made part
of the Feasibility Report.
City Council Meeting
P:\Admin\Council\Agendas&Packet Information\2012\08-13-12 Reg Mtg\Packet\2013PMPOrderFeaibilityStudy.doc
Page 1 of 2
Attached is Resolution No. 2012-027 Ordering the Preparation of the Feasibility Report
for the 2013 Pavement Management Program. If the City Council adopts this resolution
initiating the Feasibility Report, staff will solicit quotes for the topographic survey and
present them at a future Council meeting.
Council Action Requested
Adopt Resolution No. 2012-027 Ordering the Preparation of the Feasibility Report for the
2013 Pavement Management Program.
City Council Meeting
P:\Admin\Council\Agendas&Packet Information\2012\08-13-12 Reg Mtg\Packet\2013PMPOrderFeaibilityStudy.doc
Page 2 of 2
Capital Improvement Plan
2012 thru 2016 Department Street Department
Contact Public Works Director
City of Arden Hills, Minnesota
Type Improvement
Project# 14-Str-064 Useful Life 30
Project Name Ridgewood Asbury--2013 PMT Category Streets:Reconstruction
Priority n/a
Total Project Cost: $1,534,000
Description
Asbury Ave from City Limits to Edgewater
Ridgewood Rd from City Limits to dead end
Edgewater from Asbury to Ridgewod Rd
Glenhill from Asbury to Snelling
Estimated Residential Equivalent Units:37
Justification
Asbury Ave,City limits to Glenhill, 2005 PCI=75,2008 PCI=76,2011 PCI=74
Asbury Ave,Glenhill to Edgewater,2008 PCI=82,2011 PCI=70
Ridgewood Rd,City limits to Glenhill, 2005 PCI=47,2008 PCI=58,2011 PCI=66
Ridgewood Rd,Glenhill to dead end,2008 PCI=67,2011 PCI=36
Edgewater,Asbury to Ridgewood, 2005 PCI=59,2008 PCI=38,2011 PCI=34
Glenhill,Asbury to Snelling(TH 51)2005 PCI=68,2008 PCI=66,2011 PCI=51
There is a minimal existing storm sewer system.The project must meet Rice Creek Watershed District requirements.The proposed storm sewer
system will take into account runoff from the City of Roseville(to be cost-shared).The project will also improve water quality to Lake Johanna.
,Improvements will be made to the sanitary sewers stem as needed to correct any I&I deficiencies.
Expenditures 2012 2013 2014 2015 2016 Total
55,000 120,000 175,000
Planning/Design 1,359,000
Construction/Maintenance 1,273,500 85,500
Total
55,000 1,393,500 85,500 1,534,000
Funding Sources 2012 2013 2014 2015 2016 Total
869,000
Capital Improvement Funds(PI 25,000 788,500 55,500 55,000
Sanitary Sewer Utility Fund 5,000 47,500 2,500
350,000
Surface Water Mgmt Utility Fu 15,000 317,500 17,500 260,000
Water Utility Funds 10,000 240,000 10,000
Total
55,000 1,393,500 85,500 1,534,000
Budget Impact/Other
The street has deteriorated past the point where other forms of maintenance are cost-effective. Long-term,reconstruction will provide a consistent
roadway section that will reduce costs associated with patching potholes and other pavement failures. Monitoring/maintenance wit be required for
new stormwater features that are not resident-maintained rain gardens.
Thursday,November 17,2011
Produced Using the Plan-It Capital Planning Software 40
f �
S. f
J F=:v
i 5 !
v Johanna
O
W
"
w O
4-
_ GL
EN HILLS
CITY OF ARDEN HILLS
COUNTY OF RAMSEY
STATE OF MINNESOTA
RESOLUTION NO. 2012-027
RESOLUTION ORDERING THE PREPARATION OF FEASIBILITY REPORT FOR
THE 2013 PAVEMENT MANAGEMENT PROGRAM
WHEREAS, it is proposed to improve the following streets:
Asbury Avenue from Edgewater Avenue to City limits
Edgewater Avenue from Asbury Avenue to Ridgewood Road
Glenhill Road from Asbury Avenue to Ridgewood Road
Ridgewood Road from cul-de-sac to City limits
and to assess the benefited property for all or a portion of the cost of the improvement,
pursuant to Minnesota Statutes, Chapter 429,
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF ARDEN
HILLS MINNESOTA:
That the proposed improvement be referred to the 2013 Pavement Management Program for
study and that the City Engineer is instructed to report to the council with all convenient
speed advising the council in a preliminary way as to whether the proposed improvement is
necessary, cost-effective, and feasible and as to whether it should best be made as proposed
or in connection with some other improvement, and the estimated cost of the improvement as
recommended.
ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS
THIS 13th DAY OF AUGUST,2013.
David Grant,Mayor
ATTEST: