Loading...
HomeMy WebLinkAbout2B, Water Meter Reader Installation Update EN HILLS Request for Council Action 2B Prepared By: Terry Maurer,Public Works Director Work Session Date: September 17, 2012 Water Meter Reader Installation Update i Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A Recommendation: Staff requests Council give direction on how to proceed with the remaining properties that need to have a new water meter reader installed. Supporting Documents: 1. Memorandum dated September 17, 2012, from Terry Maurer, Public Works Director. lt EN HILLS MEMORANDUM DATE: September 17, 2012 TO: Honorable Mayor and City Councilmembers Patrick Klaers, City Administrator FROM: Terry Maurer, Public Works Director \ SUBJECT: Water Meter Reader Installation Update Background Thus far the water meter reader replacement project has been an overwhelming success. Midwest Testing, the contractor hired to do the installs, started July 11 to and continued for three weeks. City staff then sent out a second letter to those property owners who had not responded and Midwest Testing came back to town for about two more weeks in late August. The program started with a total of 2,685 meter readers to be changed; of this number 2,444 are residential meters. At this time we have 14 commercial/industrial installs that we are waiting for the correct parts. There are also 14 vacant properties that we are continuing to track down owners through realty companies and/or local maintenance companies to try to gain access to make the install. There have been no property owners that have refused access for the install. In addition to these, there are about 58 residential (approximately 2% of total meters) properties that have not responded to the two mailings, door knocks and door hangers. It should be noted that the second mailing told property owners that the old technology was no longer usable and without the new reader installed future water bills would be estimated. There are a few options the City could pursue to try to get these last 2% installed. These include the following: 1. Following our City Ordinance, a third letter could be sent by certified mail stating that if a new water meter reader is not installed by a certain date the property's water would be shut off until the reader is installed. This would be the most direct way to ensure maximum compliance. City Council Meeting C:\Users\sonja.klingberg\Desktop\9-17-12WaterMete ReaderUpdate.doc Page 1 of 2 2. A third letter could be sent indicating a surcharge would be added to the quarterly water bill starting the 4t' quarter of 2012 and will continue until a new reader is installed. If this course is chosen, staff would suggest a $100 surcharge as a way to get the attention of the property owner. 3. A third option could be to do nothing but continue with estimated quarterly water bills until there is an event at each property that would allow for the install to occur. This could be a complaint about the estimated bill, sale of the property or other problem with the water service or meter at each of the last few properties. It should be noted, that in addition to the meter reader installs, Midwest Testing reviewed all of the commercial/industrial meters and rendered an opinion about whether the right type of meter was being used. This resulted in about 10 Turbo meters being changed out for Compound meters that read much smaller amounts of water. For instance, some of the Turbo meters removed only started reading at 7-20 gallons per minute while the new compound meters installed will read as low as one-quarter gallon per minute. This should increase the amount of water usage billed to these properties. In addition, 259 old residential plastic water meters were found to be still in use and were replaced with new meters that are more reliable. Council Action Requested Give staff direction on how to proceed with the remaining properties that need to have a new water meter reader installed. City Council Meeting P:\Admin\Council\Agendas&Packet Information\2012\09-17-12 Wk Sess\Packet\9-17-12WaterMete ReaderUpdate.doc Page 2 of 2