HomeMy WebLinkAbout7A, Annual National Pullutant Discharge Elimination System (NPDES) Public Meeting 'It
,-AR EN HILLS
Request for Council Action 7A
Prepared By: Kristine Giga, Civil Engineer&
John Anderson P.E.,Assistant City Council Meeting Date: May 14, 2012
Engineer
Annual National Pollutant Discharge Elimination System (NPDES) Public Meeting
Budgeted Amount: Actual Amount: Funding Source:
N/A N/A N/A
Recommendation:
Hold the annual National Pollutant Discharge Elimination System (NPDES) public meeting as required
for the Municipal Separate Storm Sewer System(MS4)General Permit.
Supporting Documents:
1. Memorandum from Kristine Giga and John Anderson dated May 14, 2012.
lt
-` IZEN�HILLS
MEMORANDUM
DATE: May 14, 2012
TO: Honorable Mayor and City Councilmembers
Patrick Klaers, City Administrator
FROM: Kristine Giga, Civil Engineer
John Anderson P.E., Assistant City Engineer
SUBJECT: NPDES Annual Storm Water Meeting
Background/Discussion
As of March 10, 2003,the Minnesota Pollution Control Agency required all cities within the
Seven County Metro Region to apply for a General Storm Water Permit(Small Municipal
Separate Storm Sewer Systems, or MS4, permit) as part of Federal National Pollutant Discharge
Elimination System (NPDES) requirements. In order to comply with new federal regulations,
municipalities were required to develop a Storm Water Pollution Prevention Plan (SWPPP) that
focuses on ways the municipality will reduce the amount of sediment and pollution entering the
surrounding water bodies. The SWPPP includes six minimum control measures that need to be
addressed by the City. Each measure is aimed at reducing the amount of pollution entering water
bodies through various methods such as public outreach and education, regulatory ordinances,
and physical structures constructed as a part of the storm water sewer system. Each control
measure includes several Best Management Practices (BMPs) that will be used to accomplish the
measure and each will include measurable goals that can establish the effectiveness of the
SWPPP.
One of the permit requirements is that the City must hold an annual public meeting to allow
interested parties to provide comments to the City on its SWPPP. The City is also required to
submit an annual report to the MPCA documenting the accomplishments of the previous year.
The public information meeting will cover the minimum control measures, discuss the
accomplishments of 2011 and the goals for 2012.
Council Action Requested
No action required.
City Council Meeting
P:\Admin\Council\Agendas&Packet Information\2012\05-14-12 Reg Mtg\Packet Information\5-14-12Memo_MS4AnnualMtg.doc
Page 1 of 1